‘Herded like cattle’: Toronto’s Rogers Stadium faces crowd control test after Coldplay show

Advertisement

Advertise with us

TORONTO - Coldplay fans appeared to experience a smoother exit from Toronto's Rogers Stadium on Monday night, after complaints of poor crowd control following the outdoor venue's inaugural show last week.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 07/07/2025 (430 days ago), so information in it may no longer be current.

TORONTO – Coldplay fans appeared to experience a smoother exit from Toronto’s Rogers Stadium on Monday night, after complaints of poor crowd control following the outdoor venue’s inaugural show last week.

But some concertgoers were still left feeling lucky to get out without any major incident.

Leigh Marshall and Adam Archdekin said they felt “herded like cattle” as they were held in the venue for 40 minutes after the show ended.

A worker walks past the stage at the brand new 50000 capacity concert venue, Rogers Stadium, in Toronto, Thursday, June 26, 2025. THE CANADIAN PRESS/Nathan Denette
A worker walks past the stage at the brand new 50000 capacity concert venue, Rogers Stadium, in Toronto, Thursday, June 26, 2025. THE CANADIAN PRESS/Nathan Denette

“They have red lights. It’s stop and go,” Marshall said.

As crowds leaving the stadium thickened, staff held up the red lights and instructed people to wait inside the venue before they could proceed to transit areas. A green light meant go.

The practice, which operator Live Nation Canada refers to as “pulsing,” was also in use at the venue’s first show. This time, the operator promised to reconfigure the exit routes so that crowds would be dispersed to multiple nearby subway stations.

While some fans complained about the temporary standstills, the crowd control technique appeared to help prevent overcrowding at Downsview Park, the nearest subway and GO train station, with a limited number of people flowing through at a time.

By 12:30 a.m., transit staff announced the last GO Train of the night had departed. Staff began taking down signs directing fans to the station as the crowd leaving the venue reduced to a trickle.

It appeared to be a significant improvement over the venue’s inaugural show last week, when some attendees said it took up to two hours to exit the 50,000-person capacity stadium.

Still, with only two ways out, Marshall and Archdekin said they worry about future concertgoers having a difficult time.

“It has the makings of a disaster,” said Marshall.

After complaints that the site and transit services seemed ill-equipped to handle large crowds, Live Nation Canada said it was “making adjustments” ahead of Coldplay’s four shows this week.

In addition to changing the exit routes, the operator promised to add more signage, lighting, staff and water stations.

The Toronto Transit Commission said it would add more staff to its Downsview Park and Wilson stations on concert nights, while Metrolinx only said it would “closely monitor” GO train ridership levels for events at the stadium.

Concert-goers make their way towards the gates at Rogers Stadium in Toronto, Monday, July 7, 2025. THE CANADIAN PRESS/Sammy Kogan
Concert-goers make their way towards the gates at Rogers Stadium in Toronto, Monday, July 7, 2025. THE CANADIAN PRESS/Sammy Kogan

Some fans who attended the concert on Monday tried to get ahead of what they expected would be a hellish situation.

Laurie Gatto and Jody McComb said they left partway through the final song. It only took them about 10 minutes to leave.

“I don’t think I’ve ever left a concert early, but I think we’ve heard so many negative things about this venue that we thought better to leave five minutes before the end,” Gatto said while rushing back to her car, which was in a nearby lot.

Gatto and McComb said there were enough bathrooms and signage was clear leaving the venue. Inside, additional water stations had been set up as promised.

During the show, Coldplay’s frontman Chris Martin thanked the crowd for going through all “the traffic and the travel and the trains and the waiting” to get to “this weird stadium in the middle of nowhere.”

Earlier on Monday evening, thousands of people arrived early to find staff directing them from the subway to join long lineups for entry.

Barb Lucas, who arrived from Oshawa, Ont., said ahead of the event that she was “terrified” after hearing about the long lines for bathrooms, limited water and swaying grandstands at the stadium’s first concert.

She added that the venue had a confusing name.

“I thought this was at Rogers Centre,” she said, referring to the similarly named stadium in downtown Toronto.

“Had I known it was here, we wouldn’t have been going.”

Brian Ellis, who drove four hours from Detroit, said he booked his accommodations right beside the Rogers Centre, thinking the concert was at the downtown venue.

Concertgoers exit Rogers Stadium in Toronto, Monday, July 7, 2025. THE CANADIAN PRESS/Sammy Kogan
Concertgoers exit Rogers Stadium in Toronto, Monday, July 7, 2025. THE CANADIAN PRESS/Sammy Kogan

Instead of being steps away, Ellis drove about 25 kilometres to the Sheppard West transit station parking lot and then walked for half an hour to get to the Rogers Stadium gates.

“It’s interesting how far you have to walk to get in this place,” he said.

Pedicab drivers blaring Coldplay hits from speakers sped between the gates and nearby parking lots transporting fans who didn’t want to brave the long walk to the venue entrance.

One driver said it would cost $20 per person to ride in one of the yellow cabs to the venue gates from a parking lot less than a kilometre away.

Emilio DeAngelis, who travelled from Quebec City, said he was embracing the experience.

“It’s Coldplay,” he said. “It’s normal that there’s a lot of people.”

— With files from Tara Deschamps.

This report by The Canadian Press was first published July 7, 2025.

Report Error Submit a Tip

More Stories

Carney warns of tough times ahead in national address as retaliatory tariffs begin

Nick Murray, The Canadian Press 5 minute read Preview

Carney warns of tough times ahead in national address as retaliatory tariffs begin

Nick Murray, The Canadian Press 5 minute read Updated: Yesterday at 4:10 PM CDT

OTTAWA - Canada's pivot away from the United States will "come at a cost" but the alternative would be far worse, Prime Minister Mark Carney said Tuesday.

Carney made the remarks in a video released just hours after his government made good on a promise to implement retaliatory tariffs on the United States. Those tariffs respond to American duties imposed last month by U.S. President Donald Trump, after the two countries could not come to an agreement to settle some outstanding trade irritants.

Carney spent much of the video laying out Canada's response to Trump's protectionist trade policies, including expanding trade with other countries and building more capacity domestically.

But he said it "won't be easy."

Read
Updated: Yesterday at 4:10 PM CDT

Governments chip in for housing at Portage Place, Market Lands, other city locations

Joyanne Pursaga 4 minute read Preview

Governments chip in for housing at Portage Place, Market Lands, other city locations

Joyanne Pursaga 4 minute read Updated: Yesterday at 8:24 PM CDT

A new government partnership will aim to speed up home construction, largely in downtown Winnipeg, with a goal to produce at least 740 affordable housing units.

The Build Canada Homes partnership, funded by the governments of Canada, Manitoba and Winnipeg, will support at least 821 housing units. The vast majority (811) will be in Winnipeg, while the rest will be added in Swan River.

Federal Housing Minister Gregor Robertson said the partnership will tackle substantial housing needs in Manitoba, at a time home prices are out of reach for many Canadians.

“Far too many people (are) sleeping outside, sleeping rough, unsheltered. Far too many people … can’t find a home they can afford,” said Robertson.

Read
Updated: Yesterday at 8:24 PM CDT

Weekender festivities to take over downtown

Sheldon Birnie 3 minute read Preview

Weekender festivities to take over downtown

Sheldon Birnie 3 minute read 6:00 AM CDT

Come one, come all, to Graham Avenue this weekend.

Organizers of the Weekender hope to welcome thousands of Winnipeggers to the streets and parking lots in and around the Graham Avenue pedestrian mall in what they are billing as “Downtown’s Biggest Street Party.”

Starting Friday evening and running through Sunday, the free festival boasts a plethora of ways by which visitors can enjoy themselves. From food trucks to markets, games to live music, classic cars and free bike repairs, the festival aims to provide a little something for everyone.

“The Weekender is truly about bringing people together, to have fun, to experience all that downtown has to offer,” says Olivia Billson, director of communications and public relations for Downtown Winnipeg BIZ, which is putting on the festival in conjunction with Smith Events and Arch Events.

Read
6:00 AM CDT

Hydro working to restore service to pockets of River Heights

Malak Abas 6 minute read Preview

Hydro working to restore service to pockets of River Heights

Malak Abas 6 minute read Updated: Yesterday at 8:33 PM CDT

When Sheila Fenby’s basement began filling with water Sunday night, it felt like déjà vu.

Read
Updated: Yesterday at 8:33 PM CDT

Tenant charged with arson at housing complex

Morgan Modjeski 3 minute read Preview

Tenant charged with arson at housing complex

Morgan Modjeski 3 minute read Updated: 8:45 PM CDT

A 41-year-old tenant has been charged with deliberately setting fire to a suite in a subsidized housing complex in North Kildonan this summer.

The Winnipeg Police Service said Wednesday the man had been arrested Tuesday in connection with the July 15 blaze that caused $200,000 damage to an apartment block at 355 Sutton Ave.

No injuries were reported from the fire that forced the building to be evacuated.

The major crimes unit took over the investigation and identified a suspect.

Read
Updated: 8:45 PM CDT

Winkler-based internet provider delivering high-speed service to 30 rural and First Nations Manitoba communities

Nicole Buffie 3 minute read Preview

Winkler-based internet provider delivering high-speed service to 30 rural and First Nations Manitoba communities

Nicole Buffie 3 minute read Yesterday at 7:12 PM CDT

Valley Fiber says it is undertaking one of its largest fibre optic projects and is building infrastructure that will deliver internet to 10,000 homes and businesses in rural and First Nations communities across Manitoba.

“These communities will now have access to the fastest internet network in Manitoba, and it will power their lives and their business,” Ryan Klassen, chief executive officer of the Winkler-based internet provider, said Tuesday from Fisher River Cree Nation.

The province has granted Valley Fiber use of two of its underused cables on the existing Manitoba Hydro fibre optic network for up to 20 years as part of the project, which will connect nearly 30 communities — including Buffalo Point, Hollow Water, Black River and Peguis First Nations, along with Fisher River and Fox Lake Cree Nations — to high-speed internet.

Construction should be finished by 2027.

Read
Yesterday at 7:12 PM CDT