UBC students construct one of Canada’s first ‘carbon-minimal’ hempcrete buildings.

Advertisement

Advertise with us

VANCOUVER - It has been two years, but University of British Columbia architecture student Katie Theall can vividly recall the"surreal moment" when their team learned it had received a site on the Vancouver campus to build a "carbon-minimal" student space.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 21/04/2023 (1256 days ago), so information in it may no longer be current.

VANCOUVER – It has been two years, but University of British Columbia architecture student Katie Theall can vividly recall the”surreal moment” when their team learned it had received a site on the Vancouver campus to build a “carbon-minimal” student space.

“That was sort of a big moment being like, this is our site, this is going to happen,” said Theall.

As the project’s architecture lead, Theall guided a team of 60 university students from engineering, architecture, business and arts to fundraise $1.85 million and build the hempcrete building on campus — from plans to plaster — all within two years.

A room inside a 'carbon-minimal' building is seen in an undated handout photo. One of Canada's first 'carbon-minimal' buildings made with hempcrete is officially open this week and it's located on the University of British Columbia's Vancouver campus. THE CANADIAN PRESS/HO-UBC, *MANDATORY CREDIT*
A room inside a 'carbon-minimal' building is seen in an undated handout photo. One of Canada's first 'carbon-minimal' buildings made with hempcrete is officially open this week and it's located on the University of British Columbia's Vancouver campus. THE CANADIAN PRESS/HO-UBC, *MANDATORY CREDIT*

Construction workers are putting the final touches on the building this week.

The 222-square-metre building, called Third Space Commons, is one of Canada’s first such institutional spaces designed to be near-zero carbon and features a seminar area, a meeting room and a kitchen.

The building is wood framed, while the thermal insulation is made of hempcrete, a mixture of hemp fibres, lime and water, which produces a much smaller carbon footprint than concrete construction, Theall said.

She said the students mixed the hempcrete in a drum, bringing it to the consistency of oatmeal. They then used buckets to pour it into the two-by-four wood frame.

The hemp fibre remains visible inside the building, creating a decorative effect on the wall, although Theall said they will be putting a layer of plaster over the lower portion for protection.

Hempcrete captures carbon from the atmosphere as it sets and eventually turns to a concrete-like material.

“The difference between concrete and hempcrete is pretty distinct. Hempcrete uses agricultural byproducts, it’s a biocomposite. So, it uses agricultural materials rather than things like aggregate,” said Theall.

The University of B.C. said in a statement the foundation of the building is made of reusable steel piles and the team chose light wood framing instead of engineered wood, which is considered more carbon-intensive because of the glues used.

The choice of hempcrete as a building material was deliberate. Theall said her team has been passionate about carbon minimization since the beginning of the project, and they all shared the same mission to reduce the carbon footprint in the construction process.

“Through our research and investigating different materials, we discovered that hempcrete is supposed to be at least carbon neutral or carbon negative, which is why we decided to try to build with it,” said Theall.

Adam Rysanek, an assistant professor at the UBC school of architecture and landscape architecture, said they have had welcome reviews from the public with some calling it “amazing” and “strange.”

“I think virtually, there is no concrete in the whole project,” said Rysanek, who advised the team on the build.

Hempcrete takes several weeks or months to cure compared with the curing time of days or weeks for concrete, but it comes with advantages such as being highly insulating, fireproof and zero-carbon, said Rysanek.

He said the team worked hard to account for the carbon impact of every element of the project.

The group also recently won an inaugural B.C. Embodied Carbon Award for small building construction by showing how the project will be responsible for up to 80 per cent less carbon emissions than had it been built with traditional materials and techniques.

The B.C. government said it is committed to reducing greenhouse-gas emissions to 40 per cent below 2007 levels by 2030, with one of its goals to identify opportunities in construction.

Switching to low-carbon building materials, or even looking into other alternatives, is an important step to ensure that we are heading toward the net-zero goal, said Ryanek.

“The step you have to take to get from concrete to no concrete or from high-carbon materials to low materials changes everything,” he said. “It’s an area of discussion that we haven’t yet started.”

Ryanek said it has only been in the last few years that they have realized how much needs to change to get to a zero-carbon building.

Theall said hempcrete might not be the ideal solution for every building, but she hopes it inspires more low-carbon designs, and that industry leaders can start cultivating innovation by using more carbon-negative materials.

I think ultimately our goal is we want industry and construction and people to be really cognizant of the environmental impact of the materials they choose, she said.

This report by The Canadian Press was first published April 21, 2023.

This story was produced with the financial assistance of the Meta and Canadian Press News Fellowship.

Report Error Submit a Tip

More Stories

Gordon Bell students relish — ‘of all things’ — new pickleball courts

Maggie Macintosh 4 minute read Preview

Gordon Bell students relish — ‘of all things’ — new pickleball courts

Maggie Macintosh 4 minute read Yesterday at 6:00 AM CDT

Manitoba’s newest public school sports facility is bringing the pickleball craze to an inner-city campus.

Gordon Bell High School unveiled four custom-made courts for the popular paddle sport this fall as part of a multi-faceted makeover.

Grade 12 student Matea Thiessen Unger called the courts “the cherry on top,” of a multi-year construction project that consumed much of her high school career.

“It was happening for so long — it felt like it was never going to end,” the 16-year-old said.

Read
Yesterday at 6:00 AM CDT

B.C. students design building using hempcrete

Nono Shen, The Canadian Press 4 minute read Preview

B.C. students design building using hempcrete

Nono Shen, The Canadian Press 4 minute read Friday, Apr. 21, 2023

VANCOUVER - It has been two years, but University of British Columbia architecture student Katie Theall can vividly recall the"surreal moment" when their team learned it had received a site on the Vancouver campus to build a "carbon-minimal" student space.

"That was sort of a big moment being like, this is our site, this is going to happen," said Theall.

As the project's architecture lead, Theall guided a team of 60 university students from engineering, architecture, business and arts to fundraise $1.85 million and build the hempcrete building on campus — from plans to plaster — all within two years.

Construction workers are putting the final touches on the building this week.

Read
Friday, Apr. 21, 2023

Four Jets clear waivers to join Moose

Ken Wiebe 3 minute read Preview

Four Jets clear waivers to join Moose

Ken Wiebe 3 minute read Yesterday at 2:28 PM CDT

The Winnipeg Jets organizational depth has yet to take a hit on the waiver wire.

On Saturday afternoon, all four players exposed to waivers — defenceman Isaak Phillips and forwards Nikita Chibrikov, Noah Gregor and Parker Ford — cleared, which means they can be assigned to the Manitoba Moose of the American Hockey League.

Owing to injuries to captain Adam Lowry and winger Cole Perfetti, both Chibrikov and Ford started last season on the NHL roster but spent the bulk of last season with the Moose.

Chibrikov, chosen in the second round of the 2021 NHL Draft, has dealt with multiple lower-body injuries during the prior two seasons and is still working his way back to peak form.

Read
Yesterday at 2:28 PM CDT

Blue Bombers whiff on their opportunities to put game away

Taylor Allen 6 minute read Preview

Blue Bombers whiff on their opportunities to put game away

Taylor Allen 6 minute read Friday, Sep. 25, 2026

In theory, Bryce Perkins has a simple job.

When it’s third and short, the Winnipeg Blue Bombers trot out the short-yardage quarterback, and all he has to do is plunge forward for a yard or two to make everyone on his sideline happy.

But on Friday night against the visiting Toronto Argonauts, he went above and beyond his job description.

The Bombers, down 24-21 with six minutes left, faced a third-and-one from their own end when Perkins found a hole and burst through it for a 76-yard touchdown to put the home team in front 28-24 late.

Read
Friday, Sep. 25, 2026

Special teams woes hurt Bombers in loss to Argos

Ken Wiebe 7 minute read Preview

Special teams woes hurt Bombers in loss to Argos

Ken Wiebe 7 minute read Yesterday at 8:06 PM CDT

THEY’VE been the most consistent of the three phases in the Winnipeg Blue Bombers arsenal this season.

A port in the proverbial storm, throughout this topsy-turvy campaign of ups-and-downs, the special-teams units have been supplying strength to a group that is still searching for consistency with only four games left in the regular season.

That’s what made this momentary lapse so costly in a 30-28 loss to the Toronto Argonauts on Friday at Princess Auto Stadium.

“We didn’t keep up our end of the bargain. And that hurts our football team, hurts our chances of winning games,” said Blue Bombers special teams ace Tanner Cadwallader. “And if we want to win close games. we’ve got to be a whole lot better than that. And we will. We’re going to come in (on Saturday for the film session) and go through it with a fine-tooth comb and just work a little bit harder.”

Read
Yesterday at 8:06 PM CDT

WSO season kicks off with two fateful fifths

Holly Harris 4 minute read Preview

WSO season kicks off with two fateful fifths

Holly Harris 4 minute read 3:57 PM CDT

Saturday night’s Masterworks program, titled Beethoven 5 and Tchaikovsky 5 and led by Daniel Raiskin, also officially introduced the WSO’s new composer-in-residence, Kelly-Marie Murphy, to the weekend crowd of 1,720. She was met with enthusiastic applause and cheers upon taking the stage.

Read
3:57 PM CDT