Amazon to spend $20B on data centers in Pennsylvania, including one next to a nuclear power plant

Advertisement

Advertise with us

HARRISBURG, Pa. (AP) — Amazon said Monday that it will spend $20 billion on two data center complexes in Pennsylvania, including one it is building alongside a nuclear power plant that has drawn federal scrutiny over an arrangement to essentially plug right into the power plant.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 09/06/2025 (455 days ago), so information in it may no longer be current.

HARRISBURG, Pa. (AP) — Amazon said Monday that it will spend $20 billion on two data center complexes in Pennsylvania, including one it is building alongside a nuclear power plant that has drawn federal scrutiny over an arrangement to essentially plug right into the power plant.

Kevin Miller, vice president of global data centers at Amazon’s cloud computing subsidiary, Amazon Web Services, told The Associated Press that the company will build another data center complex just north of Philadelphia.

One data center is being built next to northeastern Pennsylvania’s Susquehanna nuclear power plant. The other will be in Fairless Hills at a logistics campus, the Keystone Trade Center, on what was once a U.S. Steel mill.

FILE - A data center owned by Amazon Web Services, front right, is under construction next to the Susquehanna nuclear power plant in Berwick, Pa., on Tuesday, Jan. 14, 2024. (AP Photo/Ted Shaffrey, file)
FILE - A data center owned by Amazon Web Services, front right, is under construction next to the Susquehanna nuclear power plant in Berwick, Pa., on Tuesday, Jan. 14, 2024. (AP Photo/Ted Shaffrey, file)

At a news conference in Berwick in the shadow of the power plant, Gov. Josh Shapiro called it the largest private sector investment in Pennsylvania’s history. He said Monday’s announcement is “just the beginning” because his administration is working with Amazon on additional data center projects in the state.

While critics say data centers employ relatively few people and pack little long-term job-creation punch, their advocates say they require a huge number of construction jobs to build, spend enormous sums at area vendors and generate strong tax revenues for local governments.

Shapiro touted the work that will keep construction trades members busy building Amazon’s data centers, the tech jobs that will be waiting for graduates of area colleges and the millions of dollars in property taxes that will flow to schools and local governments.

“For too long, we’ve watched as talents across Pennsylvania got hollowed out and left behind,” Shapiro said at the news conference. “No more. Now is our time to rebuild those communities and invest in them. This investment in Pennsylvania starts reversing that trend.”

Pennsylvania will provide millions of dollars, and possibly tens of millions, in incentives, typically a key element of data center deals as states compete for the large installations they hope will be an economic bonanza.

Shapiro’s administration said it would spend $10 million to pay for training classes and facilities at schools, community colleges and union halls to meet the skills demand for the data centers.

Amazon also will qualify for Pennsylvania’s existing sales tax exemption on purchases of data center equipment, such as servers and routers, an exemption that most states offer and that is viewed as a must-have for a state to compete.

The announcements add to the billions of dollars in Big Tech’s data center cash already flowing into the state.

Since 2024 started, Amazon has committed to about $10 billion apiece to data center projects in Mississippi, Indiana, Ohio and North Carolina as it ramps up its infrastructure to compete with other tech giants to meet growing demand for artificial intelligence products.

The rapid growth of cloud computing and artificial intelligence has meanwhile fueled demand for energy-hungry data centers that need power to run servers, storage systems, networking equipment and cooling systems.

The majority owner of the Susquehanna nuclear power plant, Talen Energy, announced last year that it had sold its data center to Amazon for $650 million in a deal to eventually provide 960 megawatts. That’s 40% of the output of one of the nation’s largest nuclear power plants, or enough to power more than a half-million homes.

However, the arrangement between Talen and Amazon — called a “behind the meter” connection — has been held up by the Federal Energy Regulatory Commission in the first such case to come before the agency.

It has raised questions over whether diverting power to higher-paying customers will leave enough for others and whether it’s fair to excuse big power users from paying for the grid.

For Big Tech, plugging data centers directly into a power plant can take years off their development timelines and is a much faster route to procuring power than connecting to the congested electricity grid.

It’s not clear when FERC, which blocked the deal on a procedural grounds, will decide the matter, leaving in limbo regulatory treatment of the deal and others that likely would follow.

Already in Pennsylvania, Microsoft announced a deal with the owner of the shuttered Three Mile Island nuclear power plant to restart the reactor under a 20-year agreement to supply its data centers in four states with energy.

Meanwhile, the owners of what was once Pennsylvania’s biggest coal-fired power plant say they will turn it into a $10 billion natural gas-powered data center campus.

___

Follow Marc Levy on X at: https://x.com/timelywriter.

Report Error Submit a Tip

More Stories

‘It’s childish’: Americans in Canada react to Trump’s renaming of Lake Ontario

Sharif Hassan, The Canadian Press 5 minute read Preview

‘It’s childish’: Americans in Canada react to Trump’s renaming of Lake Ontario

Sharif Hassan, The Canadian Press 5 minute read Updated: Yesterday at 10:39 AM CDT

If you’re angered by U.S. President Donald Trump's renaming of Lake Ontario to “Lake America,” chances are that an American living in your neighbourhood might be just as outraged — if not more.

Many Americans who've made Canada their home are calling it an embarrassing, even "childish," stunt.

Ben Davis, a retired law professor, said Trump’s executive order to change the lake’s name is "so beneath the office of the United States president."

"And obviously it's another one of his distractions of the day, but it's just pitiful,” Davis said.

Read
Updated: Yesterday at 10:39 AM CDT

Slow start but gritty play not enough in Bombers OT loss to Roughriders in Labour Day Classic

Ken Wiebe 7 minute read Preview

Slow start but gritty play not enough in Bombers OT loss to Roughriders in Labour Day Classic

Ken Wiebe 7 minute read Yesterday at 11:38 PM CDT

REGINA – Leave it to Brady Oliveira to succinctly describe that fine line between jubilation and the alternate.

In the aftermath of another Labour Day Classic that went down to the wire, Oliveira went through the joy of tying the game with no time left on the clock to the empty feeling that came moments later when the Saskatchewan Roughriders finished off a 32-26 victory on Sunday night before a raucous crowd of 34,352 at Mosaic Stadium.

“It’s terrible,” said Oliveira. “You just kind of feel all of the emotions. I’m pretty pissed right now. We were close, we were right there. We didn’t play our best football and we still gave ourselves a chance, which could be a silver lining.

“I don’t like to look at silver linings because the fact of the matter is we play this game to get positive results. We want to win the game and we didn’t win the game. So, I’m pissed.”

Read
Yesterday at 11:38 PM CDT

Today’s horoscope

Georgia Nicols 4 minute read Yesterday at 2:00 AM CDT

MOON ALERT: There are no restrictions to shopping or important decisions today. The moon is in Cancer.

ARIES (March 21-April 19)

Relations with parents and authority figures might be strained. Resist the urge to be too pushy. Likewise, avoid other people who are pushy. Your best choice is to work hard and get better organized. Fortunately, relations with partners are good.

TAURUS (April 20-May 20)

NDP minister needs lesson in political civility

Dan Lett 5 minute read Preview

NDP minister needs lesson in political civility

Dan Lett 5 minute read Friday, Sep. 4, 2026

Families Minister Nahanni Fontaine’s decision to intercede in Winnipeg’s mayoral election may be surprising to some political observers. To others, however, it is entirely on brand.

On Tuesday, Fontaine posted a video on social media in which she expressed concern that former city councillor and Progressive Conservative cabinet minister Kevin Klein was entering the race to challenge incumbent Mayor Scott Gillingham.

The caption on the video was blunt: “I mean, really, who chooses to work for Count Dracula?”

“Kevin Klein once worked for Peter Nygard. Peter Nygard is Canada’s equivalent to (American sex offender) Jeffrey Epstein — had his own little island, did unspeakable, disgusting things to women and girls … anyways, I just thought that Winnipeggers would want to know that Kevin Klein, at one point, worked for Peter Nygard,” she says in the video.

Read
Friday, Sep. 4, 2026

Today’s horoscope

Georgia Nicols 4 minute read 2:00 AM CDT

MOON ALERT: Avoid shopping (except food and gas) and important decisions from 8 a.m. until noon today. After that, the moon moves from Cancer into Leo.

ARIES (March 21-April 19)

Hang in there, because as this day progresses, it becomes more lighthearted and fun-loving. Admittedly, power struggles with a friend or member of a group might squelch things. Be patient with kids. Basically, this is a friendly and productive day.

TAURUS (April 20-May 20)

Thousands are still without power in Winnipeg after high winds and thunderstorms knocked out power lines Sunday.

About 4,000 Manitoba Hydro customers were still dealing with outages this morning after crews worked to restore power in the Westwood and River Heights areas, Hydro spokesman Peter Chura said. On Sunday, Hydro reported outages affecting approximately 6, 700 customers.

The high winds and heavy rain brought down trees and broke power poles, causing "very severe damage," in River Heights, one of the hardest-hit neighbourhoods, while some of the damage in the Westwood area appeared to be caused by lightning strikes, Chura said.

Thunderstorms rolled in at about 6 p.m. Sunday and brought heavy rain and high winds to some areas of the province. Winnipeg received about 35 mm of rain, while some areas got almost double that. More than 62 mm was recorded at The Forks and 68.8 mm was recorded at Portage Southport, according to Environment Canada.