Public to get look at six options for Lake Manitoba outlet

Advertisement

Advertise with us

The public will get its first explanation of six options for a new outlet for Lake Manitoba at an open house in Ashern on Sept. 18.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 02/09/2014 (4366 days ago), so information in it may no longer be current.

The public will get its first explanation of six options for a new outlet for Lake Manitoba at an open house in Ashern on Sept. 18.

The three-hour open house starts at 5 p.m. at Centennial Hall.

The province said in a bulletin that it will present the preliminary results of its Lake Manitoba and Lake St. Martin Outlet Channels Conceptual Design Study and take public feedback.

Province of Manitoba Handout
The province is looking at six options to add more capacity to the already existing Fairford River Water Control Structure.
Province of Manitoba Handout The province is looking at six options to add more capacity to the already existing Fairford River Water Control Structure.

Infrastructure and Transportation Minister Steve Ashton has said the province is looking at six options to add more capacity to the already existing Fairford River Water Control Structure to allow more water to flow out of Lake Manitoba in high water years and into Lake St. Martin.

At the same time, the province would also build a permanent outlet from Lake St. Martin to Lake Winnipeg.

Ashton has said the Lake Manitoba outlet would not become operational until the Lake St. Martin channel was built.

The Selinger government has faced criticism following this summer’s flood that it has been too slow to build the Lake Manitoba outlet in the wake of flooding in 2011.

Report Error Submit a Tip

Local

LOAD LOCAL ARTICLES