Oversight concerns in the pipeline Fuel-delivery safety, environmental protection responsibilities in Manitoba primarily in hands of oil industry, provincial document confirms; changes on way, government says

Manitoba has not formally inspected Winnipeg’s main fuel-supply pipeline in the last four years, instead allowing industry to take the lead on oversight — a practice critics say lacks transparency and carries environmental risks.

Read this article for free:


By clicking the button above, an account will be created and you will begin to receive some of our recommended newsletters. You may opt out of any newsletter by visiting your Email and Communication Preferences page or by clicking "unsubscribe" at the bottom of any email.

or

Already have an account? Log in here »

To continue reading, please subscribe:

Digital Subscription

One year of digital access for only $1.44 a week*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*Billed as $5.77 plus GST every four weeks. After 52 weeks, price increases to the regular rate of $19.95 plus GST every four weeks. Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 11/06/2024 (863 days ago), so information in it may no longer be current.

Manitoba has not formally inspected Winnipeg’s main fuel-supply pipeline in the last four years, instead allowing industry to take the lead on oversight — a practice critics say lacks transparency and carries environmental risks.

The absence of formal provincial inspections was confirmed in a letter recently obtained by the Free Press and the Narwhal through a freedom of information request.

Additionally, while inspectors have occasionally visited the pipeline “during the course of carrying out other duties,” no inspection reports were written following those visits, the Department of Economic Development, Investment, Trade and Natural Resources said in the letter.

MIKAELA MACKENZIE / FREE PRESS FILES
                                The Winnipeg Products Pipeline was shut down in March after Alberta-based owner Imperial Oil discovered safety concerns in a section of pipe

MIKAELA MACKENZIE / FREE PRESS FILES

The Winnipeg Products Pipeline was shut down in March after Alberta-based owner Imperial Oil discovered safety concerns in a section of pipe

The Winnipeg Products Pipeline was shut down in March after Alberta-based owner Imperial Oil discovered safety concerns in a section of pipe that runs under the Red River near St. Adolphe, south of Winnipeg. In the interim, the city’s supply of diesel, gasoline and jet fuel — which typically flows from a terminal in Gretna to Winnipeg — has been transported by rail and truck.

A lack of provincial oversight can make environmental safety difficult to enforce, experts say.

“This is a pipeline that crosses water bodies and carries several types of fuel, so there’s risk, of course, of pipeline leaks and water contamination,” said Patricia Fitzpatrick, a University of Winnipeg professor and energy and mining governance expert.

Province informally visited pipeline five times in four years

According to the freedom of information letter, provincial inspectors visited sites along the pipeline five times in the last four years. Three informal inspections were completed in 2021, and inspectors were called to the site twice in 2022 and 2023. None were considered formal inspections. No inspections were conducted in 2020.

When pressed for additional details last week on how Manitoba conducts pipeline inspections, a spokesperson said the province is changing its oversight practices and adding more staffing resources.

“Inspection capacity has been increased, which should ensure annual inspections are completed on a regular basis. Formal inspection reports will now be generated following each inspection,” the spokesperson said.

Winnipeg environmental law expert Heather Fast said it’s difficult to assess whether a company or government is adequately monitoring environmental protection without transparent and accessible documentation of emergency plans, inspection systems and enforcement actions.

“I think there’s an obligation on the part of government when you think about their duty to protect the environment, natural resources and human health, to make sure that monitoring and followup processes are working properly,” she said.

Two requests to interview a representative from Natural Resources’ petroleum branch — responsible for regulating provincial pipelines — were denied.

Over an email exchange, a provincial spokesperson was unclear on the frequency and formality of pipeline inspections.

The spokesperson initially said the province “relies on both formal and informal inspections,” adding “there were informal inspections” of the pipeline in 2023. They later clarified there was a single informal inspection last September.

When asked to clarify the distinction between formal and informal inspections, the spokesperson provided only an example of an informal inspection, such as examining how a proposed development might impact a pipeline’s infrastructure.

The spokesperson said the province “has always required inspection forms to accompany formal inspection but recently changed the requirement so that inspection reports must accompany all inspections.” They did not specify why or when the requirement was changed.

According to the spokesperson, provincial inspectors “work collaboratively” with industry to maintain regular inspections, “with the provincial inspections supporting the more extensive ones that are done by industry.”

“The outcomes of these inspections are carefully documented and provided to the province annually,” the province said.

Company inspection prompted ‘proactive’ pipeline shutdown

It was a company inspection earlier this year that determined riverbank erosion was causing stress on the decades-old pipes, leading to the “proactive” decision to shut it down for maintenance, Imperial Oil public affairs manager Keri Scobie said in a statement.

Scobie said the company has “a robust inspection program,” and their nationwide lines are regularly inspected both by Imperial Oil and third-party inspectors.

MIKAELA MACKENZIE / FREE PRESS
                                A crew member works along temporary survey markers at the Imperial Oil pipeline just south of St. Adolphe in March.

MIKAELA MACKENZIE / FREE PRESS

A crew member works along temporary survey markers at the Imperial Oil pipeline just south of St. Adolphe in March.

She did not specify how often the Winnipeg Products Pipeline is inspected or how often reports are made to the province.

Under oil and gas legislation, pipeline operators are mandated to provide annual reports that include volumes of oil transported, leaks, damage, major modifications, maintenance and other information.

Imperial Oil provided annual reports in March 2023 and February 2024, according to documents obtained via freedom of information requests. The three-page reports were redacted, citing legislation protecting the business interests of a third party.

Allowing resource companies to monitor their own work isn’t uncommon, but it’s increasingly considered a risky and outdated practice.

“No industry polices itself well,” said Bill Caram, executive director of the U.S.-based pipeline watchdog organization Pipeline Safety Trust.

“Of course, no one knows the pipeline system as well as the operator and they need to perform frequent inspections in order to maintain the integrity of their pipelines and make appropriate repairs. However, these should not replace the need for independent regulatory inspections.”

“No industry polices itself well.”–Bill Caram, executive director of Pipeline Safety Trust

Fitzpatrick has spent her career focusing on governance of energy and mining projects, including serving as an expert witness for several national pipeline project reviews.

“I don’t think the Canadian public really knows how self-regulated large-scale resource management is — including pipelines,” she said.

While companies are invested in the safety of their infrastructure, government monitoring is important to mitigate environmental and human health risks, and to ensure proper enforcement can be applied when needed, she said.

Province slow to update legislation

Manitoba, along with other provinces, has been slow to update its legislation to address these issues.

“We are operating under some old legislation that needs significant refreshers,” she said.

While Fitzpatrick argues there are no best practices for pipeline monitoring in Canada now, more effective practices have emerged in British Columbia, Alberta and at the federal level.

The Canada, B.C. and Alberta energy regulators have adopted a risk-based inspection system: oil and gas infrastructure is assessed based on several factors, including the facility’s last inspection date, the company’s compliance history, the resource being produced and the size and location of facilities. Companies still carry out their own inspections on a regular basis, but the province regularly inspects facilities and audits company compliance reports, prioritizing higher-risk facilities — including pipelines that cross waterways.

Fitzpatrick doesn’t necessarily think these risk-based assessments mean inspections happen as often as they should but said Manitoba should consider adopting such an approach.

Part of the problem, Fitzpatrick said, is the province’s oversight bodies are sorely under-resourced when it comes to both funds and staff.

The provincial government currently lists just two petroleum inspectors in its staff directory, while two positions appear to be vacant.

julia-simone.rutgers@freepress.mb.ca

FIPPA response on pipeline inspection

Julia-Simone Rutgers

Julia-Simone Rutgers
Reporter

Julia-Simone Rutgers is an investigative reporter who joined the Free Press in 2020. Read more about Julia-Simone.

Every piece of reporting Julia-Simone produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

Report Error Submit a Tip

More Stories

MPI gambles with low rate request

Editorial 4 minute read Preview

MPI gambles with low rate request

Editorial 4 minute read Updated: 10:16 AM CDT

It sounds a bit like a gamble from a player in an industry that is almost pathologically averse to gambling.

Read
Updated: 10:16 AM CDT

Katz ‘violated public trust,’ Sheegl lacked ‘moral compass,’ police HQ inquiry commissioner concludes

Joyanne Pursaga 8 minute read Preview

Katz ‘violated public trust,’ Sheegl lacked ‘moral compass,’ police HQ inquiry commissioner concludes

Joyanne Pursaga 8 minute read Monday, Oct. 19, 2026

The final report from the public inquiry into the scandal-plagued Winnipeg Police Service headquarters construction project concludes that former mayor Sam Katz and former city CAO Phil Sheegl broke public trust and engaged in unethical conduct.

And the report, released Monday by inquiry commissioner Garth Smorang, says the cost of the project — transforming a downtown Canada Post office tower and warehouse into the police HQ — soared, in part, because main contractor Caspian Projects overcharged the city by more than $40 million in expenses.

The project’s initial $135-million initial price tag rose to about $209 million in the end. The city purchased the complex in 2009; construction was completed in 2016.

Smorang’s report concludes Katz “violated the public trust” and council code of conduct, and Sheegl suffered from a “complete lack of a moral compass.”

Read
Monday, Oct. 19, 2026

Gillingham says Portage and Main underground should stay open

Joyanne Pursaga 6 minute read Preview

Gillingham says Portage and Main underground should stay open

Joyanne Pursaga 6 minute read Updated: 7:27 PM CDT

Scott Gillingham said he hopes to keep the circular concourse beneath Portage Avenue and Main Street open, if he’s re-elected mayor next week.

“I would like to find a way for it to stay,” said Gillingham during the mayoral debate hosted by CJOB Wednesday.

The downtown intersection reopened to pedestrians at street level in June 2025.

When he first supported that hotly debated reopening in 2024, Gillingham called for the underground mall to be closed. At the time, the city estimated it would take $73 million and up to five years of traffic-snarling construction to repair the leaking membrane under the street that protects the properties below.

Read
Updated: 7:27 PM CDT

Policy change gives Manitoba renters a break from proposed hikes

Scott Billeck 5 minute read Preview

Policy change gives Manitoba renters a break from proposed hikes

Scott Billeck 5 minute read Updated: Yesterday at 5:33 PM CDT

Aidan Wilson said he was reduced to tears after getting a call from Premier Wab Kinew’s office.

He’d just learned tenants of a West Broadway apartment, including himself, would no longer pay a hundreds-of-dollars monthly rent increase as of Nov. 1.

“It’s been a lot to deal with, it’s a lot to push for, and it’s a lot to speak up. All of these emotions just kind of came flooding out,” Wilson said Tuesday at a news conference alongside Kinew.

The premier announced that renters will not have to pay the increases until the provincial Residential Tenancies Branch hears landlords’ arguments and issues its decisions.

Read
Updated: Yesterday at 5:33 PM CDT

Campaign blunder: Klein features wrong city in election video

Malak Abas 4 minute read Preview

Campaign blunder: Klein features wrong city in election video

Malak Abas 4 minute read Monday, Oct. 19, 2026

A paid ad from mayoral candidate Kevin Klein on his commitment to Winnipeg has been pulled after commenters noticed one small error: the footage used in the ad was actually of Edmonton.

Read
Monday, Oct. 19, 2026

Inappropriate late-night texts to students costs teachers their jobs

Maggie Macintosh 5 minute read Preview

Inappropriate late-night texts to students costs teachers their jobs

Maggie Macintosh 5 minute read Updated: Yesterday at 5:41 PM CDT

Manitoba’s independent teacher commissioner has cancelled two certificates this month because of inappropriate late-night messaging with minors.

Read
Updated: Yesterday at 5:41 PM CDT