Fed up with herky-jerky ride, Interlake drivers lobby for new highway Premier says he gets ‘earful’ about poor roads, advises people to reach out

Colleen Weibel and others who live or work along a scarred provincial road in the Interlake are tired of facing an anxiety-inducing drive every time they use the “dangerous” route.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 25/07/2024 (799 days ago), so information in it may no longer be current.

Colleen Weibel and others who live or work along a scarred provincial road in the Interlake are tired of facing an anxiety-inducing drive every time they use the “dangerous” route.

Weibel said Provincial Road 234 — a 92-kilometre, two-lane stretch — turns into “mud and slop” when it rains heavily, and is deeply rutted and bumpy when dry.

“Over the last 15 to 20 years, there has been a substantial increase in traffic, but very basic or minimal improvements to the road,” said Weibel.

“It has really deteriorated. The rain and all of the traffic have contributed to a very dangerous highway.”

Supplied photo 
A group of residents started a petition to get Provincial Road 234 rebuilt. It runs between Highway 8 and the Matheson Island cable ferry terminal, about 220 kilometres north of Winnipeg.
Supplied photo

A group of residents started a petition to get Provincial Road 234 rebuilt. It runs between Highway 8 and the Matheson Island cable ferry terminal, about 220 kilometres north of Winnipeg.

Weibel is part of a group that’s calling for the rebuilding of the gravel road, which runs between Highway 8 and the Matheson Island cable ferry terminal, about 220 kilometres north of Winnipeg, on the western side of Lake Winnipeg.

The group’s online petition for improvements reflects concerns in many communities about sections of highways or secondary roads.

Weibel and her husband have lived year-round in the Little Deer cottage subdivision on Lake Winnipeg for about 15 years.

Over that time, passenger vehicle and heavy truck traffic has increased due to cottage developments and peat moss mining, she said.

Weibel has never seen the road in such bad shape.

Provincial Road 234 runs between Highway 8 and the Matheson Island cable ferry terminal.
Provincial Road 234 runs between Highway 8 and the Matheson Island cable ferry terminal.

She said the province has a duty to provide safe infrastructure, especially when its decisions or project approvals result in increased traffic.

Weibel worries the poor condition of the road will slow down ambulance response times.

This spring and summer, PR 234 became “almost impassable” after episodes of heavy rainfall, she said.

“It caused a lot of anxiety for people having to travel that highway,” said Weibel. “People were feeling scared to travel. They were feeling frustrated and trapped. They were feeling neglected and abandoned.”

Passenger vehicles “bottom out” when they hit deep ruts or large bumps, with some sustaining tire, axle or suspension damage, she added.

Supplied photo 
Sections of Provincial Road 234 — a 92-kilometre, two-lane stretch — turn into “mud and slop” after heavy rain, leaving them deeply rutted when dry.
Supplied photo

Sections of Provincial Road 234 — a 92-kilometre, two-lane stretch — turn into “mud and slop” after heavy rain, leaving them deeply rutted when dry.

Weibel and others recently sent letters and made phone calls to the NDP government to push for a rebuild.

“If it doesn’t have the proper base and proper maintenance, it just deteriorates,” said Weibel. “We’ve really stressed the highway needs to be fixed for everyone. It needs to be safe the whole way up.”

New gravel was put down last week and Weibel said it brought some comfort, but it is a “Band-Aid solution.”

She said the road was neglected by past NDP and Progressive Conservative governments. She assumes it was due to costs, the area’s small population or the absence of a unified call for improvements.

“It’s a little forgotten area that we live in,” said Weibel. Most of PR 234 is located in Division 19, an unorganized area.

Premier Wab Kinew Thursday said he gets an “earful” about the condition of highways and roads when he travels around Manitoba.

“People want to see more work done on maintenance and fixing potholes,” he told reporters at an unrelated event in Grosse Isle. “A huge amount of the conversations we have day-to-day around the province are about hearing those issues, and then trying to get resources out the door to fix them.”

In April, the NDP and Opposition Tories sparred in the legislature over the capital budget for highway infrastructure.

The NDP’s 2024 budget allocated $500 million, down from $557 million under the former PC government in the last fiscal year.

“People want to see more work done on maintenance and fixing potholes.”–Premier Wab Kinew

At the time, Transportation and Infrastructure Minister Lisa Naylor claimed it was not a cut, because the Tories underspent and committed the same amount the previous year. She insisted ongoing projects would not be disrupted.

The NDP’s budget document points to a nearly $8-million increase for highway maintenance operations, including a pilot program for 24-hour coverage on the Perimeter Highway.

“We’ll be there to respond when you bend our ear about a specific stretch of highway or a specific pothole, but the real long-term fix is just to focus more on that day-in, day-out maintenance that the inventory across the province requires,” said Kinew.

The transportation and infrastructure department is responsible for about 20,000 kilometres of provincial highways and roads. Gravel roads represent about 6,000 km of the network.

“As our province grows, traffic patterns change and evolve, and (the department) continually reviews and reassesses road conditions across the provincial highway network,” a spokesperson wrote in an email.

Periods of heavy rain since May have resulted in potholes and gravel deterioration along the network, the spokesperson noted.

“Long-lasting wet conditions make road maintenance more challenging,” the spokesperson wrote. “Work on roads that require further attention will continue, when drier conditions allow, to address the adverse road conditions.”

The department’s five-year plan includes 52 kilometres of gravel restoration for PR 234 at a cost of $2.2 million. There are no current plans to pave the road.

People who live next to PR 406 near Elma, about 75 km east of Winnipeg, raised similar concerns about that road’s condition in interviews with the Free Press last month.

Spring and summer downpours made the road soft and muddy. Residents said the road was rutted and very dusty when dry.

The government spokesman said nearly nine km of planned gravel restoration work has been completed since then. Dust-control chemicals were applied.

Manitoba, for years, has faced calls to boost its spending on highways and roads.

Supplied photo 
This spring and summer, Provincial Road 234 became “almost impassable” after episodes of heavy rainfall, local resident  Colleen Weibel said.
Supplied photo

This spring and summer, Provincial Road 234 became “almost impassable” after episodes of heavy rainfall, local resident Colleen Weibel said.

“The lack of investment to maintain provincial infrastructure is cause for concern, particularly when we experience above-average precipitation and warmer temperatures — like we did earlier this year — which wreaked havoc on roads across the province,” Association of Manitoba Municipalities president Kam Blight said in a statement.

“Moreover, restrictions on provincial roads often result in traffic being diverted onto municipal roads, causing significant damage to municipal infrastructure.”

Blight said his association supports municipal leaders who call on the province to increase the maintenance budget and provide financial aid for municipal road rehabilitation and reconstruction projects.

The Progressive Conservatives issued a statement that said they had “prioritized PR 234 for upgrades in 2025 and 2026″ as per (the department’s) five-year plan and the Manitoba Parks 10-year renewal strategy.

“After cutting $57 million from this year’s highways budget, the NDP minister needs to confirm today that this project is still on the books for next year,” said PC transportation and infrastructure critic Konrad Narth said in a statement.

— With files from Gabrielle Piché

chris.kitching@freepress.mb.ca

Chris Kitching

Chris Kitching
Reporter

Chris Kitching is a general assignment reporter at the Free Press. He began his newspaper career in 2001, with stops in Winnipeg, Toronto and London, England, along the way. After returning to Winnipeg, he joined the Free Press in 2021, and now covers a little bit of everything for the newspaper. Read more about Chris.

Every piece of reporting Chris produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

Report Error Submit a Tip

More Stories

Jets new backup Stevenson ‘stoked’ to be in tandem with Skinner

Mike McIntyre 6 minute read Preview

Jets new backup Stevenson ‘stoked’ to be in tandem with Skinner

Mike McIntyre 6 minute read Wednesday, Sep. 30, 2026

It didn’t take long to get the dirt on the newest member of the Winnipeg Jets.

Meet Clay Stevenson, who has no problem if you prefer to refer to him by his long-standing nickname of “Mud.”

“You know, Clay is in the mud, and there you go. That’s it, right there,” Stevenson said Wednesday with a laugh. “I got it in juniors when I was playing in Coquitlam, and kind of stuck ever since.”

Stevenson is now hoping to make a name for himself in a city that, quite fittingly, translates to “muddy water” in Cree. The 27-year-old from Alberta was placed on waivers by the Washington Capitals and claimed by the Jets, who were looking to clarify a goaltending situation which was as murky as the Red River.

Read
Wednesday, Sep. 30, 2026

Manitoba’s own Summer Howell takes on biggest role yet as Stephen King’s telekinetic teen Carrie

Randall King 7 minute read Preview

Manitoba’s own Summer Howell takes on biggest role yet as Stephen King’s telekinetic teen Carrie

Randall King 7 minute read 3:49 PM CDT

From the tender age of eight, actress Summer Howell has made her presence known in a series of horror films shot in her home province of Manitoba.

Her first film was Curse of Chucky (2013), director Don Mancini’s continuation of the venerable killer doll series he started (as a screenwriter) in 1988 with Child’s Play.

“Even then, it was obvious she was very talented, intelligent and delightful,” Mancini said of Howell.

Though she has worked in other genres, Howell gravitated to horror repeatedly, with credits in Shawn Linden’s harrowing Hunter Hunter (2020) and the 2023 possession thriller All Fun and Games. Earlier this year, she shot the horror film Sundown in Winnipeg with director Rebekah McKendry, which premièred last week at Beyond Fest in Los Angeles and is headed for a streaming berth on Shudder.

Read
3:49 PM CDT

Netminder no stranger to heavy workload as Jets new No. 1 readies for regular-season start

Ken Wiebe 8 minute read Preview

Netminder no stranger to heavy workload as Jets new No. 1 readies for regular-season start

Ken Wiebe 8 minute read Wednesday, Sep. 30, 2026

Stuart Skinner is quick to admit that he wasn’t always wired this way.

As the Winnipeg Jets new starting goalie prepares for his fifth NHL season, Skinner conceded that the accountability aspect that is now synonymous with his character took some time to build up.

“As I grew up and got older, you go through certain things in life that either build character or make things worse for you. It depends on your choice and your decision,” Skinner said during a recent conversation with the Free Press. “I learned it through trial and error. I learned that, sometimes, it’s hard to get honest with yourself… For me, it’s definitely been a road for me to get to a place like this.

“It definitely is one of my pillars. Accountability is so important because that brings you into a spot of what you’re going to do next. It’s easy to let yourself off the hook. I’m more in the business of putting myself on the hook.”

Read
Wednesday, Sep. 30, 2026

Puzzles Palace

1 minute read Monday, Jul. 27, 2026

To solve our puzzles, please subscribe with this special offer: |

Fed up with herky-jerky ride, Interlake drivers lobby for new highway

Chris Kitching 6 minute read Preview

Fed up with herky-jerky ride, Interlake drivers lobby for new highway

Chris Kitching 6 minute read Thursday, Jul. 25, 2024

Colleen Weibel and others who live or work along a scarred provincial road in the Interlake are tired of facing an anxiety-inducing drive every time they use the “dangerous” route.

Weibel said Provincial Road 234 — a 92-kilometre, two-lane stretch — turns into “mud and slop” when it rains heavily, and is deeply rutted and bumpy when dry.

“Over the last 15 to 20 years, there has been a substantial increase in traffic, but very basic or minimal improvements to the road,” said Weibel.

“It has really deteriorated. The rain and all of the traffic have contributed to a very dangerous highway.”

Read
Thursday, Jul. 25, 2024

Nearly four in 10 Manitobans hope Canada restarts trade talks after U.S. midterm elections, poll reveals

Gabrielle Piché 5 minute read Preview

Nearly four in 10 Manitobans hope Canada restarts trade talks after U.S. midterm elections, poll reveals

Gabrielle Piché 5 minute read 7:00 AM CDT

Disorganized — that’s what Marcus Langlois calls recent United States tariffs.

He expects suppliers’ prices to increase — on mugs, pens, hoodies — for his employer, Dreamcatcher Promotions, if the United States–Canada trade war persists.

Still, he’s not pining for a quick trade deal.

“I think it should wait,” said Langlois, Dreamcatcher Promotions’ vice-president. “Let’s hope that it’s later on with proper negotiations happening.”

Read
7:00 AM CDT