Shower stall update flows smoothly

Basement bathroom reno in Norwood Flats stands tall

Advertisement

Advertise with us

Basement bathrooms can be tricky: the floor often has a slope towards a nearby floor drain, and the available space is often limited. The lower-level lavatory of a house in Norwood Flats was due for a shower stall update. And although carefully planned from the start, it’s difficult to anticipate every potential hurdle until the job begins. Fortunately, the minor obstacles encountered were not that hard to overcome.

Read this article for free:

or

Already have an account? Log in here »

To continue reading, please subscribe:

Monthly Digital Subscription

$0 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*No charge for 4 weeks then price increases to the regular rate of $19.00 plus GST every four weeks. Offer available to new and qualified returning subscribers only. Cancel any time.

Monthly Digital Subscription

$4.75/week*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*Billed as $19 plus GST every four weeks. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

No thanks

*Your next subscription payment will increase by $1.00 and you will be charged $16.99 plus GST for four weeks. After four weeks, your payment will increase to $23.99 plus GST every four weeks.

Hey there, time traveller!
This article was published 22/10/2022 (1119 days ago), so information in it may no longer be current.

Basement bathrooms can be tricky: the floor often has a slope towards a nearby floor drain, and the available space is often limited. The lower-level lavatory of a house in Norwood Flats was due for a shower stall update. And although carefully planned from the start, it’s difficult to anticipate every potential hurdle until the job begins. Fortunately, the minor obstacles encountered were not that hard to overcome.

A corner shower stall can vary in shape and size. Typically, the standard setup for a true corner shower with either squared base or rounded, will span roughly 36 inches in both directions. The homeowner’s existing shower was squared, with a shower door at a 45-degree angle facing into the big of the space. It had clearly been there for a long time: the silicone was peeling and had begun to fail, the glass panels of the shower stall walls were milky and laced with years of hard water sediment accumulation, and the drain had obviously received a few attempts at re-sealing through the years. Within a day, the entire shower unit, as well as the old shower base and existing shower faucet were completely removed for the shower remodel.

The corner would receive a new pre-fab and rounded shower base, rounded glass shower walls with curved French doors, new tile on the walls and a new shower faucet and head, with an independently mounted hand-wand. The shower base measures 38 by 38 inches along the adjacent corner walls, with a rounded face that gives the illusion of a 90-degree stall, when in fact it is closer to 110-degrees as it protrudes from the walls at an obtuse angle from inside that stall, providing greater interior shower space.

Photos by Marc LaBossiere / Winnipeg Free Press
                                Although the shower stall is tucked in the corner, the curved clear glass doors make the space feel larger.

Photos by Marc LaBossiere / Winnipeg Free Press

Although the shower stall is tucked in the corner, the curved clear glass doors make the space feel larger.

The old water feeds must be adapted to accommodate the new shower faucet and hand wand. Once the faucet assembly is mounted at the desire height at the midway point of the stall wall, the feeds are thusly connected and tested. The hand-wand outlet is also mounted in the desired location, and connected to the faucet. With the water feed pre-prep completed, the walls are sheathed with mold-resistant drywall, to the top of the shower base. All seams are siliconed, and allowed to dry and set until the following day.

Before setting the new base into position, the alignment of the drain stack and shower base drain are confirmed. The base is pre-prepped with the decorative drain, and the base is pre-shimmed to ensure level all around. The base is then permanently set onto the drain stack, using ABS adhesive and the appropriate silicones and sealants where required. With the base in place, and the shower faucet assemble mounted with drywall installed, it was time to begin tiling.

For this project, the homeowners chose a mid-sized rectangular tile, light beige in colour with marble-esk grains and striations. And to avoid the brick-look, the tiles were arranged horizontally, in vertical columns. The tiles were cut to accommodate the various faucet amenities, and a vertical bracket was mounted near the corner for the adjustable hand-wand cradle. The very next day, the entire area was grouted with a light-beige resin-based grout. Along the bottom edge of tiles nearest the shower base, the seam was sealed with silicone.

On the final day, the rounded glass French-doors (specifically made for this shower base) were installed. The static panels on found at both walls were first mounted to the upper and lower tracks. The static panels were then affixed to the walls once the best level and plumb was established. With the glass door framework in place, the two sliding doors were lifted into the upper and lower tracks, adjusted for a smooth glide and leveled accordingly. Any area where the lower track or static panels meet the shower base and/or tiled walls respectively, received a thin bead of clear silicone to seal the entire stall before use.

Lastly, the shower base was siliconed along the vinyl flooring, to prevent and water from seeping into and under the base, especially where shimmed. Due to the extreme slope of the basement floor (near the main floor drain in the adjacent utility and laundry room), a substantial amount of white silicone was used, gradually building the bead along the largest gap to provide a consistent look from one wall to the other, along the curvature of the shower base front. A few days later, the homeowner chose a suitable colour for the walls and painted the entire space, before repopulating the bathroom for use.

The shower is only about 38 x 38 inches along the walls but curves outward.

The shower is only about 38 x 38 inches along the walls but curves outward.

The shower stall project is a success. Although it had been a project on hold for quite some time, the homeowner had clearly done his homework and choose the appropriate items, based on the dimensions of the existing shower stall, and the requirements of the space. And having the items delivered to the jobsite well in advance allowed the project to flow quite smoothly, over the course of roughly a week. Time and money well spent, ensuring many years of shower enjoyment to come.

RenoBoss.Inc@outlook.com

A new shower faucet, isolated wand, and shower head provide a beautiful and functional upgrade to this basement bathroom.

A new shower faucet, isolated wand, and shower head provide a beautiful and functional upgrade to this basement bathroom.

Report Error Submit a Tip

Renovation & Design

LOAD MORE