Flooding shutters Nordale School for months

Advertisement

Advertise with us

The start of the school year has been delayed for hundreds of students in Winnipeg thanks to mould and moisture-related damage

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

The start of the school year has been delayed for hundreds of students in Winnipeg thanks to mould and moisture-related damage

Two school divisions announced disruptions to their scheduled programming this week owing to building safety.

“It’s not the start of the school year that anybody hopes for,” said Jackie Connell, superintendent of the Louis Riel School Division.

Nordale School is anticipated to be closed for four months as crews clean up “substantial” destruction from a storm on the long weekend, Connell said.

Roughly 200 students have been displaced from their kindergarten-to-Grade 8 classrooms in Norwood Flats as a result.

Their first day, which will take place at different nearby sites, has been pushed back until Monday.

Staff at Nordale, built in 1949, have reported minor moisture problems in the past.

Nordale is grappling with the fallout of a sewage backup related to last weekend’s storm, Connell said.

The Louis Riel superintendent observed water “in almost all places” when she toured the school on Labour Day.

The gymnasium floor, wooden book shelves and teaching material are among the things that need to be replaced, she said, adding she’s grateful for both staff and families’ patience and flexibility as everything gets sorted.

For the time being, Grade 7 and 8 students are relocating to Nelson McIntyre Collegiate, which is within walking distance to their home school.

Younger students are being bused to Shamrock School indefinitely.

In the Winnipeg School Division, nearly 700 students have been invited back to their building after a brief closure.

École Stanley Knowles School in Tyndall Park postponed its opening after mould was discovered by teachers setting up their classrooms at the end of August.

Superintendent Matt Henderson penned a letter to families on Sept. 3 to inform them classes would begin a day later than scheduled because of an HVAC malfunction.

Three teachers contacted the Free Press to report staff were misled about the extent of cleaning and air testing done, and white and green fuzz, as well as significant dust, was found Thursday.

“Multiple teachers were complaining about headaches and feeling stuffed up,” said one of the teachers who spent Tuesday and Wednesday preparing with colleagues offsite.

Senior administration confirmed there were reports of “surface mould” Thursday so two classes were relocated but no children were exposed to the spaces.

Henderson said the division has followed the advice of third-party environmental consultants and its internal workplace health and safety team.

Air-quality testing deemed the building safe on Tuesday, Wednesday and Thursday, he said, adding that one room had “slightly elevated results” on Friday so it was re-cleaned and retested.

maggie.macintosh@freepress.mb.ca

Maggie Macintosh

Maggie Macintosh
Education reporter

Maggie Macintosh reports on education for the Free Press. Originally from Hamilton, Ont., she first reported for the Free Press in 2017. Read more about Maggie.

Funding for the Free Press education reporter comes from the Government of Canada through the Local Journalism Initiative.

Every piece of reporting Maggie produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

History

Updated on Friday, September 11, 2026 5:42 PM CDT: Updates headline

Report Error Submit a Tip

Local

LOAD LOCAL ARTICLES