Crews remove the granite seal on the White House helipad, signaling potential project delays

Advertisement

Advertise with us

WASHINGTON (AP) — Construction crews working on a new helipad at the White House have taken apart the massive granite seal that would serve as the new landing spot for Marine One, signaling potential delays in the project.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

WASHINGTON (AP) — Construction crews working on a new helipad at the White House have taken apart the massive granite seal that would serve as the new landing spot for Marine One, signaling potential delays in the project.

Photos captured by The Associated Press on Wednesday show construction workers using a jackhammer on the helipad, which no longer carries the dark gray trim of a presidential seal that was visible last week. It was unclear why the seal was being removed.

The White House said it’s continuing to make improvements as part of efforts to best match the needs of the building and its grounds. Trump has said the helipad is needed because new helicopters in the fleet used for Marine One are so powerful they rip out the South Lawn grass.

Workers use a jackhammer on the helipad on the South Lawn of the White House, Wednesday, Aug. 5, 2026, in Washington. (AP Photo/Alex Brandon)
Workers use a jackhammer on the helipad on the South Lawn of the White House, Wednesday, Aug. 5, 2026, in Washington. (AP Photo/Alex Brandon)

“For years, the White House has desperately needed a proper helipad on White House grounds that will allow the president to land safely and also protect the beautiful South Lawn grass from the fierce exhaust fumes of the incredible Marine One,” White House spokesman Davis Ingle said on Wednesday. “Thanks to President Trump, the White House has never looked better, and it will only continue to get better under his leadership.”

The helipad is part of a long list of renovations that Trump has undertaken in his second term. His projects include a 90,000-square-foot (8,360-square-meter) ballroom; a Rose Garden paved over with stone; a new marbled interior in the Palm Room, a lobby-like room that leads out to the West Colonnade and Rose Garden; and an Oval Office that continues to add gilded decorations.

Trump described the helipad at length during an Oval Office appearance last month, saying it would be made of carved granite and calling it a “beautiful thing.” The president also said Sikorsky Aircraft, a subsidiary of defense contracting giant Lockheed Martin, would be paying for the project, which he estimated would cost up to $6 million. Lockheed referred comment on the helipad construction to the White House.

The new helicopters used for Marine One are manufactured by Sikorsky and made their debut under then-President Joe Biden in 2024. But their use has been limited because their exhaust vents aim heat downward, posing a risk to the South Lawn grass.

Trump has said that using granite rather than concrete for the helipad was his suggestion. He has also noted that the landing pad could be used for other White House events, such as press conferences.

The removal of the seal was first reported by The Washington Post.

Report Error Submit a Tip

Business

LOAD BUSINESS ARTICLES