‘Historic day’: two-year demolition of Arlington Bridge begins Piece-by-piece removal, working around trains makes job challenging

The first pieces of the Arlington Bridge, a long-deteriorating Winnipeg landmark, were removed Thursday morning, nearly 115 years after it was built.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

The first pieces of the Arlington Bridge, a long-deteriorating Winnipeg landmark, were removed Thursday morning, nearly 115 years after it was built.

A portion of the city’s longest bridge directly above the CPKC railway lines was the first to be taken away as part of a two-year demolition project.

The bridge was built in 1912 and closed suddenly in November 2023 due to structural issues.

Damir Muhurdarevic, the city’s Bridge Project Engineer, tells the media how the spans are going to be removed. (Mike Deal / Free Press)

Damir Muhurdarevic, the city’s Bridge Project Engineer, tells the media how the spans are going to be removed. (Mike Deal / Free Press)

Mayor Scott Gillingham called it a “historic day” as crews worked to dismantle the bridge.

“Today marks the start of what council has decided needs to happen. The bridge needs to come down,” Gillingham told reporters near the blocked-off bridge.

Decommissioning and removing the bridge will occur in two stages. The first will involve removing the south part of the bridge from Logan Avenue into the CPKC rail yard. The second phase, slated to begin in 2027, will work north at Dufferin Avenue.

The bridge will be pulled out piece by piece, lowered to the ground and demolished, said Damir Muhurdarevic, the city’s bridge projects engineer.

The demolition will proceed in 15-minute intervals to work around the trains, which will continue operating.

Winnipeg Mayor Scott Gillingham (centre) was on hand to watch the start of the historic bridge’s removal, talking to media with some city councillors on hand (from left) Janice Lukes, Ross Eadie and Vivian Santos. (Mike Deal / Free Press)

Winnipeg Mayor Scott Gillingham (centre) was on hand to watch the start of the historic bridge’s removal, talking to media with some city councillors on hand (from left) Janice Lukes, Ross Eadie and Vivian Santos. (Mike Deal / Free Press)

“It’s a challenge, the logistics of the operations of the railroad yard is complicated beyond anything I’ve ever experienced,” Muhurdarevic said.

The demolition of the bridge above the rail yard will be completed by the end of August.

“This is a very intricate project, you can appreciate there’s over 50 sets of tracks that this bridge spans that are active,” said Gillingham. “And so to take the bridge down is going to take some time.”

No full road closures are anticipated during the first phase of work. Traffic in the area of Logan Avenue and Arlington Street will be “intermittently affected,” the city said.

It has been difficult to get from the North End into central Winnipeg in the near-three years the bridge has been blocked off, said Darrell Warren, the president of the William Whyte Neighbourhood Association. He said the closure has also created regular traffic bottlenecks.

Span 15 of the Arlington Bridge is the first to be removed during the two-year demolition project Thursday morning. (Mike Deal / Free Press)

Span 15 of the Arlington Bridge is the first to be removed during the two-year demolition project Thursday morning. (Mike Deal / Free Press)

“It’s one of our main arteries, the Arlington Bridge, always was,” he said. “And now that it’s gone, McPhillips (Street) or Main Street and (the Slaw Rebchuk Bridge) is carrying the breadth of it all and causing a lot of traffic havoc there.”

He’s happy to see the project moving, but is worried that, without a timeline for when the new bridge may be funded and constructed, the wait could stretch many more years.

“Who knows, it could be two years or maybe 10 years, or maybe never, I don’t know,” he said.

City council approved $17 million to decommission and remove the bridge in January 2025, and $5 million to begin designing a new bridge.

Design work and funding to construct a new bridge will be considered by council in the future.

The bridge was built in 1912 and closed suddenly in November 2023 due to structural issues. (Mike Deal / Free Press)
The bridge was built in 1912 and closed suddenly in November 2023 due to structural issues. (Mike Deal / Free Press)

Public works chair Coun. Janice Lukes won’t be around for those considerations — she announced she would not seek a fourth term last month — but said the project, like any other that requires buy-in from the provincial and federal governments, comes with “high anxiety.”

“The real question is, where does it fit in the list of the city priorities of bridges? … There’s only so many hundreds of millions to go around, even from other levels of government, right?” she said.

“The good news is, we’ll have the design and everything all ready, because we’re refining the design.”

The city has suggested constructing the new bridge could take four to five years once it is funded.

malak.abas@freepress.mb.ca

The first stage of the demolition process involves removing the south part of the bridge from Logan Avenue into the CPKC rail yard. (Mike Deal / Free Press)
The first stage of the demolition process involves removing the south part of the bridge from Logan Avenue into the CPKC rail yard. (Mike Deal / Free Press)
The bridge will be pulled out piece by piece, lowered to the ground and demolished.  (Mike Deal / Free Press)
The bridge will be pulled out piece by piece, lowered to the ground and demolished. (Mike Deal / Free Press)
The demolition will proceed in 15-minute intervals to work around the trains, which will continue operating.  (Mike Deal / Free Press)
The demolition will proceed in 15-minute intervals to work around the trains, which will continue operating. (Mike Deal / Free Press)
The demolition of the bridge above the rail yard will be completed by the end of August.  (Mike Deal / Free Press)
The demolition of the bridge above the rail yard will be completed by the end of August. (Mike Deal / Free Press)
Design work and funding to construct a new bridge will be considered by council in the future.  (Mike Deal / Free Press)
Design work and funding to construct a new bridge will be considered by council in the future. (Mike Deal / Free Press)
The city has suggested constructing the new bridge could take four to five years once it is funded.  (Mike Deal / Free Press)
The city has suggested constructing the new bridge could take four to five years once it is funded. (Mike Deal / Free Press)
(Mike Deal / Free Press)
(Mike Deal / Free Press)
Malak Abas

Malak Abas
Reporter

Malak Abas is a city reporter at the Free Press. Born and raised in Winnipeg’s North End, she led the campus paper at the University of Manitoba before joining the Free Press in 2020. Read more about Malak.

Every piece of reporting Malak produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

History

Updated on Thursday, July 16, 2026 4:12 PM CDT: Adds quotes, details

Report Error Submit a Tip

More Stories

‘She was looking to destroy me’: convicted harasser faces new charges

Dean Pritchard 6 minute read Preview

‘She was looking to destroy me’: convicted harasser faces new charges

Dean Pritchard 6 minute read Thursday, Sep. 17, 2026

When Agnieszka Ciochon-Newton moved into the 55-plus apartment building on Stradbrook Avenue last year, she came across as “timid, soft-spoken and sensitive,” said building manager Tanya Owen.

Little did Owen know the meek-looking 58-year-old woman would soon turn her life and the lives of many of her tenants upside down and threaten her career and family.

“She was looking to destroy me for a simple tenant disagreement,” Owen said Thursday.

Court records show Ciochon-Newton was arrested earlier this month and charged with seven counts of criminal harassment, two counts of uttering threats and one count each of fraud, breaking and entering, attempting to obstruct justice, intimidation of a justice official, mischief and defamatory libel.

Read
Thursday, Sep. 17, 2026

‘Historic day’: two-year demolition of Arlington Bridge begins

Malak Abas 5 minute read Preview

‘Historic day’: two-year demolition of Arlington Bridge begins

Malak Abas 5 minute read Thursday, Jul. 16, 2026

The first pieces of the Arlington Bridge, a long-deteriorating Winnipeg landmark, were removed Thursday morning, nearly 115 years after it was built.

Read
Thursday, Jul. 16, 2026

Elmwood–East Kildonan candidate promises to tackle ‘inefficiency’ in government

Gabrielle Piché 3 minute read Preview

Elmwood–East Kildonan candidate promises to tackle ‘inefficiency’ in government

Gabrielle Piché 3 minute read Saturday, Sep. 19, 2026

The former assistant of late Elmwood–East Kildonan councillor Jason Schreyer is again running for the seat.

Chris Sweryda officially launched his campaign Saturday. He did so with the backdrop of a grocery program he runs, where food is sold near-cost out of St. Gerard School’s gym.

Rows of cereal, pasta sauce and chips filled tables ahead of the program’s afternoon opening. Sweryda created the pop-up with Schreyer months ahead of the former councillor’s April 2025 death.

The program sees roughly 500 people each day it’s open (which is every other week on Saturday), Sweryda said.

Read
Saturday, Sep. 19, 2026

‘We’re small, but we’re strong and mighty’: Lögberg-Heimskringla newspaper celebrates 140 years in Manitoba

Aaron Epp 6 minute read Preview

‘We’re small, but we’re strong and mighty’: Lögberg-Heimskringla newspaper celebrates 140 years in Manitoba

Aaron Epp 6 minute read 6:00 AM CDT

A “friend” of the Icelandic community is now 140 years old.

Lögberg-Heimskringla, a Winnipeg-based newspaper that serves the Icelandic diaspora throughout North America, has published continuously for nearly a century-and-a-half. Staff and supporters celebrated the anniversary Saturday afternoon during a gathering at the Scandinavian Cultural Centre.

“Whatever else it may be, Lögberg-Heimskringla is a friend in print — a familiar cultural institution that has enriched our lives and understanding, informing us and entertaining us at the same time,” editor Stefan Jonasson wrote in the paper’s anniversary issue, published on Sept. 15.

“It has served as a vessel to convey the Icelandic culture and heritage in North America through the course of several generations and changing circumstances, preserving memories from the past, imagining what lies ahead and reinventing itself along the way.”

Read
6:00 AM CDT

Break spell before it hexes your marriage

Maureen Scurfield 4 minute read 2:00 AM CDT

DEAR MISS LONELYHEARTS: I have an itch that needs to be scratched every couple of days. I sneak home with a new young woman from my workplace, who is a witch, and spend an hour or more with her, learning some things my wife doesn’t know anything about. It’s not really sexual with this new person yet, but I’m feeling intrigued by her witchy-ness — and more.

I’m fascinated and want to learn whatever she’s willing to teach me as we go along. This is especially cool now my “magic woman” has told me she’s interested by the darkness in me. Whatever that means. Nobody’s ever noticed that before.

I feel my wife really doesn’t need to know I’m into this stuff. It would only hurt her, and it may lead to nothing. But how do you keep a secret from your partner for any length of time when they know your every mood and can almost smell your secrets?

— Feeling Insecure, West End

New Jets show promise despite loss to experienced Oilers

Mike McIntyre 8 minute read Preview

New Jets show promise despite loss to experienced Oilers

Mike McIntyre 8 minute read Updated: Yesterday at 9:34 AM CDT

Preseason hockey games are always more about the process than the result, and that’s especially true when the opposing rosters appear to be a major mismatch on paper.

So a 5-2 loss by an inexperienced group of Winnipeg Jets skaters against a star-studded Edmonton Oilers squad on Saturday night in the Alberta capital was neither surprising nor alarming.

There was, however, plenty to like from the visitors’ perspective despite the outcome.

Let’s break it down.

Read
Updated: Yesterday at 9:34 AM CDT