Winnipeg Free Press - PRINT EDITION

Massive transformers to be hauled 144 km

A 320-tire self-propelled modular trailer (SPMT) similar to one once used to transport the space shuttle Endeavour through the streets of Los Angeles has a special assignment in Winnipeg beginning Sunday.

It will be used to haul the first of three massive transformers from a manufacturing plant near Pembina Highway to Manitoba Hydro's Riel Station east of the city.

Each transformer is worth $5 million and weighs 175,000 kilograms when prepared for transport. The first will hit the road Sunday at 8 p.m., departing from the CG Power Systems Canada plant on Rockman Street.

Because of the size of the cargo, the SPMT must take a circuitous route some 144 kilometres long. It will travel at a glacial speed of five km/h, exiting the city via McGillivray Boulevard, rumbling down highways 3, 75 and 59, among other roads, as it winds its way to its destination.

Each of the transformers will take three days -- or, rather, three nights -- to arrive at the Riel station.

The route was designed to avoid tight city streets and narrow overpasses.

"It's probably the biggest single piece of equipment we've had to move," said Hydro spokesman Glenn Schneider.

The objects are being billed as the heaviest ever transported by road in Manitoba.

The transformers are being installed to enhance the reliability of Manitoba Hydro's 500,000-volt line linking the province's grid to Minnesota. The line handles the bulk of the utility's power exports and imports.

When disassembled for shipping, each transformer measures about seven metres tall by four metres wide. However, when fully assembled with bushings, insulators, cooling units and other accessories, to be added on site, each will stand almost 12 metres tall, and measure 9.6 metres across.

The weight of each fully assembled transformer will be almost 295,000 kilograms. By comparison, an empty 747-400 jumbo jet weighs 179,000 kilograms.

The 320-wheeled SPMT allows the tremendous weight of the transformers to be distributed evenly over a large area of road, preventing damage to the concrete and asphalt.

Information on lane closures will be available toll-free at 511, at www.mb511.ca or by following the Twitter account @MBGovRoads.

larry.kusch@freepress.mb.ca

Republished from the Winnipeg Free Press print edition November 3, 2012 A8

You can comment on most stories on winnipegfreepress.com. You can also agree or disagree with other comments. All you need to do is register and/or login and you can join the conversation and give your feedback.

Have Your Say

New to commenting? Check out our Frequently Asked Questions.

The Winnipeg Free Press does not necessarily endorse any of the views posted. By submitting your comment, you agree to our Terms and Conditions. These terms were revised effective April 16, 2010.

letters

Make text: Larger | Smaller

LATEST VIDEO

Elijah Harper lies in state, hundreds pay respects

View more like this

Photo Store Gallery

  • Marc Gallant / Winnipeg Free Press. Local- WINTER FILE. Snowboarder at Stony Mountain Ski Hill. November 14, 2006.
  • A pelican comes in for a landing Wednesday afternoon on the Red River at Lockport, Manitoba - Standup photo- June 27, 2012   (JOE BRYKSA / WINNIPEG FREE PRESS)

View More Gallery Photos

Poll

Are you going to see 100 Masters at the WAG?

View Results

Ads by Google