Hungary’s government plans interventions on Danube River to keep nuclear plant running

Advertisement

Advertise with us

BUDAPEST, Hungary (AP) — Authorities in Hungary will begin taking steps to raise the level of the Danube River this week in order to ensure the country's only nuclear power plant can continue operating, Prime Minister Péter Magyar said on Wednesday.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

BUDAPEST, Hungary (AP) — Authorities in Hungary will begin taking steps to raise the level of the Danube River this week in order to ensure the country’s only nuclear power plant can continue operating, Prime Minister Péter Magyar said on Wednesday.

Persistent drought and successive extreme heat waves in recent months have deprived one of Europe’s largest rivers of water, bringing Danube levels to record lows and pushing the Paks nuclear power plant to the brink of shutting down for the first time in its 44-year history.

The Soviet-built plant, which uses water from the Danube to cool its four reactors, is currently operating at little more than 10% of its 2,000 megawatt capacity due to low water levels. It supplies Hungary with around a third of its electricity.

The MVM Paks Nuclear Power Plant, which had to close its Reactor 3 due to extremely low water levels on the Danube River, is seen in Paks, Hungary, Wednesday July 29, 2026. (Daniel Kiss)
The MVM Paks Nuclear Power Plant, which had to close its Reactor 3 due to extremely low water levels on the Danube River, is seen in Paks, Hungary, Wednesday July 29, 2026. (Daniel Kiss)

In a video posted to Facebook on Wednesday, Magyar said authorities would begin building a bed sill — a low concrete or stone structure built into the riverbed to slow the current and raise upstream water levels — on Thursday on a section of the Danube just upriver from the plant.

Delivery of some 145,000 cubic meters of rocks used in its construction would begin on Wednesday evening, Magyar said, adding that the intervention could raise the level of the Danube by up to a meter (3 feet).

Meanwhile, two 80-meter (262-foot) barges will be transported to the site near Paks and may be sunk in order to raise the Danube up to a further 20 centimeters (8 inches) at the plant’s cooling pumps. A decision on whether to sink them will be made on Friday, Magyar said.

“We can no longer consider this extraordinary situation as a one-time natural extreme,” he said, adding that the work must be carried out quickly to avoid a full Paks shutdown.

Magyar referred to the construction of the bed sill as a “long-term” solution which could ensure that water levels never fall below the threshold at which reactors at Paks must be powered down.

He said that after a recent temporary rise in water levels, they were expected to begin falling again in coming days which, without external intervention, could lead to the complete shutdown of the Paks plant.

“The Danube has given us days, not months,” he said.

Similar measures were taken in Romania last week when authorities sank four barges laden with rock into the Danube in an attempt to redirect water downstream toward the Cernavoda nuclear plant, which had already shut down one of its two reactors due to low water levels.

On Wednesday, Magyar said the Paks plant operating at its current output is costing Hungary’s economy up to 50 billion forints ($158 million) per month. By contrast, he said the planned interventions on the Danube will cost around 6 billion forints ($19 million).

Report Error Submit a Tip

More Stories

Manitoba’s next power plant already under construction

Colleen Kuruluk 4 minute read Yesterday at 2:00 AM CDT

Across Manitoba, we’re rapidly moving toward a more electrified future, as homes, businesses, industries, and transportation increasingly turn to electricity. This transition offers a significant opportunity to reduce greenhouse gas emissions, but it also requires us to rethink how we plan for and participate in our energy future.

‘Quite a journey’: dozens move into transitional housing downtown

Carol Sanders 4 minute read Preview

‘Quite a journey’: dozens move into transitional housing downtown

Carol Sanders 4 minute read Yesterday at 5:54 PM CDT

Dozens of residents have moved into transitional housing units in a former university building in downtown Winnipeg.

Housing, Addictions and Homelessness Minister Bernadette Smith said 42 residents have moved into suites on the third and fourth floors of a seven-storey building previously owned by Providence University College and Theological Seminary. There will be space for as many as 118 people who were in encampments or otherwise homeless.

The remaining units under renovation are expected to be ready and occupied in the coming weeks, Smith said.

“This has been two years in the making,” the minister said at a media event with residents, staff, neighbours and supporters. The building cost the province $24.4 million to purchase and renovate.

Read
Yesterday at 5:54 PM CDT

$8.7-million detox centre called ‘high-priced drunk tank’

Carol Sanders 4 minute read Preview

$8.7-million detox centre called ‘high-priced drunk tank’

Carol Sanders 4 minute read Updated: Yesterday at 6:08 PM CDT

The new facility to detain people in a drug psychosis for up to 72 hours is operating the way it should, the government said Friday, even though just 26 people have been held for that purpose since it opened.

“The (protective care centre) is doing what it’s meant to do: support people, meet them where they’re at, provide a caring environment,” Addictions Minister Bernadette Smith said after updated data were posted online.

The vast majority of those detained at the 20-room facility at 190 Disraeli Fwy. were recovering from alcohol intoxication, the update shows.

In total, 4,425 people were detained from the time the site opened on Dec. 2, 2025, until June 30, for an average of less than five hours.

Read
Updated: Yesterday at 6:08 PM CDT

St. Malo’s summer hot spot relies on dedicated community to make sure park-goers can kick back and relax

Melissa Martin 16 minute read Preview

St. Malo’s summer hot spot relies on dedicated community to make sure park-goers can kick back and relax

Melissa Martin 16 minute read Yesterday at 6:00 AM CDT

It’s shaping up to be a hot late-August Friday in southern Manitoba; the forecast warns of a thunderstorm in the late afternoon, but that won’t stop Manitobans from flocking to savour one of the last great beach days of the summer.

Read
Yesterday at 6:00 AM CDT

Woman died while getting wisdom teeth out; case raises questions about transparency of dental association

Nicole Buffie 5 minute read Preview

Woman died while getting wisdom teeth out; case raises questions about transparency of dental association

Nicole Buffie 5 minute read Yesterday at 7:19 PM CDT

The parents of a 23-year-old southwestern Manitoba woman who died after receiving a local anesthetic during a wisdom tooth extraction say they are in the dark about the investigation into their daughter’s death.

Dulaney and Victoria Blatz say the Manitoba Dental Association has been unwilling to give them information about the probe into their daughter’s death, saying the self-governing regulatory body must be more transparent with the public.

“We have pushed through various channels trying to get information, but it’s nothing but stalling and sidelining,” Victoria said Friday. “This has crashed our world to pieces and we just want answers.”

Virginia Blatz went to Boundary Trails Dental Centre in Morden on Nov. 27, 2024, to have her wisdom teeth removed, but never returned home.

Read
Yesterday at 7:19 PM CDT

MPI restricts loan program to winter tires only

Nicole Buffie 5 minute read Preview

MPI restricts loan program to winter tires only

Nicole Buffie 5 minute read Thursday, Sep. 3, 2026

Manitoba Public Insurance is getting strict about its winter tire program after years in which customers used it to buy other types of tires.

As of Oct. 1, only tires that are “designed and marketed solely for winter driving conditions, including snow and ice,” will be eligible for financing through the public insurer.

Currently, all-weather, all-season, four-season and year-round tires are included in the program, which allows MPI clients to pay the cost in monthly installments. The program, established in 2014, offers financing for up to $2,000, plus interest.

In an email to retailers, MPI says the program is being changed so it “helps ensure customers receive the full winter-driving safety benefits associated with dedicated winter tires.”

Read
Thursday, Sep. 3, 2026