WEATHER ALERT

ATCO to build fuelling stations for CP Rail’s hydrogen locomotive program

Advertisement

Advertise with us

CALGARY - ATCO Group says it has reached a deal with Canadian Pacific Railway Ltd. to build two hydrogen production and refuelling stations in Alberta.

Read this article for free:

or

Already have an account? Log in here »

To continue reading, please subscribe:

Digital Subscription

One year of digital access for only $1.44 a week*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*Billed as $5.77 plus GST every four weeks. After 52 weeks, price increases to the regular rate of $19.95 plus GST every four weeks. Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 04/05/2022 (1517 days ago), so information in it may no longer be current.

CALGARY – ATCO Group says it has reached a deal with Canadian Pacific Railway Ltd. to build two hydrogen production and refuelling stations in Alberta.

The Calgary-based structures and logistics company says the stations will be built at CP Rail’s Calgary and Edmonton rail yards. They will be used to supply CP’s hydrogen powered locomotive program.

The railway announced in December 2020 its plans to design and build North America’s hydrogen-powered locomotive using fuel cells and batteries to power the locomotive’s electric traction motors.

Canadian Pacific Railway trains sit idle on the train tracks at the main CP Rail train yard in Toronto on Monday, March 21, 2022. ATCO Group says it has reached a deal with Canadian Pacific Railway Ltd. to build two hydrogen production and refuelling stations in Alberta.THE CANADIAN PRESS/Nathan Denette
Canadian Pacific Railway trains sit idle on the train tracks at the main CP Rail train yard in Toronto on Monday, March 21, 2022. ATCO Group says it has reached a deal with Canadian Pacific Railway Ltd. to build two hydrogen production and refuelling stations in Alberta.THE CANADIAN PRESS/Nathan Denette

The hydrogen infrastructure at each CP site will include a one megawattelectrolyzer, compression, storage and dispensing infrastructure for locomotive refuelling.

In Calgary, the electrolyzer will be powered in part by renewable electricity from CP’s existing five megawatt solar power facility.

ATCO says construction of facilities is expected to begin later this year with production and supply of hydrogen being provided to locomotives in 2023.

This report by The Canadian Press was first published May 4, 2022.

Companies in this story: (TSX:ACO.X)

Report Error Submit a Tip