U of M shows off Formula SAE

Engineering students used 3D printer to form race-car parts

Advertisement

Advertise with us

On Oct. 18, visitors to Murray Chevrolet at the Waverley Auto Mall had the opportunity to view the University of Manitoba faculty of engineering’s current Formula-type race car.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 27/10/2017 (3215 days ago), so information in it may no longer be current.

On Oct. 18, visitors to Murray Chevrolet at the Waverley Auto Mall had the opportunity to view the University of Manitoba faculty of engineering’s current Formula-type race car.

“I know one of the students who worked on the vehicle,” says Murray Chevrolet president Dan Murray. “We helped out with the funding. The students essentially did all the work themselves. This was an opportunity for the students to show off their work.”

Every year, a team of University of Manitoba engineering students compete with students from other universities throughout North America and Europe in building and racing a formula-type car.

Last year, the U of M entry finished 41st in a field of 120 models in the running, reports fifth-year engineering student Kevin Mazur.

“We are competing against some teams, especially European teams, that have really large budgets,” he said. “This was the first time in the five years that I have been on the team that our car hasn’t broken down.”

Myron Love / Winnipeg Free Press
Scott Borlase (back) and Kevin Mazur are among 30 University of Manitoba engineering students who’ve built a Formula-type race car, with contributions from Murray Chevrolet and Boeing.
Myron Love / Winnipeg Free Press Scott Borlase (back) and Kevin Mazur are among 30 University of Manitoba engineering students who’ve built a Formula-type race car, with contributions from Murray Chevrolet and Boeing.

Mazur notes 30 U of M students worked on this year’s Formula SAE vehicle.

The rule is that the students have to build a new car every year.

“Most other teams use a steel frame,” he said. “Boeing gave us carbon-fibre material, which makes for reduced weight and increased rigidity.”

The U of M team used a 3D printer to produce pieces for the body and the students built the dashboard and controls with off-the-shelf parts.

“Our car is designed to be adjustable,” Mazur said. “Our drivers range in height from 5-foot-4 to 6-foot-4.”

Each team has to have four designated drivers, and Mazur is one of them.

The students test drove the vehicle at the Michigan National Speedway, which is about a 30-minute drive west of Detroit. Mazur says the engineering students are currently fine-tuning their 2017 model — while at the same time finishing their design for the 2018 vehicle.

Pinnacle Collision Centre opens

 

Mercedes-Benz Winnipeg’s new, 18,000-square-foot body shop is open for business.

“We began fixing dents on Monday,” said Jerry Castellano, the new Pinnacle Collision Centre’s collision operations manager. “This is the only Mercedes-Benz certified collision repair centre in Manitoba. But we can repair all makes and models.”

The new structure — which is next door to the main Winnipeg Mercedes-Benz dealership at 23 Rothwell Rd., just a couple of blocks south of IKEA — had been under construction since late last fall. The decision to build the new auto-body facility, said Mercedes-Benz Winnipeg’s president, Brian Lowes, grew out of the dealership’s rapidly increasing sales.

“Our sales have more than doubled over the past five years,” he said. “We felt there was a need to be able to provide this additional level of customer service.”

The Pinnacle Collision Centre has 15 work bays (plus a special bay for Sprinters, the Mercedes-Benz line of delivery vans, a paint booth, two paint preparation stations and two wash bays. The building will also house a fully equipped parts department, while the second-floor offices will be occupied by Mercedes-Benz Winnipeg’s business development people.

Among the new building’s highlights are a completely enclosed, two-car drive-thru for estimates and vehicle delivery.

“We designed Pinnacle with winter conditions in mind,” Castellano says.

The Pinnacle Collision Centre is beginning with a staff of 12.

“Our technicians are being trained in Germany,” Castellano says.

“We are able to send one technician to the Mercedes-Benz training facility every four months.”

He adds that Pinnacle’s production co-ordinator, Denis Kushchev, worked for Mercedes-Benz in Russia for several years before coming to Winnipeg.

“We have had really positive feedback,” says Ryan Borton, Mercedes-Benz Winnipeg’s operations manager, of the customer response to the new body shop. “We have already booked several appointments.

“We appreciate that our customers have invested time and money in our products. So we want to provide service that goes above and beyond. At the end of the day, we aim to provide our customers with the best service possible.”

myjolove1@gmail.com

 

History

Updated on Friday, October 27, 2017 7:29 AM CDT: Photos fixed.

Report Error Submit a Tip

More Stories

Proposed Transcona development — which could add 20,000 people — gets thumbs down from residents

Joyanne Pursaga 5 minute read Preview

Proposed Transcona development — which could add 20,000 people — gets thumbs down from residents

Joyanne Pursaga 5 minute read Friday, Aug. 14, 2026

Dozens of Winnipeggers fear plans to make way for up to 20,000 more people to live in south Transcona would dramatically alter their neighbourhood and tie hefty fees for new services to their property titles.

If city council adopts the proposed South Transcona secondary plan, all future development applications would need to conform to its goals. The affected area is located south of Dugald Road, north of St. Boniface Road, east of Plessis Road and west of Murdock Road.

Homeowner Virginia Page Jähne fears the plan could add a massive tab to the title of her 4.3-acre property to cover services required for the development.

“My main concern is that they are wanting to put $1.4 million onto my title to pay for this. Now, they say that I will not have to pay it unless I subdivide. But if a person comes by and wants to buy from me … and they see that $1.4 million … what’s the first thing (they’re) going to do?” said Page Jähne, in an interview.

Read
Friday, Aug. 14, 2026

Puzzles Palace

1 minute read Monday, Jul. 27, 2026

To solve our puzzles, please subscribe with this special offer: |

Trailblazing Western Scrap Metals heavy-equipment operator relishes role at massive crane’s control

David Sanderson 7 minute read Preview

Trailblazing Western Scrap Metals heavy-equipment operator relishes role at massive crane’s control

David Sanderson 7 minute read Friday, Aug. 14, 2026

Less than five per cent of heavy-equipment operators in the country are women but that number is trending upward, according to a study conducted by trade magazine Crane & Hoist Canada.

It was reported that in Ontario roughly eight per cent of jobs in the transport and heavy-equipment field are currently held by women. Furthermore, in 2024 almost 20 per cent of graduates at an Edmonton-based heavy-equipment operator training school were female, the article stated.

That brings us to Harmony Guspodarchuk, the first female crane operator in the 70-year history of Western Scrap Metals, a family-owned business at 18 Sutherland Ave.

Three years ago, Guspodarchuk literally stepped into the driver’s seat of a 27,500-kilogram, Liebherr C 924 Heavy Lift Litronic crane. The 29-year-old hasn’t looked back much since.

Read
Friday, Aug. 14, 2026

Corroded Arlington overpass yields way for new hope of spanning urban chasm

Melissa Martin 6 minute read Preview

Corroded Arlington overpass yields way for new hope of spanning urban chasm

Melissa Martin 6 minute read Yesterday at 2:00 AM CDT

It’s an interesting quirk of timing, perhaps, that the end of two of Winnipeg’s most unlovely features are coming into view in the same few weeks. The rail lines that split the city in half, and the bridge that was built to tie it back together. The original problem, and the solution.

And in the confluence of those two ends, we have an opportunity to dream of what a better Winnipeg can be.

At a news conference on Wednesday, former federal transport minister Lloyd Axworthy laid out a vision for a rail line bypass that would remove more than 120 railway crossings from Winnipeg, route them through Crown and Manitoba Hydro corridor land south of the city, and reclaim 250 acres in the urban core for greenspace and development.

The next step is to focus on how to make it happen. Nothing of this scope comes easy. This new bypass plan emerged from a two-year feasibility study that Premier Wab Kinew had tasked Axworthy with back in 2024. Now, Axworthy will helm a new 90-day feasibility study zooming in on that route specifically.

Read
Yesterday at 2:00 AM CDT

Big Loser’s latest a winning mix of country, folk

Ben Waldman 5 minute read Preview

Big Loser’s latest a winning mix of country, folk

Ben Waldman 5 minute read Yesterday at 6:00 AM CDT

The yellow trucker hat for sale on Facebook Marketplace said “Selkirk Lumber,” so Adam Wayne Brown knew he had to hammer home a deal.

Like the other millennial members of Winnipeg folk-country band Big Loser, the bassist has an affinity for the nostalgic, taking every opportunity — through music, through lyrics and through wardrobe — to recall the unique circumstances of growing up in a changing Interlake.

“I remember the matte yellow trucks driving around — the lumber trucks — and so I’ve had this strange memory of something disappearing from my youth and then persisting,” says Brown, who, like the band’s frontman Alex Paradoski, moved to Winnipeg more than a decade ago.

“I have a photo of the Lockport Bridge in my dining room,” chimes in Paradoski, whose first job as a teenager was bunning wieners and chopping fries at Skinner’s, a drive-in mainstay since 1929 along Highway 44.

Read
Yesterday at 6:00 AM CDT

Poilievre’s lips moving, but Canadians aren’t interested in what he’s saying

Tom Brodbeck 5 minute read Preview

Poilievre’s lips moving, but Canadians aren’t interested in what he’s saying

Tom Brodbeck 5 minute read Thursday, Aug. 6, 2026

Pierre Poilievre’s biggest political challenge right now isn’t Prime Minister Mark Carney’s popularity.

It’s the fact that he still seems to be campaigning against a political landscape that no longer exists.

More than a year after the 2025 federal election, the Conservative leader is still relying on the same message, the same themes and the same attacks that defined his party’s campaign before voters went to the polls.

And Canadians appear to be tuning it out.

Read
Thursday, Aug. 6, 2026