Fight over Canadian oil rages on after pipeline’s demise

Advertisement

Advertise with us

BILLINGS, Mont. (AP) — The Keystone XL is dead after a 12-year attempt to build the oil pipeline, yet the fight over Canadian crude rages on as emboldened environmentalists target other projects and pressure President Joe Biden to intervene — all while oil imports from the north keep rising.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 10/06/2021 (1940 days ago), so information in it may no longer be current.

BILLINGS, Mont. (AP) — The Keystone XL is dead after a 12-year attempt to build the oil pipeline, yet the fight over Canadian crude rages on as emboldened environmentalists target other projects and pressure President Joe Biden to intervene — all while oil imports from the north keep rising.

Biden dealt the fatal blow to the partially built $9 billion Keystone XL in January when he revoked its border-crossing permit issued by former President Donald Trump. On Wednesday, sponsors TC Energy and the province of Alberta gave up and declared the line “terminated.”

Activists and many scientists had warned that the pipeline would open a new spigot on Canada’s oil sands crude — and that burning the heavily polluting fuel would lock in climate change. As the fight escalated into a national debate over fossil fuels, Canadian crude exports to the U.S. steadily increased, driven largely by production from Alberta’s oil sands region.

FILE - In this Aug. 21, 2017 file photo, workers make sure that each section of the Enbridge replacement Line 3 that is joined passes muster in Superior, Wisc. The sponsor of the Keystone XL crude oil pipeline says it's pulling the plug on the contentious project, Wednesday, June 9, 2021, after Canadian officials failed to persuade the Biden administration to reverse its cancellation of the company's permit. (Richard Tsong-Taatarii/Star Tribune via AP)
FILE - In this Aug. 21, 2017 file photo, workers make sure that each section of the Enbridge replacement Line 3 that is joined passes muster in Superior, Wisc. The sponsor of the Keystone XL crude oil pipeline says it's pulling the plug on the contentious project, Wednesday, June 9, 2021, after Canadian officials failed to persuade the Biden administration to reverse its cancellation of the company's permit. (Richard Tsong-Taatarii/Star Tribune via AP)

Even before the cancellation, environmentalists had turned their attention to other projects, including Enbridge Energy’s proposal to expand and rebuild its Line 3 pipeline in Minnesota, the target of protests this week that led to the arrest of some 250 activists.

“Don’t expect these fights to go away anytime soon,” said Daniel Raimi, a fellow at Resources for the Future, an energy and environmental think tank in Washington. “This is going to encourage environmental advocates to do more of the same.”

Bill McKibben, an author who was arrested outside the White House while protesting the Keystone XL in 2011, said its defeat provides a template to kill other pipelines, including Line 3 and the Dakota Access Pipeline from North Dakota’s Bakken oil field.

Describing Keystone XL as “a carbon bomb,” McKibben said Line 3 is the same size and “carries the same stuff. How on earth could anyone with a straight face say Line 3 passes the climate test?”

Enbridge said the cancellation of Keystone XL will not affect its projects, describing them as “designed to meet current energy demand safely and in ways that better protect the environment.”

A second TC Energy pipeline network, known simply as Keystone, has been delivering crude from Canada’s oil sands region since 2010. The company says the line that runs from Alberta to Illinois, Oklahoma and the Gulf Coast has moved more than 3 billion barrels of oil.

Canada is by far the biggest foreign crude supplier to the U.S., which imported about 3.5 million barrels a day from its neighbor in 2020 — 61% of all U.S. oil imports.

The flow dropped slightly during the coronavirus pandemic but has largely rebounded. Import volumes have almost doubled since the Keystone XL was first proposed in 2008, according to the U.S. Energy Information Administration.

The Canadian Association of Petroleum Producers said Thursday that it expects no immediate effect on production from Keystone XL’s cancellation, but the group predicted more oil would be moved to the U.S. by rail.

A series of fiery accidents occurred in the U.S. and Canada after rail shipments of crude increased during an oil boom on the Northern Plains, including a 2013 incident in which 47 people were killed after a runaway train derailed in the Quebec town of Lac-Megantic.

The dispute over Keystone XL and other lines raised diplomatic tensions between the two countries, but Canadian Prime Minister Justin Trudeau adopted a conciliatory tone with Biden, who canceled the pipeline on his first day in the White House.

Canada uses much less oil than it produces, making it a huge exporter, and 98% of those exports go to the U.S., according to the Natural Resources Canada.

Trudeau raised Keystone XL as a top priority with Biden while acknowledging that the president had promised in his campaign to cancel the line.

Both leaders have taken heat at home over Keystone, with Republicans slamming Biden for shutting it down while construction was underway, costing hundreds of jobs. The project was meant to expand oil exports for Canada, which has the third-largest oil reserves in the world, and provincial officials in Alberta wanted Trudeau to do more to save it.

The White House declined to comment on the cancellation. Spokesman Vedant Patel declined to say if Biden plans to address increased crude exports from Canada or intervene in other pipeline disputes.

His action on Keystone “signals at least some appetite to get involved,” but pipelines that have operated for years would be tougher targets, Raimi said.

FILE - In this March 2, 2014, file photo, several hundred students and youth who marched from Georgetown University to the White House to protest the Keystone XL Pipeline wait to be arrested outside the White House in Washington. The sponsor of the Keystone XL crude oil pipeline says it's pulling the plug on the contentious project, Wednesday, June 9, 2021, after Canadian officials failed to persuade the Biden administration to reverse its cancellation of the company's permit. . (AP Photo/Susan Walsh, File)
FILE - In this March 2, 2014, file photo, several hundred students and youth who marched from Georgetown University to the White House to protest the Keystone XL Pipeline wait to be arrested outside the White House in Washington. The sponsor of the Keystone XL crude oil pipeline says it's pulling the plug on the contentious project, Wednesday, June 9, 2021, after Canadian officials failed to persuade the Biden administration to reverse its cancellation of the company's permit. . (AP Photo/Susan Walsh, File)

Winona LaDuke, executive director of the Indigenous-based environmental group Honor the Earth, called on Biden to withdraw an Army Corps of Engineers permit for Line 3 and to order a new study.

“He could stop the project,” she said. “Don’t ask us to be nice to Enbridge. They’re all over our land. They’re hurting us.”

The Biden administration has been “disturbingly quiet” on Line 3 and the Dakota Access line, said Michael Brune, executive director of the Sierra Club. He urged the administration to declare both unacceptable.

Fiercely opposed by Native Americans, the Dakota Access pipeline was the impetus for protests that were quashed by law enforcement. The Biden administration has not sought to stop the line, and it’s still in court after a judge revoked its permit but allowed oil to keep flowing.

Alberta sank more than $1 billion into Keystone XL last year to kick-start construction. Officials in the province are considering a trade action against the U.S. to seek compensation.

Keystone XL’s price tag ballooned as the project languished, increasing from $5.4 billion to $9 billion.

Another question: What to do with pipe already in place at the U.S.-Canada border and other infrastructure along its route.

Jane Kleeb, a pipeline opponent in Nebraska, said state regulators should revoke the permit they approved for a route through the state. Otherwise, she said, TC Energy might try to sell the easements to another company.

Until the state acts, farmers and ranchers will continue to face TC Energy attorneys in court, “protecting their property from an eminent domain land grab by a foreign corporation,” she said.

___

Daly reported from Washington and Flesher from Traverse City, Michigan. Rob Gillies contributed from Toronto and Grant Schulte from Omaha, Nebraska.

___

Follow Brown on Twitter: @MatthewBrownAP

Report Error Submit a Tip

More Stories

Transit, roads and city council’s priorities

Erna Buffie 5 minute read Preview

Transit, roads and city council’s priorities

Erna Buffie 5 minute read 2:00 AM CDT

Did any of you happen to notice that the week of Sept. 14 marked an interesting confluence of events in Winnipeg? First up was the mayoral debate on public transit. Second was an announcement that the city would be undertaking a survey to determine whether their citizens’ “transportation needs” are being met.

The debate on our public bus system, from which our current Mayor Scott Gillingham was tellingly absent, focused primarily on safety rather than the efficiency of the system.

Which, on one level, is no great surprise.

After all unlawful incidents on buses and at transit stops have increased by 280 per cent compared to levels recorded around 2016. Moreover, the candidates were primarily speaking to the bus drivers’ union that organized the event, and bus drivers are often the victims of violent episodes.

Read
2:00 AM CDT

Face up to fact you blew it with ex-wife

Maureen Scurfield 4 minute read Yesterday at 2:01 AM CDT

DEAR MISS LONELYHEARTS: My ex-wife just moved back to town and looks like a changed woman. She spent years married to me, and our kids just graduated in a city where we once lived together. That was without help from me, other than minor financial stuff.

She has found a great new job back in Winnipeg and she’ll do very well. I admire her more than any other woman I ever met, but she’s not interested in me at all.

I once had a solid, responsible job and then got into drinking, and I cheated on her. That’s why she left town. Now I’ve been sober and sorry for many years.

I asked her last weekend if I could take her out to dinner and she said no and changed the subject.

Man accused of killing five family members fires second legal team, but murder trial won’t be delayed, judge warns

Dean Pritchard 4 minute read Preview

Man accused of killing five family members fires second legal team, but murder trial won’t be delayed, judge warns

Dean Pritchard 4 minute read Updated: Yesterday at 6:44 PM CDT

A Manitoba man accused of killing five family members is once again looking for new lawyers to represent him at trial.

But Ryan Manoakeesick will stand trial, with or without a lawyer in April 2027, a judge warned him Thursday.

“I want to be clear, Mr. Manoakeesick, that the trial dates that have been set are going to remain,” King’s Bench Justice Candace Grammond told him. “Those trial dates are effectively written in stone.

“You may think that is a long time in the future, but in a trial of this kind you need to make sure you have appropriate representation and you will be ready to attend to the matter on that date.”

Read
Updated: Yesterday at 6:44 PM CDT

Gillingham talks trash, pledges big bin boost

Joyanne Pursaga 4 minute read Preview

Gillingham talks trash, pledges big bin boost

Joyanne Pursaga 4 minute read 2:01 AM CDT

Scott Gillingham says he would add hundreds of locked garbage bins downtown to prevent unsightly trash piles if re-elected as mayor.

Gillingham led a program that added about 120 locked garbage bins along Portage Avenue and Main Street last fall, after trash was repeatedly strewn around the area. If he wins a second term, he plans to add at least 200 more of the receptacles.

A look at how one locked Main Street recycle/garbage bin in front of city hall fared offers an example of the bins’ success so far, he said.

“Every day, you would see the lids up, and people had been rifling through it, or someone left the lid up and the wind picked up the garbage and (spread) it everywhere. It’s much more difficult now. Once the garbage is in, the garbage stays in,” said Gillingham.

Read
2:01 AM CDT

Woman took ‘meaningful’ responsibility after disposing of body: lawyer

Dean Pritchard 5 minute read Preview

Woman took ‘meaningful’ responsibility after disposing of body: lawyer

Dean Pritchard 5 minute read Wednesday, Sep. 30, 2026

A woman who was threatened with death if she didn’t help dispose the body of a Mexican man murdered in the basement of a North End home should serve no more jail time, a judge has been told.

Devlin Langlois, 25, has pleaded guilty to accessory after the fact to murder in the March 2025 killing of 28-year-old Diego Moscoza.

“By pleading guilty, Ms. Langlois has already taken meaningful accountability for her actions,” defence lawyer Joshua Rogala told King’s Bench Justice Candace Grammond at a sentencing hearing Monday.

He urged the judge to sentence Langlois to the equivalent of 14 months already served, plus two years supervised probation.

Read
Wednesday, Sep. 30, 2026

Thriller has steam to spare, but story slogs

Alison Gillmor 5 minute read Preview

Thriller has steam to spare, but story slogs

Alison Gillmor 5 minute read 2:01 AM CDT

Based on a 2018 book by hugely popular, wildly polarizing author Colleen Hoover (whose novels It Ends with Us, Regretting You and Reminders of Him have also been made into movies), this new adaptation is being billed as a sexy psychological thriller.

There is sex — quite a lot of sex. As for those other descriptors, Verity is not only lacking in thrills. It’s almost laughably light on plausible human psychology.

Plausibility can be overrated, of course. Scripter Nick Antosca (2026’s Cape Fear) and director Michael Showalter (The Idea of You) could have thrown plausibility out the window and gone all-in on escapist fun.

But while there is a gorgeous modernist lake house and some excellent knitwear here, and Anne Hathaway, at least, seems to be having a ball with her deliciously two-faced role, Verity is mostly a sloggy mess, with draggy pacing, flat characters and a fatal lack of atmosphere.

Read
2:01 AM CDT