City report delivers new, less-expensive, proposal to replace Arlington Bridge

A new proposal to replace the Arlington Bridge at its current location could cost $166 million, plus up to $27 million more in interest, and require six years to build.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 25/11/2024 (622 days ago), so information in it may no longer be current.

A new proposal to replace the Arlington Bridge at its current location could cost $166 million, plus up to $27 million more in interest, and require six years to build.

A long-awaited report on the bridge’s future comes about a year after it closed suddenly on Nov. 21, 2023, due to structural concerns.

The decaying bridge first opened to traffic in 1912.

While the city explored repairing it, that is no longer a viable option, Brad Neirinck, the city’s manager of engineering, writes in the report.

“It is not feasible to repair the existing truss spans of the bridge due to severe deterioration and lack of strength to support construction loading and operations… load testing showed the foundations could not support a new bridge superstructure,” Neirinck notes.

The price to replace the bridge has plummeted from a 2019 proposal, a version expected to cost $319 million. That earlier plan would have created a much wider, three-lane structure with two protected one-way bike lanes and two sidewalks. The new plan offers a narrower, two-lane bridge with two shared, multi-use active-transportation paths.

The newer proposal would also require fewer property acquisitions.

“It became a much shorter project, a narrower bridge and a much more modest project…. We would restore the traffic back to what it was pre-2023,” Neirinck told reporters Monday.

The new bridge would be able to support Winnipeg Transit buses, unlike the now-closed structure, while also improving access for cyclists and pedestrians.

It would be designed to offer a minimum 75-year service life.

MIKE SUDOMA / FREE PRESS FILES
                                The bridge first opened to traffic in 1912 and closed suddenly a year ago due to structural concerns.

MIKE SUDOMA / FREE PRESS FILES

The bridge first opened to traffic in 1912 and closed suddenly a year ago due to structural concerns.

Coun. Janice Lukes, chairwoman of council’s public works committee, said the construction is needed to restore a critical transportation route.

“I think it’s really obvious that the need is there if you look at the volume of traffic and you see the uptake in other parts of the city (after the bridge closed),” said Lukes (Waverley West).

In the report, Neirinck notes all modes of traffic have faced significant delays since the Arlington Bridge closure, with some pedestrians forced to add more than a kilometre to their routes. Morning peak traffic flows now last an hour longer at the McPhillips Street underpass, with afternoon peak traffic extended two hours.

McPhillips Street and Logan Avenue now operates at 25 per cent above its capacity during afternoon rush hour, while traffic on the Slaw Rebchuk Bridge has increased by about 5,000 vehicles per day.

“It’s a critical link, so I’m very supportive of proceeding with (the bridge). We just have to see how we can fit it into the budget,” said Lukes.

Even with a smaller price tag for a downsized bridge, the cash-strapped city could struggle to cover the cost. The city has only $149 million left to borrow within its council-imposed debt strategy, the report notes.

Mayor Scott Gillingham said that fiscal reality shows why the city needs a new funding formula from the province, with some form of growth revenue.

“If we funded the Arlington Bridge by ourselves as the city, we completely eat up the rest of our debt capacity… (and) this project also competes with an array of other important infrastructure projects,” said Gillingham.

The report recommends city council approve the replacement design and refer it to next year’s budget process.

“We need to demolish the bridge in place by using explosives and dropping it span by span onto the railway tracks.”–Brad Neirinck

Coun. Ross Eadie (Mynarski) plans to lobby senior governments to support the new bridge.

“It’s very critical. It’s already going to be six years to (get this work) done… so we have to start now,” said Eadie.

The project’s price includes $16.9 million to demolish the existing bridge, which city engineers say must be done within the next five years to mitigate risks to the rail lines below it.

Neirinck said large parts of the bridge are also unsafe to move.

“We need to demolish the bridge in place by using explosives and dropping it span by span onto the railway tracks,” he said.

 

About $27 million in interest costs would be expected if the project is funded solely through debt.

The new structure would result in Dufferin Avenue closing at Arlington Street, with the bridge ending about halfway between Dufferin and Stella avenues. If the Dufferin Avenue-and-Arlington Street intersection remained open, the city would need to acquire more properties and spend about $8 million more on the project, the report notes.

The bridge design would require modifications for Canadian Pacific Kansas City rail operations beneath the bridge, which the company would need to approve. That includes abandoning one track and the realignment/relocation of a few others.

The report says consultations over those changes are still underway and have been “generally positive.”

— With files from Malak Abas

joyanne.pursaga@freepress.mb.ca

X: @joyanne_pursaga

Joyanne Pursaga

Joyanne Pursaga
Reporter

Joyanne is city hall reporter for the Winnipeg Free Press. A reporter since 2004, she began covering politics exclusively in 2012, writing on city hall and the Manitoba Legislature for the Winnipeg Sun before joining the Free Press in early 2020. Read more about Joyanne.

Every piece of reporting Joyanne produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

History

Updated on Monday, November 25, 2024 5:45 PM CST: Updated with details, quotes.

Report Error Submit a Tip

More Stories

Trucking operation linked to fatality in Brandon shut down by Alberta government

Malak Abas 5 minute read Preview

Trucking operation linked to fatality in Brandon shut down by Alberta government

Malak Abas 5 minute read Friday, Aug. 7, 2026

The Alberta government has shut down Conquer Transport Inc., the trucking company linked to a crash near Brandon in which a 49-year-old woman, who had the right of way, was killed.

Devin Dreeshen, Alberta’s transport minister, said the province launched an investigation into Conquer Transport after one of its semi-trucks ran a stop sign on May 27, 2026 at Highway 110 at Richmond Avenue East.

The semi hit an SUV driven by Xiaoyun Zhang, a Chinese immigrant who worked at the nearby pork processing plant. She died at the scene and the truck driver, 35-year-old Brijpal Panwar, has been charged with dangerous driving causing death.

“Our investigative team went out and … saw numerous non-compliance issues, whether it was hours of service with their drivers not being recorded properly, vehicle maintenance and inspections being insufficient, their safety program also being insufficient.”

Read
Friday, Aug. 7, 2026

Gilbert Plains Country Club closes for remainder of season due to flood damage

Ken Wiebe 7 minute read Preview

Gilbert Plains Country Club closes for remainder of season due to flood damage

Ken Wiebe 7 minute read Thursday, Aug. 6, 2026

Scott McCallum has made the trek to the Gilbert Plains Country Club clubhouse countless times.

But this was the first time the golf professional and general manager of the course required hip waders to get to his office.

Walking hand in hand with his wife Lindsay, McCallum didn’t need much time to see the devastation caused by the flash flooding in the Parkland region in late June.

“We’re on a river and it’s a beautiful golf course, but anytime you’re on a body of water you know that you’re taking a chance of events like this happening,” McCallum said in a telephone interview. “To this magnitude, we’ve never seen anything like it before. So, this is new to us.

Read
Thursday, Aug. 6, 2026

Livestreamed mental-health meltdown underscores medium’s disturbing decline

Melissa Martin 7 minute read Preview

Livestreamed mental-health meltdown underscores medium’s disturbing decline

Melissa Martin 7 minute read Friday, Aug. 7, 2026

On Tuesday evening, a well-known celebrity blogger, best known by the nom de plume Perez Hilton, opened up his TikTok account and began a livestream from his Miami home. What unfolded over the next 30 minutes horrified all who witnessed it — and should force the rest of us to take a very sober look at the ways social media can harm.

Read
Friday, Aug. 7, 2026

City report delivers new, less-expensive, proposal to replace Arlington Bridge

Joyanne Pursaga 5 minute read Preview

City report delivers new, less-expensive, proposal to replace Arlington Bridge

Joyanne Pursaga 5 minute read Monday, Nov. 25, 2024

A new proposal to replace the Arlington Bridge at its current location could cost $166 million, plus up to $27 million more in interest, and require six years to build.

Read
Monday, Nov. 25, 2024

Lac du Bonnet slowly healing from devastating fire

Nicole Buffie 6 minute read Preview

Lac du Bonnet slowly healing from devastating fire

Nicole Buffie 6 minute read Friday, Aug. 7, 2026

LAC DU BONNET — Fifteen months after devastating wildfires ripped through Lac du Bonnet, claiming two lives and destroying more than a dozen homes, residents are trying their best to build back better.

Along the winding gravel path that is Wendigo Road outside Lac du Bonnet, new timber peeks through patches of charred forest. Homes and cottages are beginning to take shape after fire raced through the neighbourhood at record speed and levelled at least 18 homes on the road.

Table saws and nail guns ring in the distance while Brian Curtis plots out where his new cottage will go. Curtis bought his previous cottage 19 years ago and had recently levelled the foundation.

He and his wife, Pam, had been thinking about long-term renovations when the May 13, 2025 fire swept away all their work and memories.

Read
Friday, Aug. 7, 2026

A measure of hope a decade after senseless death, injustice

Niigaan Sinclair 5 minute read Preview

A measure of hope a decade after senseless death, injustice

Niigaan Sinclair 5 minute read Friday, Aug. 7, 2026

I’m a few hundred kilometres from the farm near Biggar, Sask. — the place where 22-year old Colten Boushie from Cree Red Pheasant First Nation was shot and killed by farmer Gerald Stanley precisely 10 years ago.

“You need to remind people about the 10-year anniversary,” a nearby, rural school principal tells me at the education conference I just finished speaking at.

“That death is a wound that continues to bleed in all of us,” a principal from Regina adds. “I hear about it from our students all the time.”

On Aug. 9, 2016, Boushie’s death entered the Canadian consciousness, representing what then-Saskatoon mayor Charlie Clark declared “a defining moment for this community and this country.”

Read
Friday, Aug. 7, 2026