Canada Infrastructure Bank loaning $220M to Flo for EV charging network expansion
Advertisement
Read this article for free:
or
Already have an account? Log in here »
To continue reading, please subscribe:
Digital Subscription
One year of digital access for only $205*
- Enjoy unlimited reading on winnipegfreepress.com
- Read the E-Edition, our digital replica newspaper
- Access News Break, our award-winning app
- Play interactive puzzles
*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.
To continue reading, please subscribe:
Add Free Press access to your Brandon Sun subscription for only an additional
$1 for the first 4 weeks*
- Enjoy unlimited reading on winnipegfreepress.com
- Read the E-Edition, our digital replica newspaper
- Access News Break, our award-winning app
- Play interactive puzzles
*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.
Read unlimited articles for free today:
or
Already have an account? Log in here »
Hey there, time traveller!
This article was published 26/04/2023 (1251 days ago), so information in it may no longer be current.
TORONTO – Electric vehicle drivers can expect more charging options ahead as the Canada Infrastructure Bank is loaning $220 million to Flo Services Inc. to expand its network.
The Infrastructure Bank says the loan will allow Quebec City-based Flo to install more than 2,000 charging ports, nearly doubling the number of universal public fast charging ports available in Canada.
The loan is the first from the Infrastructure Bank’s $500 million fund designed specifically to increase EV charging and hydrogen refuelling options.
Flo will own and operate the network that will mostly use its own dual-port, 320 kilowatt chargers designed to bring most EV batteries to an 80 per cent charge in 15 minutes.
The chargers are expected to be installed within four years at about 400 sites across Canada.
Investments in charging networks come as the government is also mandating that at least 60 per cent of vehicle sales be electric by 2030 and 100 per cent by 2035.
This report by The Canadian Press was first published April 26, 2023.
Note to readers: This is a corrected story. A previous version had the incorrect city of where Flo is based.