‘Historic day’: two-year demolition of Arlington Bridge begins Piece-by-piece removal, working around trains makes job challenging

The first pieces of the Arlington Bridge, a long-deteriorating Winnipeg landmark, were removed Thursday morning, nearly 115 years after it was built.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

The first pieces of the Arlington Bridge, a long-deteriorating Winnipeg landmark, were removed Thursday morning, nearly 115 years after it was built.

A portion of the city’s longest bridge directly above the CPKC railway lines was the first to be taken away as part of a two-year demolition project.

The bridge was built in 1912 and closed suddenly in November 2023 due to structural issues.

Damir Muhurdarevic, the city’s Bridge Project Engineer, tells the media how the spans are going to be removed. (Mike Deal / Free Press)

Damir Muhurdarevic, the city’s Bridge Project Engineer, tells the media how the spans are going to be removed. (Mike Deal / Free Press)

Mayor Scott Gillingham called it a “historic day” as crews worked to dismantle the bridge.

“Today marks the start of what council has decided needs to happen. The bridge needs to come down,” Gillingham told reporters near the blocked-off bridge.

Decommissioning and removing the bridge will occur in two stages. The first will involve removing the south part of the bridge from Logan Avenue into the CPKC rail yard. The second phase, slated to begin in 2027, will work north at Dufferin Avenue.

The bridge will be pulled out piece by piece, lowered to the ground and demolished, said Damir Muhurdarevic, the city’s bridge projects engineer.

The demolition will proceed in 15-minute intervals to work around the trains, which will continue operating.

Winnipeg Mayor Scott Gillingham (centre) was on hand to watch the start of the historic bridge’s removal, talking to media with some city councillors on hand (from left) Janice Lukes, Ross Eadie and Vivian Santos. (Mike Deal / Free Press)

Winnipeg Mayor Scott Gillingham (centre) was on hand to watch the start of the historic bridge’s removal, talking to media with some city councillors on hand (from left) Janice Lukes, Ross Eadie and Vivian Santos. (Mike Deal / Free Press)

“It’s a challenge, the logistics of the operations of the railroad yard is complicated beyond anything I’ve ever experienced,” Muhurdarevic said.

The demolition of the bridge above the rail yard will be completed by the end of August.

“This is a very intricate project, you can appreciate there’s over 50 sets of tracks that this bridge spans that are active,” said Gillingham. “And so to take the bridge down is going to take some time.”

No full road closures are anticipated during the first phase of work. Traffic in the area of Logan Avenue and Arlington Street will be “intermittently affected,” the city said.

It has been difficult to get from the North End into central Winnipeg in the near-three years the bridge has been blocked off, said Darrell Warren, the president of the William Whyte Neighbourhood Association. He said the closure has also created regular traffic bottlenecks.

Span 15 of the Arlington Bridge is the first to be removed during the two-year demolition project Thursday morning. (Mike Deal / Free Press)

Span 15 of the Arlington Bridge is the first to be removed during the two-year demolition project Thursday morning. (Mike Deal / Free Press)

“It’s one of our main arteries, the Arlington Bridge, always was,” he said. “And now that it’s gone, McPhillips (Street) or Main Street and (the Slaw Rebchuk Bridge) is carrying the breadth of it all and causing a lot of traffic havoc there.”

He’s happy to see the project moving, but is worried that, without a timeline for when the new bridge may be funded and constructed, the wait could stretch many more years.

“Who knows, it could be two years or maybe 10 years, or maybe never, I don’t know,” he said.

City council approved $17 million to decommission and remove the bridge in January 2025, and $5 million to begin designing a new bridge.

Design work and funding to construct a new bridge will be considered by council in the future.

The bridge was built in 1912 and closed suddenly in November 2023 due to structural issues. (Mike Deal / Free Press)
The bridge was built in 1912 and closed suddenly in November 2023 due to structural issues. (Mike Deal / Free Press)

Public works chair Coun. Janice Lukes won’t be around for those considerations — she announced she would not seek a fourth term last month — but said the project, like any other that requires buy-in from the provincial and federal governments, comes with “high anxiety.”

“The real question is, where does it fit in the list of the city priorities of bridges? … There’s only so many hundreds of millions to go around, even from other levels of government, right?” she said.

“The good news is, we’ll have the design and everything all ready, because we’re refining the design.”

The city has suggested constructing the new bridge could take four to five years once it is funded.

malak.abas@freepress.mb.ca

The first stage of the demolition process involves removing the south part of the bridge from Logan Avenue into the CPKC rail yard. (Mike Deal / Free Press)
The first stage of the demolition process involves removing the south part of the bridge from Logan Avenue into the CPKC rail yard. (Mike Deal / Free Press)
The bridge will be pulled out piece by piece, lowered to the ground and demolished.  (Mike Deal / Free Press)
The bridge will be pulled out piece by piece, lowered to the ground and demolished. (Mike Deal / Free Press)
The demolition will proceed in 15-minute intervals to work around the trains, which will continue operating.  (Mike Deal / Free Press)
The demolition will proceed in 15-minute intervals to work around the trains, which will continue operating. (Mike Deal / Free Press)
The demolition of the bridge above the rail yard will be completed by the end of August.  (Mike Deal / Free Press)
The demolition of the bridge above the rail yard will be completed by the end of August. (Mike Deal / Free Press)
Design work and funding to construct a new bridge will be considered by council in the future.  (Mike Deal / Free Press)
Design work and funding to construct a new bridge will be considered by council in the future. (Mike Deal / Free Press)
The city has suggested constructing the new bridge could take four to five years once it is funded.  (Mike Deal / Free Press)
The city has suggested constructing the new bridge could take four to five years once it is funded. (Mike Deal / Free Press)
(Mike Deal / Free Press)
(Mike Deal / Free Press)
Malak Abas

Malak Abas
Reporter

Malak Abas is a city reporter at the Free Press. Born and raised in Winnipeg’s North End, she led the campus paper at the University of Manitoba before joining the Free Press in 2020. Read more about Malak.

Every piece of reporting Malak produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

History

Updated on Thursday, July 16, 2026 4:12 PM CDT: Adds quotes, details

Report Error Submit a Tip

More Stories

Saviour of the slopes

AV Kitching 5 minute read Preview

Saviour of the slopes

AV Kitching 5 minute read 2:00 AM CDT

It’s not yet winter but that hasn’t stopped Lori Natuik from preparing for when snow hits the ground.

Winter is her favourite season and she’s ready to strap on her skis, not only for pleasure but also as part of her duties as a Canadian Ski Patrol (CSP) volunteer.

Natuik, 69, is one of more than 4,500 CSP volunteers across the country.

CSP volunteers are often the first responders when skiiers get into difficulty on the slopes. The non-profit organization was established in 1941 to provide advanced first aid services for more than 200 alpine and Nordic ski areas nationally. In the off-season volunteers provide services at non-skiing events such as marathons, bike races, fundraising events, sporting tournaments and concerts.

Read
2:00 AM CDT

Positive anticipation is growing about major housing developments underway in Winnipeg’s downtown

Gabrielle Piché 10 minute read Preview

Positive anticipation is growing about major housing developments underway in Winnipeg’s downtown

Gabrielle Piché 10 minute read Friday, Sep. 25, 2026

If traffic is light and the wind is down, Somia Sadiq is able to hear the roar of Winnipeg Jets fans twice: first through her window, then on TV.

From her apartment view high above downtown, she can look out at Graham Avenue’s painted pedestrian landscape, see construction cranes and hear the heavy equipment at work as massive housing projects take shape at The Forks, at what used to be Portage Place shopping centre and at the former Hudson’s Bay building.

Sadiq has lived at 300 Main for 2 1/2 years, a few steps from the city’s famous, windy and reopened-to-pedestrians Portage Avenue intersection. At 42 storeys, it’s the tallest building in Winnipeg.

She is among 18,000 downtown residents who will soon be joined by thousands of others attracted to the city’s core by the new wave of major construction projects.

Read
Friday, Sep. 25, 2026

Today’s horoscope

Georgia Nicols 4 minute read Preview

Today’s horoscope

Georgia Nicols 4 minute read Yesterday at 2:00 AM CDT

MOON ALERT: There are no restrictions to shopping or important decisions. The moon is in Aries.

ARIES (March 21-April 19)

This is a wonderful, energetic day. The moon in your sign is dancing with lucky Jupiter promoting domestic peace and happiness. It’s a great day for business. But your top choice will be to socialize, enjoy fun activities with kids, check out sporting events or slip away on a vacation. .

TAURUS (April 20-May 20)

Read
Yesterday at 2:00 AM CDT

Discrediting independent media is the game plan

Editorial 4 minute read Preview

Discrediting independent media is the game plan

Editorial 4 minute read 2:00 AM CDT

United States President Donald Trump’s decision to bar several news organizations from White House briefings is, thanks to a court decision, teetering on the edge of collapse.

Will this defeat send the president into a rage? There is actually evidence that Trump knew this was going to be the outcome when he ordered the ban.

A federal court judge in Washington (and a Trump appointee, for the record) issued an injunction on Thursday arguing the swift decision to bar CNN, MS Now and Politico from the White House was likely unconstitutional. The judge ordered the White House to restore credentials to the three news organizations immediately.

Was this just the latest in a string of judicial defeats suffered by the Trump administration as it seeks to undermine, unravel and otherwise work around long-standing legal and administrative canons of the American government? No, not really.

Read
2:00 AM CDT

Is another goalie on Jets’ wish list?

Ken Wiebe 7 minute read Preview

Is another goalie on Jets’ wish list?

Ken Wiebe 7 minute read Yesterday at 6:59 PM CDT

Kevin Cheveldayoff and company are down to the short strokes.

With the opening-day roster due on Monday afternoon, the Winnipeg Jets took steps on the weekend to get down to the final number.

As it stood on Sunday, the Jets were down to 24 healthy players in training camp after centre Danny Zhilkin and defenceman Henry Thrun were placed on waivers.

With a maximum of 23 spots available, the only things left to determine are whether the Jets are interested in claiming a more experienced goalie to serve as the backup to Stuart Skinner and if centre Brayden Yager will break camp with the big club.

Read
Yesterday at 6:59 PM CDT

Province invests $3.8M in culinary arts training facility for francophone high school students

Kelly-Anne Riess 3 minute read Preview

Province invests $3.8M in culinary arts training facility for francophone high school students

Kelly-Anne Riess 3 minute read Yesterday at 12:10 PM CDT

A new dedicated culinary arts training facility will give francophone high school students a place to learn the trade in French.

The Manitoba government announced this week that it is providing $3.8 million toward the purchase of a property at 170 Marion St. and beginning design work for its renovation.

The facility will be the first dedicated vocational education site operated by Division scolaire franco-manitobaine, and the first fully French-language culinary arts program for Grade 11 and 12 students, preparing them for work in the restaurant and service sector.

“French-language education is a fundamental part of Manitoba’s identity and strength,” Education Minister Tracy Schmidt said in a news release. “It is an exciting step that will help strengthen both the francophone community and our skilled workforce.”

Read
Yesterday at 12:10 PM CDT