‘Hope it holds up’: Highway 75 repairs bring renewed calls for increased safety

Work has started on a $61-million reconstruction of a dangerous section of Highway 75, prompting calls for additional repairs and better upkeep of the vital route between Winnipeg and the Canada-U.S. border.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 13/06/2023 (1170 days ago), so information in it may no longer be current.

Work has started on a $61-million reconstruction of a dangerous section of Highway 75, prompting calls for additional repairs and better upkeep of the vital route between Winnipeg and the Canada-U.S. border.

While citing concerns about potholes and chunks of concrete in southbound lanes, commuters and truckers told the Free Press the Manitoba government must ensure the entire highway is kept in good and safe condition.

“It seems like it’s one of the worst roads in Manitoba. There are a lot of bad roads but this one is extremely bad,” said Steinbach-area truck driver Eddie Friesen.

SUPPLIED
                                Manitoba truck driver Eddie Friesen suffered serious injuries when he was hit in the head by a chunk of concrete that was propelled through his windshield while driving south on Highway 75 near Emerson, MB.

SUPPLIED

Manitoba truck driver Eddie Friesen suffered serious injuries when he was hit in the head by a chunk of concrete that was propelled through his windshield while driving south on Highway 75 near Emerson, MB.

Friesen is recovering from serious injuries he suffered in February, when a 1.3-kilogram piece of the road smashed through his truck’s windshield and hit him on the left side of his head.

He said the concrete was kicked up by a tractor-trailer while both vehicles were headed south near Emerson.

“I never saw it coming until it hit me,” Friesen told the Free Press on Tuesday. “I’m doing OK, considering everything that I’ve gone through.”

He suffered a cracked skull, brain trauma, a crushed eye socket and cheekbone, and fractures to his nose and jaw.

The commercial driver will undergo additional surgeries. He is unsure if or when he will be able to return to work.

Before the incident, he used Highway 75 — a crucial trade and tourism corridor which runs through several communities — at least a couple times a week during his trips to and from the U.S.

A spokesperson for Manitoba Transportation and Infrastructure said work began May 15 to redo the concrete on a roughly 25-kilometre stretch of the southbound lanes between Ste. Agathe and Morris.

The work is being split into two projects, with both contracts awarded to Nelson River Construction.

“I never saw it coming until it hit me.”–Eddie Friesen

One phase is from Provincial Road 305 to PR 205, while the other is from PR 205 to just north of Morris.

A manager with Nelson River said the company cannot comment due to a confidentiality agreement in the contracts.

Manitoba Transportation and Infrastructure Minister Doyle Piwniuk previously said the work should be completed by Oct. 31.

Until the southbound lanes reopen, there will be two-way traffic on the northbound side of the highway.

“There’s going to be lots of wear and tear on those lanes,” said Julie French, who commutes three days a week between her home in Winnipeg and St. Jean Baptiste.

SUPPLIEDEddie Friesen suffered a cracked skull, brain trauma, a crushed eye socket and cheekbone, and fractures to his nose and jaw as a result of the piece of concrete that penetrated his truck's windshield.
SUPPLIED

Eddie Friesen suffered a cracked skull, brain trauma, a crushed eye socket and cheekbone, and fractures to his nose and jaw as a result of the piece of concrete that penetrated his truck's windshield.

While they welcomed the overhaul, French and Friesen said the highway should not be allowed to deteriorate.

“Just to fix it right, so we don’t have to go through this again,” said Friesen.

“I just hope it holds up,” French said of the current reconstruction, adding patchwork on scarred sections of the road doesn’t seem to last long.

The northbound lanes were in rough shape until similar repairs were carried out a few years ago, French noted.

She and Friesen also want the province to redo the southbound lanes between Morris and the border. That stretch, they said, poses similar hazards to all road users.

The MTI spokesperson said other sections of Highway 75 will be considered in future capital programs.

Meantime, heaving is a problem every spring and summer, said French.

A recent example occurred June 2, when a section heaved near Letellier.

Heat was believed to be the cause, said RCMP spokeswoman Cpl. Julie Courchaine, adding the lanes reopened about three hours later, after repairs.

RCMP officers helped to shut lanes, direct traffic and remove some of the “major” debris, said Courchaine.

Highway 75 is regularly compared to U.S. Interstate 29, which extends south from the Emerson-Pembina, N.D., border crossing.

During a stop Tuesday in Kansas, tractor-trailer driver Gerald Fotty said he prefers doing runs to and from the U.S., because its highways are in better shape.

SUPPLIEDThe chunk of concrete that was propelled through Eddie Friesen’s windshield.
SUPPLIED

The chunk of concrete that was propelled through Eddie Friesen’s windshield.

Fotty said he has raised his concerns about Highway 75 during conversations with MTI staff. He used the highway Monday during his drive south.

“The southbound stretch is just terrible from Ste. Agathe to the border,” said the Stonewall resident.

Chris Lorenc, president and chief executive officer of the Manitoba Heavy Construction Association, said Highway 75 is crucial because it moves about $19-billion worth of trade each year.

He said the differences between Highway 75 and Interstate 29 come down to the U.S. having a program that provides permanent and sustained funding for a national highway system.

The U.S. interstate system is primarily funded by a federal fuel tax.

“That has generated an interstate highway system that is properly invested in and properly maintained,” said Lorenc.

Manitoba Trucking Association executive director Aaron Dolyniuk said the current upgrades to Highway 75 were “long-needed,” and the organization is looking forward to the project’s completion.

Dolyniuk said the province is pursuing a trade corridor strategy, which he hopes will help to prioritize highways in need of further updates or maintenance.

chris.kitching@freepress.mb.ca

Twitter: @chriskitching

Chris Kitching

Chris Kitching
Reporter

Chris Kitching is a general assignment reporter at the Free Press. He began his newspaper career in 2001, with stops in Winnipeg, Toronto and London, England, along the way. After returning to Winnipeg, he joined the Free Press in 2021, and now covers a little bit of everything for the newspaper. Read more about Chris.

Every piece of reporting Chris produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

Report Error Submit a Tip

More Stories

‘I’m proud of our country right now’: Kinew on Canada’s counter-tariffs

Gabrielle Piche 2 minute read Preview

‘I’m proud of our country right now’: Kinew on Canada’s counter-tariffs

Gabrielle Piche 2 minute read Yesterday at 3:45 PM CDT

Canada is showing the rest of the world you “don’t have to take a knee” to the United States, Premier Wab Kinew said Tuesday.

Read
Yesterday at 3:45 PM CDT

Puzzles Palace

1 minute read Monday, Jul. 27, 2026

To solve our puzzles, please subscribe with this special offer: |

Thirteen accused in gun, drug trafficking network in rural Manitoba

Erik Pindera 5 minute read Preview

Thirteen accused in gun, drug trafficking network in rural Manitoba

Erik Pindera 5 minute read Updated: Yesterday at 3:59 PM CDT

RCMP and Winkler police have arrested more than a dozen people allegedly connected to a drug-and-gun trafficking network that operated in rural Manitoba.

The joint investigation began in December 2024, when officers from the Winkler Police Service asked the Mounties for help after learning kilograms of cocaine were being imported to a Winkler-area truck repair business, said RCMP Supt. Jeff Asmundson, who oversees the force’s Manitoba integrated law enforcement team.

Mounties and Winkler police gathered evidence for 19 months and expanded the probe, dubbed Project Dolor, as investigators learned other types of illicit substances and firearms were being trafficked by the network in a number of southern Manitoba communities, said Asmundson, whose team investigates serious and organized crime.

“It started as a cocaine trafficking investigation, and obviously, as we move along in a project or a file, evidence is gathered and an opportunity arose and we wanted to ensure public safety,” he told reporters Tuesday. “We were able to secure some firearms.”

Read
Updated: Yesterday at 3:59 PM CDT

Aren’t there other power options?

Jules Legal 4 minute read 2:00 AM CDT

It seems like only yesterday that Manitoba Hydro was basking in the glory of what to do with all the surplus energy being generated by the newly constructed hydro generating stations along the Nelson River. And so it built a multibillion-dollar, high-voltage hydro line to export this surplus energy to the U.S. Bipole III, they called it.

Now, managers at Manitoba Hydro are telling us Manitobans could be facing a power shortage as early as 2029 and that a natural gas turbine generating station is urgently required.

Part of this looming shortfall can be attributed to our growing population and we must not ignore the fact our consumptive lifestyle keeps demanding ever more megawatts.

So what happened to cause such a dramatic turnaround?

‘Hope it holds up’: Highway 75 repairs bring renewed calls for increased safety

Chris Kitching 5 minute read Preview

‘Hope it holds up’: Highway 75 repairs bring renewed calls for increased safety

Chris Kitching 5 minute read Tuesday, Jun. 13, 2023

Work has started on a $61-million reconstruction of a dangerous section of Highway 75, prompting calls for additional repairs and better upkeep of the vital route between Winnipeg and the Canada-U.S. border.

While citing concerns about potholes and chunks of concrete in southbound lanes, commuters and truckers told the Free Press the Manitoba government must ensure the entire highway is kept in good and safe condition.

“It seems like it’s one of the worst roads in Manitoba. There are a lot of bad roads but this one is extremely bad,” said Steinbach-area truck driver Eddie Friesen.

Friesen is recovering from serious injuries he suffered in February, when a 1.3-kilogram piece of the road smashed through his truck’s windshield and hit him on the left side of his head.

Read
Tuesday, Jun. 13, 2023

Tough to stomach date’s lack of compassion

Maureen Scurfield 5 minute read Yesterday at 2:00 AM CDT

DEAR MISS LONELYHEARTS: I had dinner with my new guy at a fancy restaurant — his treat — and ate something that didn’t agree with me. I ended up in the restaurant bathroom, throwing the expensive dinner up. My date was actually vulgar about it — not sympathetic or taking things with a sense of humour at all.

He was so disgusted he called a taxi to take me home so I wouldn’t end up throwing up in his precious car. I cancelled the taxi and called my family, and my father and brother came right away. They wanted to wring his neck!

I’d never have reacted so cruelly if my date had gotten sick at a restaurant.

This guy has since called to see if I’m “back to normal.” He casually asked if I wanted to give it another try. I just didn’t have the desire to talk with him anymore, so I hung up. Is this my problem? Am I “over-reacting” as he has told other people I know?