California governor proposes extending nuclear plant’s life

Advertisement

Advertise with us

LOS ANGELES (AP) — California Gov. Gavin Newsom on Friday proposed extending the life of the state’s last operating nuclear power plant by five to 10 years to maintain reliable power supplies in the climate change era.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 11/08/2022 (1509 days ago), so information in it may no longer be current.

LOS ANGELES (AP) — California Gov. Gavin Newsom on Friday proposed extending the life of the state’s last operating nuclear power plant by five to 10 years to maintain reliable power supplies in the climate change era.

The proposal to keep the Diablo Canyon Nuclear Power Plant running beyond a scheduled closing by 2025 gave new urgency to a decades-long fight over the seismic safety of the site. And critics depicted Newsom’s plan as a huge financial giveaway for plant operator Pacific Gas & Electric, while warning it would gut state environmental safeguards.

Newsom’s draft proposal includes a potential forgivable loan for PG&E for up to $1.4 billion and would require state agencies to act quickly to clear the way for the reactors to continue running.

One of Pacific Gas & Electric's Diablo Canyon Power Plant's nuclear reactors in Avila Beach, Calif., is viewed Nov. 3, 2008. The California Energy Commission is holding a three-hour workshop focused on the state's power needs in the climate change era and what role the power plant might have in maintaining reliable electricity. (AP Photo/Michael A. Mariant, File)
One of Pacific Gas & Electric's Diablo Canyon Power Plant's nuclear reactors in Avila Beach, Calif., is viewed Nov. 3, 2008. The California Energy Commission is holding a three-hour workshop focused on the state's power needs in the climate change era and what role the power plant might have in maintaining reliable electricity. (AP Photo/Michael A. Mariant, File)

The seaside plant located midway between Los Angeles and San Francisco produces 9% of the state’s electricity. The proposal says its continued operation beyond 2025 is “critical to ensure statewide energy system reliability” as climate change stresses the energy system.

“The governor has been clear for months about the potential need to extend the life of Diablo Canyon,” Newsom spokesman Anthony York said.

He added that Newsom has stressed the need to keep all options on the table to maintain reliable power and that “this proposal reflects the continued need to keep that flexibility.”

Newsom’s proposal amounts to an attempt to unspool a complex 2016 agreement among environmentalists, plant worker unions and the utility to close the plant by 2025. The joint decision also was endorsed by California utility regulators, the Legislature and then-Democratic Gov. Jerry Brown.

Environmental groups depicted the move as a “dangerous” betrayal of the 2016 pact.

“Legislators should reject it out of hand,” said a joint statement from Friends of the Earth, the Natural Resources Defense Council and Environment California.

Ralph Cavanagh of the Natural Resources Defense Council said the plan would provide sweeping exemptions from environmental rules, including the California Environmental Quality Act.

“This draft was prepared by someone with little understanding of California energy policy or history,” Cavanagh said.

David Weisman, legislative director of the Alliance for Nuclear Responsibility advocacy group said Newsom’s blueprint would “give PG&E over $1 billion in loans at below the interest rate even state agencies charge among themselves, and it’s completely forgivable.”

PG&E’s service area is concentrated in Northern California and Weisman asked: “What are taxpayers in Southern California getting out of this?”

The draft proposal was released ahead of a California Energy Commission meeting on the state’s energy needs and the role that the nuclear plant could play in maintaining reliable service.

Newsom clearly wants to avoid a repeat of August 2020, when a record heat wave caused a surge in power use for air conditioning that overtaxed California’s electrical grid. That caused two consecutive nights of rolling blackouts for the state, affecting hundreds of thousands of residential and business customers.

The Newsom administration is pushing to expand clean energy, as the state aims to cut emissions by 40% below 1990 levels by 2030. Nuclear power doesn’t produce carbon pollution like fossil fuels, but leaves behind waste that can remain dangerously radioactive for centuries.

The California Legislature has less than three weeks to determine if it will endorse the plan and attempt to extend the life of the plant — a decision that would be made amid looming questions over the costs and earthquake safety risks.

The legislative session shuts down Aug. 31 — when all business is suspended — and only a rare special session called by Newsom could provide a longer period to consider the move.

The Democratic governor, who is seen as a possible future White House candidate, has urged PG&E for months to pursue a longer run beyond a scheduled closing by 2025, warning that the plant’s power is needed as the state transitions to solar, wind and other renewable sources of energy.

Those raising questions with Newsom include state Sen. John Laird, a Santa Cruz Democrat whose district includes the plant.

With an extended run, “Who pays, and is there fairness in who pays?” Laird asked in an interview. “There have been additional earthquake faults discovered near the plant, and seismic upgrades were never totally completed. Will they address that?”

Laird outlined other issues that include who would pay for maintenance that has been put off because the plant is scheduled to close by 2025, and whether there is time for PG&E to order and receive additional radioactive fuel — and casks to store spent fuel — to keep operating.

“We are under a tight timeframe,” Laird added. “That begs the question of could they do everything it needs to be extended by 2025?”

PG&E CEO Patricia “Patti” Poppe told investors in a call last month that state legislation would have to be enacted by September to open the way for the utility to reverse course.

PG&E, which has long said the plant is seismically safe, has not said much about whether it will push to extend operations beyond 2025.

The company is assessing that possibility while continuing to plan for closing and dismantling the plant “unless those actions are superseded by new state policies,” PG&E spokesperson Suzanne Hosn said in a statement.

Construction of the Diablo Canyon plant began in the 1960s and critics say potential shaking from nearby earthquake faults not recognized when the design was first approved could damage equipment and release radiation. One nearby fault was not discovered until 2008.

PG&E also would have to obtain a new operating license from the Nuclear Regulatory Commission to run the plant beyond 2025.

Newsom’s push for a longer run for the reactors doesn’t square easily with his assessment in 2016, when as lieutenant governor he supported the closure agreement as part of the State Lands Commission.

Seismic issues at the plant “are not insignificant concerns,” he said at the time. “This is not the preeminent site if you’re … concerned about seismic safety.”

Report Error Submit a Tip

More Stories

What’s open, what’s closed, what’s up in Winnipeg on National Day of Truth and Reconciliation Sept. 30, 2026

Free Press staff 4 minute read Preview

What’s open, what’s closed, what’s up in Winnipeg on National Day of Truth and Reconciliation Sept. 30, 2026

Free Press staff 4 minute read 10:38 AM CDT

The National Day of Truth and Reconciliation, or Orange Shirt Day, as it's known in Manitoba, happens Sept. 30 with many commemorative community events scheduled.

Read
10:38 AM CDT

Jets’ brass warming up to El Nino?

Mike McIntyre 7 minute read Preview

Jets’ brass warming up to El Nino?

Mike McIntyre 7 minute read Friday, Sep. 25, 2026

Decisions, decisions.

The Winnipeg Jets held their final dress rehearsal Friday night before the curtain rises next week on the new NHL season.

Unlike their first three exhibitions, this one in Denver featured competitive lineups that looked an awful lot like what we’ll see when the games start counting, with plenty of star power and veteran presence on both sides.

So what are we to make of the Jets’ 5-2 loss to the mighty Colorado Avalanche, who captured the Presidents’ Trophy last year and are once again a legitimate Stanley Cup contender?

Read
Friday, Sep. 25, 2026

Jets place two on waivers

1 minute read 1:12 PM CDT

The Winnipeg Jets are one step closer to being down to numbers.

On Sunday afternoon, centre Danny Zhilkin and defenceman Henry Thrun were placed on waivers.

That decision would suggest  defenceman Tyrel Bauer is in line to break camp with the NHL club for the first time in his career.

The final roster, with a maximum of 23 players, must be submitted on Monday afternoon.

WSO season kicks off with two fateful fifths

Holly Harris 4 minute read Preview

WSO season kicks off with two fateful fifths

Holly Harris 4 minute read 3:57 PM CDT

Saturday night’s Masterworks program, titled Beethoven 5 and Tchaikovsky 5 and led by Daniel Raiskin, also officially introduced the WSO’s new composer-in-residence, Kelly-Marie Murphy, to the weekend crowd of 1,720. She was met with enthusiastic applause and cheers upon taking the stage.

Read
3:57 PM CDT

Puzzles Palace

1 minute read Monday, Jul. 27, 2026

To solve our puzzles, please subscribe with this special offer: |

The wheels on the bus burned down, down, down…

Russell Wangersky 7 minute read Preview

The wheels on the bus burned down, down, down…

Russell Wangersky 7 minute read Yesterday at 2:00 AM CDT

Up on the high ground, a year after the big forest fire in Newfoundland’s Conception Bay North, and the bare rock is startling.

It’s ghostly. The little birds flit and chirp from the naked silver bare-wood branches, and a solitary northern flicker makes its call from — somewhere. But mostly, it’s still, and silent. With the underbrush gone, you can see how little animal life is here right now.

But the most astounding thing is underfoot. On the high rock behind Adam’s Cove and away from the sea, not only are the trees and low brush gone, but much of the soil has burned away as well.

It burned very, very hot.

Read
Yesterday at 2:00 AM CDT