Bipole project could make Manitoba ‘energy superpower’: Kinew

Premier Wab Kinew says the $7-billion, overdue overhaul of two major hydro transmission lines in Manitoba is an investment opportunity and part of the “building blocks to be an energy superpower” — but won’t say how the cost will impact customers.

Read this article for free:

or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 16/07/2025 (373 days ago), so information in it may no longer be current.

Premier Wab Kinew says the $7-billion, overdue overhaul of two major hydro transmission lines in Manitoba is an investment opportunity and part of the “building blocks to be an energy superpower” — but won’t say how the cost will impact customers.

The Free Press reported Tuesday that maintenance and upgrades on the high-voltage direct current (HVDC) lines of Bipole I and II will require a 3.5 per cent annual rate increase every year for up to 15 years. On Wednesday, the premier called it an opportunity “to flex our economic muscle.”

“Over the next two decades, Manitoba Hydro is going to spend in the ballpark of $30 billion on acquiring new electrical equipment: to renew our HVDC lines, to ensure that the lights keep running — no matter how cold it gets in winter, how hot it gets in the summertime, and to do that in a low emissions manner,” Kinew said at an unrelated news conference in Brandon.

Maintenance and upgrades on the high-voltage direct current (HVDC) lines of Bipole I and II will require a 3.5 per cent annual rate increase every year for up to 15 years. (Manitoba Hydro / Supplied)
Maintenance and upgrades on the high-voltage direct current (HVDC) lines of Bipole I and II will require a 3.5 per cent annual rate increase every year for up to 15 years. (Manitoba Hydro / Supplied)

His NDP government ran on keeping hydro rates affordable, and froze them for one year after winning the 2023 provincial election. In March, Manitoba Hydro asked the Public Utilities Board to approve an 11 per cent increase over three years starting in 2026.

Kinew said the government would invest in putting tens of thousands of Manitobans to work, creating jobs on First Nations and in Métis communities. The NDP has rejected private wind power projects but endorsed Indigenous-owned proposals with private sector involvement.

“We’ve got hundreds of megawatts of low-carbon electricity that we can use to build the future in our province,” he said.

Kinew will meet with Prime Minister Mark Carney and his fellow premiers next week to discuss tariffs and the trade war launched by U.S. President Donald Trump.

“Manitoba can come to the table and say, ‘What are we doing, Team Canada? Are we going to keep spending that $30 billion in procurement … on American companies and on building up the economy under the Trump administration? Or, are we going to work together and send a message to our American neighbours (and) keep building our province into being a clean energy superpower by working with countries that treat us well?’”

The premier said it was time to invest in tradespeople, engineers and consultants in Manitoba.

“That’s how we build up our economy — no matter which way we go with tariffs, which way we go with AI. We’ve got a lot of great cards to play and we’re gonna play them to the advantage of Manitobans.”

Progressive Conservative hydro critic Lauren Stone said she’s concerned the premier is bluffing, and that Manitobans may lose their shirts.

“I don’t think the NDP are being forthcoming with the state of Manitoba Hydro. We’re gonna be watching this project very closely. We know that the NDP have a history of financially mismanaging major hydro projects,” Stone said Wednesday, referring to the construction of Bipole III and the Keeyask generating station, that saw a combined $3.7 billion in cost overruns.

“We’re gonna be watching this project very closely.”–Lauren Stone

That led to Hydro’s debt soaring to $24.6 billion. The public utility has said 33 cents of every dollar Manitobans pay on their electricity bill goes towards interest payments on the debt.

“It just doesn’t seem that they have a grasp on the needs of Manitoba Hydro and what the future costs for ratepayers will be. I’m certainly concerned about that,” said Stone.

Kinew called the PCs the greatest threat to Manitoba Hydro.

“There’s more power in a donut at Tim Hortons than the PCs have brought online during their recent time in government.”

MIKE DEAL / FREE PRESS FILES
                                Premier Wab Kinew will meet with Prime Minister Mark Carney and his fellow premiers next week to discuss tariffs and the trade war.

MIKE DEAL / FREE PRESS FILES

Premier Wab Kinew will meet with Prime Minister Mark Carney and his fellow premiers next week to discuss tariffs and the trade war.

A spokesperson for the Canadian Taxpayers Federation said taxpayers should be worried about any Hydro megaprojects.

“Governments of all stripes should be working to complete these costly infrastructure projects on budget and on time so taxpayers and ratepayers aren’t stuck paying even more interest on Hydro’s debt for cost overruns,” Gage Haubrich said.

Kinew said, as it relates to cost overruns, they’re taking the time to get it right.

“It’s going to be carefully scoped, there’s going to be contingency plans and we’re going to work with partners who have experience in doing this,” the premier said. “The good news is Manitoba Hydro is pretty much the most experienced company around when it comes to large-scale HVDC projects.”

The Bipole upgrades are required if Manitoba wants a reliable energy grid, said a University of Winnipeg political science professor who studies Crown corporations.

“If it’s -30 here, and we lose power, we’re all refugees in two days,” said Malcolm Bird. “System reliability is just absolutely paramount. Obviously, this is going to affect rates, but that’s part of the price that we have to pay for the electricity.

“Power is so cheap in this province — it’s almost too cheap.”

Next to Quebec, Manitoba has the lowest electricity rates in Canada.

“It’s kind of this cultural, God-given right to have cheap electricity, which is great, but that means that we’re often not fully covering the costs. These capital costs are a part of the cost — capital investments that have to be made,” Bird said.

carol.sanders@freepress.mb.ca

Carol Sanders

Carol Sanders
Legislature reporter

Carol Sanders is a reporter at the Free Press legislature bureau. The former general assignment reporter and copy editor joined the paper in 1997. Read more about Carol.

Every piece of reporting Carol produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

 

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

Report Error Submit a Tip

More Stories

Spike in safety concerns doesn’t feel like harm reduction

Rebecca Chambers 4 minute read Preview

Spike in safety concerns doesn’t feel like harm reduction

Rebecca Chambers 4 minute read Yesterday at 5:39 PM CDT

It’s after dinner when a couple of young boys appear on my porch. I recognize them from the neighbourhood, but they’re not here to ask my kids to come out for a game of basketball. Instead, one asks, “Is it OK to come in for a little bit. There’s a guy out there and he’s scaring us.”

Read
Yesterday at 5:39 PM CDT

Puzzles Palace

1 minute read Monday, Jul. 13, 2026

To solve our puzzles, please subscribe with this special offer: |

Turnover contributes to mistakes in Manitoba’s financial reporting: AG

Carol Sanders 5 minute read Preview

Turnover contributes to mistakes in Manitoba’s financial reporting: AG

Carol Sanders 5 minute read 6:29 PM CDT

A report by Manitoba’s auditor general says errors continue to occur in the province’s financial reporting.

“The preparation of the public accounts is inherently complex and requires a co-ordinated effort across government,” Tyson Shtykalo said in his 60-page report. “It is not an easy task, and reducing the number of errors and deficiencies will require sustained focus from both the office of the provincial comptroller and departments.”

The auditor general looked at the public accounts from April 2020 to September 2023 and has since followed up to determine whether problems it identified have been corrected. Thursday’s report made 18 recommendations to reduce errors and improve reporting.

Shtykalo said the system, in which deputy ministers oversee departments, is decentralized, and there’s the need for ongoing guidance and training.

Read
6:29 PM CDT

Searchers continue looking for older sibling, one day after younger boy’s body recovered

Zoe Pierce 5 minute read Preview

Searchers continue looking for older sibling, one day after younger boy’s body recovered

Zoe Pierce 5 minute read Updated: 4:50 PM CDT

NUTIMIK LAKE — The parents of two boys who drowned in Whiteshell Provincial Park Saturday say they are surviving their “unimaginable” loss only because of the overwhelming support they have received from the community.

On Thursday, RCMP divers, the Hutterian Emergency Aquatic Response Team and civilian volunteers traced across Nutimik Lake, drones hovered above the waterway, and media lined the beach as the search for Aaron Au Ramirez, 13, continued. The body of 10-year-old Maximo Au Ramirez was found Wednesday evening.

The siblings entered fast-moving rapids at Sturgeon Falls on Nutimik Lake while visiting the area with their father and friends. Maximo slipped off rocks into the water, and Aaron went in to try to save him, RCMP have said.

In a statement read by RCMP Staff Sgt. Cory Meyers Thursday afternoon, the boys’ parents described their grief as “terrible, horrible, and unimaginable.”

Read
Updated: 4:50 PM CDT

Photos reveal ‘pretty nasty’ scene inside flooded Dauphin hospital

Morgan Modjeski 5 minute read Preview

Photos reveal ‘pretty nasty’ scene inside flooded Dauphin hospital

Morgan Modjeski 5 minute read 6:33 PM CDT

Prairie Mountain has released 22 photos depicting the muddy mess in the Dauphin hospital left by floodwater last month that has shut down the regional facility for as long as a year.

Dauphin Mayor David Bosiak said he understands the photos were released in response to criticism from some who wonder why the hospital will be closed for as long as a year.

“(The public) needed to see the scale and the scope of the damage,” he said. “And the pictures that PMH released today, I think have really opened people’s eyes as to what’s gone on at the hospital.”

He said 80 people are working to clean the filthy facility in conditions that are “less than ideal.” Sections of the hospital still have no power and there’s no air circulation as a result.

Read
6:33 PM CDT

City dermatologist penalized again for misconduct

Chris Kitching 6 minute read Preview

City dermatologist penalized again for misconduct

Chris Kitching 6 minute read Tuesday, Jul. 21, 2026

A Winnipeg dermatologist has been allowed to continue practising — albeit with a reduced scope — after pursuing a relationship with a female patient and seeing another patient without a required chaperone at a time when his office was normally closed.

A College of Physicians and Surgeons of Manitoba inquiry panel, in a June 30 disciplinary decision, said it was concerned with Dr. Earl Minuk’s level of contrition and future compliance, while noting his pattern of violating professional boundaries.

A shortage of specialists factored into the decision to allow him to continue to practise.

“CPSM carefully considers the need to protect the public while balancing the need for access to care. Dr. Minuk’s expertise includes managing a condition that can be disfiguring if left untreated,” the college said in a statement Tuesday.

Read
Tuesday, Jul. 21, 2026