Built to disappear: World Cup stadium 974

Advertisement

Advertise with us

DOHA, Qatar (AP) — Of the seven stadiums Qatar built for the World Cup, one will disappear after the tournament.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 03/12/2022 (1373 days ago), so information in it may no longer be current.

DOHA, Qatar (AP) — Of the seven stadiums Qatar built for the World Cup, one will disappear after the tournament.

That’s what the games’ organizers have said about Stadium 974 in Doha — a port-side structure with more than 40,000 seats partially built from recycled shipping containers and steel.

Qatar says the stadium will be fully dismantled after the World Cup and could be shipped to countries that need the infrastructure. Outside experts have praised the design, but say more needs to be known about what happens to the stadium after the event.

FILE - A view of the Stadium 974 during the World Cup group G soccer match between Brazil and Switzerland, in Doha, Qatar, Monday, Nov. 28, 2022. (AP Photo/Thanassis Stavrakis, File)
FILE - A view of the Stadium 974 during the World Cup group G soccer match between Brazil and Switzerland, in Doha, Qatar, Monday, Nov. 28, 2022. (AP Photo/Thanassis Stavrakis, File)

“Designing for disassembly is one of the main principles of sustainable building,” said Karim Elgendy, an associate fellow at the London-based Chatham House think tank who previously worked as a climate consultant for the World Cup.

“It allows for the natural restoration of a building site or its reuse for another function,” he said, adding that a number of factors need to considered “before we call a building sustainable.”

Buildings are responsible for nearly 40% of the world’s energy-related carbon emissions. Of that, about 10% comes from “embodied” carbon or the greenhouse gas emissions related to the construction, maintenance and demolition of buildings.

Qatar has faced international criticism for its treatment of low-paid migrant workers who built over $200 billion worth of stadiums, metro lines and other infrastructure for the World Cup. Qatar says the criticism ignores labor reforms enacted in recent years.

Stadium 974, named after Qatar’s international dialing code and the number of containers used to build the stadium, is the only venue that Qatar constructed for the World Cup that isn’t air-conditioned. During a match Friday in which Switzerland defeated Serbia, the air was noticeably more humid and hot than in other venues.

The stadium is hosting only evening matches, when temperatures are cooler.

Fenwick Iribarren Architects, which designed Stadium 974 and two other World Cup stadiums, says the idea was to avoid building a “white elephant,” a stadium that is left unused or underused after the tournament ends, as happened following previous World Cups in South Africa, Brazil and Russia.

Qatar says it has developed plans for the other six stadiums after the games are over. Many will have a number of seats removed.

The multi-colored shipping containers are used as building blocks for Stadium 974 and also to house facilities such as restrooms in the interior of the structure. Like giant Lego blocks, the bright red, yellow and blue corrugated steel boxes appear suspended between layers of steel. The design gives the stadium an industrial feel.

Qatar has not detailed where the dismounted stadium will go after the tournament or even when it will be taken down. Organizers have said the stadium could be repurposed to build a venue of the same size elsewhere or multiple smaller stadiums.

Where its components go matters because of the emissions implicated by shipping them thousands of kilometers away.

Carbon Market Watch, an environmental watchdog group that investigated Qatar’s World Cup sustainability plans, said whether Stadium 974 has a lower carbon footprint than a permanent one comes down to “how many times, and how far, the stadium is transported and reassembled.”

FIFA and Qatar acknowledge that in a report estimating the stadium’s emissions. If the stadium is reused only once, they estimate its emissions would be lower than a permanent one as long as it is shipped fewer than 7,000 kilometers (about 4,350 miles) away.

If it’s repurposed more than once, it could be shipped farther and still be less polluting than a permanent venue, they said, because of how energy-intensive building multiple new stadiums is.

Qatar’s Supreme Committee for Delivery and Legacy, the organizing committee for the World Cup, did not respond to a request for more information about plans after the tournament.

The report also didn’t factor in operational emissions — or those produced from running a building — once the stadium is repurposed because standards vary in different countries, FIFA and Qatar said.

“The energy required for dismantling and shipping the building components will obviously need to be estimated,” Elgendy said, “but it is unlikely to outweigh the carbon embodied in the building materials.”

For now, the stadium’s design isn’t lost on spectators. On any game night, fans entering and leaving the stadium take selfies against its modern, industrial facade. The temporary stadium is hosting seven games in total — with the final one on Monday between Brazil and South Korea.

Jhonarel Miñoza, a 42-year-old Qatari resident originally from the Philippines, said she and her sister wanted to see a game in each of the seven stadiums.

Miñoza, an administrative officer who has lived in Qatar for five years, said she had heard about Stadium 974′s unconventional design before the game she attended on Friday.

“I was really eager to know how they built it,” Miñoza said. “When I came inside here, I was just checking how they did that.”

___

AP World Cup coverage: https://apnews.com/hub/world-cup and https://twitter.com/AP_Sport

Report Error Submit a Tip

More Stories

Controlling pace of response path to success

Tim Kist 5 minute read Yesterday at 2:01 AM CDT

WITH the recent collapse of Canada-U.S. trade talks, the economic, political and social changes are coming at business leaders on a daily basis.

While you cannot control the pace of these changes, you can control the pace of response and timing of actions your organization takes. This is a time for thoughtful analysis and careful action, not chasing the latest trends.

Artificial intelligence, for example, can write articles, create images, draft emails and perform seemingly countless other tasks. But is this new tool solving a current business problem?

Successful companies know they must develop a strategy before launching any tactics. Otherwise, the strategy is based on “hope” — and we all know hope is not a strategy.

Built to disappear: World Cup stadium 974

Suman Naishadham, The Associated Press 5 minute read Preview

Built to disappear: World Cup stadium 974

Suman Naishadham, The Associated Press 5 minute read Saturday, Dec. 3, 2022

DOHA, Qatar (AP) — Of the seven stadiums Qatar built for the World Cup, one will disappear after the tournament.

That’s what the games’ organizers have said about Stadium 974 in Doha — a port-side structure with more than 40,000 seats partially built from recycled shipping containers and steel.

Qatar says the stadium will be fully dismantled after the World Cup and could be shipped to countries that need the infrastructure. Outside experts have praised the design, but say more needs to be known about what happens to the stadium after the event.

“Designing for disassembly is one of the main principles of sustainable building,” said Karim Elgendy, an associate fellow at the London-based Chatham House think tank who previously worked as a climate consultant for the World Cup.

Read
Saturday, Dec. 3, 2022

Mayoral candidate Gillingham vows building boom; Vogiatzakis, Woodstock promise improved safety

Joyanne Pursaga 5 minute read Preview

Mayoral candidate Gillingham vows building boom; Vogiatzakis, Woodstock promise improved safety

Joyanne Pursaga 5 minute read Friday, Sep. 4, 2026

Scott Gillingham promised several new steps to help get more homes and businesses built in Winnipeg Friday, if re-elected as mayor, amid other pledges from his competition.

Read
Friday, Sep. 4, 2026

Puzzles Palace

1 minute read Monday, Jul. 27, 2026

To solve our puzzles, please subscribe with this special offer: |

Smith’s pretzel logic confuses

Editorial 4 minute read Preview

Smith’s pretzel logic confuses

Editorial 4 minute read Yesterday at 2:01 AM CDT

Alberta Premier Danielle Smith had both sides of her mouth working overtime on Aug. 30, when she spoke at an event in Calgary to commemorate Alberta Day, the annual celebration of the province’s entry into Confederation in 1905 (officially Sept. 1, it was celebrated on the weekend).

Smith’s comments — and the things she did not say — revealed a lot about the political tightrope the premier is trying to walk over the challenges currently faced by her province. At the top of that list of challenges is a persistent campaign to separate Alberta from the aforementioned Confederation. A campaign that Smith appears to both support and oppose, depending on which day of the week it is.

Her Alberta Day remarks were an excellent case in point.

Smith has decided that on Oct. 19, Albertans will vote on a series of non-binding propositions in a province referendum. One of those questions will ask Albertans whether they want to hold a referendum on separation, thus making this fall’s vote a “referendum on whether to hold a referendum,” as some observers have dubbed it.

Read
Yesterday at 2:01 AM CDT

Man who pleaded guilty to killing three cats dies before sentencing

Morgan Modjeski 3 minute read Preview

Man who pleaded guilty to killing three cats dies before sentencing

Morgan Modjeski 3 minute read Friday, Sep. 4, 2026

A Winnipeg man awaiting sentencing after admitting he strangled three cats to death and dumped two of their carcasses under a city bridge, has died, the Free Press has learned.

Randy Jensen, 25, pleaded guilty on May 13 to one count of wilfully causing injury or suffering to animals in connection to the 2024 killings.

He was scheduled to be sentenced in January.

“That’s not something that anybody wanted,” said Kristy Zamonsky, founder of Project Artemis Animal Advocates. “We were all hoping for justice through the courts.”

Read
Friday, Sep. 4, 2026