‘Serious errors’ by B.C. prison officials who knew about a 4-year water leak: report

Advertisement

Advertise with us

The federal Public Sector Integrity Commissioner says the Correctional Service of Canada committed "gross mismanagement" when it took nearly four years to fix pipes at a B.C. prison that were leaking chemically treated water into the ground.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 20/03/2024 (921 days ago), so information in it may no longer be current.

The federal Public Sector Integrity Commissioner says the Correctional Service of Canada committed “gross mismanagement” when it took nearly four years to fix pipes at a B.C. prison that were leaking chemically treated water into the ground.

Harriet Solloway says millions of litres of water from the building’s heating system seeped into the ground surrounding the Matsqui Institution in Abbotsford, B.C., which is on top of three aquifers, including one that flows into a salmon-bearing stream.

“In reviewing the evidence, it becomes clear that CSC management did not undertake adequate and timely remedial action, demonstrating serious errors impacting safety and potentially harming the environment — not reflecting responsible stewardship of government funds and assets,” Solloway concluded in her report issued this week.

The Matsqui Institution, a medium-security federal men's prison, is seen in Abbotsford, B.C., on October 26, 2017. THE CANADIAN PRESS/Darryl Dyck
The Matsqui Institution, a medium-security federal men's prison, is seen in Abbotsford, B.C., on October 26, 2017. THE CANADIAN PRESS/Darryl Dyck

The central water system’s main purpose is to supply hot water for domestic use and heat the three institutions that are part of the Matsqui Complex, which houses more than 1,000 inmates.

Solloway’s report says an engineer first noticed problems with the system, which requires the addition of anti-corrosion chemicals to boiling water, in August 2017 and warned officials about “a substantial leak.”

They were told that the best way to fix the leak is to dig up the system, which is about one and a half metres underground.

Excavation of the area began the next month but had to stop because of the frozen winter ground.

Almost a year later, in July 2018, the engineer sent an email to management noting, “this leak needs to be addressed” and that by the end of the month, approximately 1.1 million litres of chemically treated hot water would have seeped into the ground.

Solloway’s report says the department tried unsuccessfully in 2018 to locate the leak using a procedure involving high-water pressure and a vacuum to remove soil.

“The engineer continued to raise the alarm throughout 2020 and 2021, but he was ignored,” the report says.

Solloway says management didn’t believe the leak was worsening, despite their lack of engineering expertise, with some managers suggesting the monitoring equipment was not “scientific enough.”

“These assertions were made by managers who did not possess engineering expertise to make such determinations,” the report says.

The report says cost, and the possibility that the system was going to be replaced, may be two reasons for the inaction.

“Finally, on April 29, 2021, excavation of the entire pipe system was undertaken, nearly four years after an engineer’s recommendation. As a result, multiple leaks were eventually found. By that time, according to CSC engineering personnel, millions of litres of chemically treated hot water had seeped into the ground,” the report says.

Solloway made four recommendations in her report, including that the department establish an “action plan” for critical infrastructure risks and failures, that maintenance plans are up to date and that there be an environmental impact assessment.

In a response included with the report, the Correctional Service of Canada says it disagrees that it committed wrongdoing, noting that an independent report in 2022 found there was no contamination from the “highly diluted rust inhibitors” leaking from the pipes.

It says reports in 2020 and 2021 “deemed the risks to be negligible.”

This report by The Canadian Press was first published March 20, 2024.

Report Error Submit a Tip

More Stories

Gordon Bell students relish — ‘of all things’ — new pickleball courts

Maggie Macintosh 4 minute read Preview

Gordon Bell students relish — ‘of all things’ — new pickleball courts

Maggie Macintosh 4 minute read Yesterday at 6:00 AM CDT

Manitoba’s newest public school sports facility is bringing the pickleball craze to an inner-city campus.

Gordon Bell High School unveiled four custom-made courts for the popular paddle sport this fall as part of a multi-faceted makeover.

Grade 12 student Matea Thiessen Unger called the courts “the cherry on top,” of a multi-year construction project that consumed much of her high school career.

“It was happening for so long — it felt like it was never going to end,” the 16-year-old said.

Read
Yesterday at 6:00 AM CDT

What’s open, what’s closed, what’s up in Winnipeg on National Day of Truth and Reconciliation Sept. 30, 2026

Free Press staff 4 minute read Preview

What’s open, what’s closed, what’s up in Winnipeg on National Day of Truth and Reconciliation Sept. 30, 2026

Free Press staff 4 minute read 10:38 AM CDT

The National Day of Truth and Reconciliation, or Orange Shirt Day, as it's known in Manitoba, happens Sept. 30 with many commemorative community events scheduled.

Read
10:38 AM CDT

‘In Normandy, we remember’

Aaron Epp 4 minute read Preview

‘In Normandy, we remember’

Aaron Epp 4 minute read Yesterday at 6:23 PM CDT

Travelling nearly 7,000 km from his home in France to Winnipeg gave Gabriel Zaranski a new perspective on warfare.

“It’s very different to speak about war in school (than) to speak with real people who (have fought) in a war,” he said. “We can feel the emotion when they speak … The testimony has more impact when it’s real soldiers.”

Zaranski is one of 14 Grade 12 students from Bayeux, a town in France’s Normandy region, in Winnipeg this week for a learning tour.

The students, who attend Lycée Arcisse de Caumont high school, met on Saturday with veterans from the Queen’s Own Cameron Highlanders of Canada, a local military regiment, to discuss their studies and the regiment’s role in the Second World War.

Read
Yesterday at 6:23 PM CDT

Bison kicker Turner named captain, shows she belongs

Joshua Frey-Sam 8 minute read Preview

Bison kicker Turner named captain, shows she belongs

Joshua Frey-Sam 8 minute read Yesterday at 11:17 PM CDT

Even on nights like this, Maya Turner can appreciate how far she’s come.

Though it feels like yesterday that the Manitoba Bisons kicker arrived on the scene with an unheralded right leg and a point to prove, these days the fifth-year student-athlete is lining up to split the uprights with a veteran boot and the added responsibility of being a team captain.

Getting to this point wasn’t easy, though.

It’s now four years ago that Turner ditched her NCAA Division 1 soccer career at Loyola University in Chicago to kick a different ball on the gridiron and signed with the Bisons, who were one of more than one hundred programs across North America that she sent tape to in hopes of realizing a new dream.

Read
Yesterday at 11:17 PM CDT

Unhappy Dynacare staff refuse OT shifts; doors could be closed at clinics with Saturday hours

Carol Sanders 4 minute read Preview

Unhappy Dynacare staff refuse OT shifts; doors could be closed at clinics with Saturday hours

Carol Sanders 4 minute read Friday, Sep. 25, 2026

Some Winnipeg Dynacare sites normally open on Saturday were closed last week, and may continue to be because staff are refusing to pick up overtime shifts after they were forced back to work amid a labour dispute with the company.

Read
Friday, Sep. 25, 2026

Jets’ brass warming up to El Nino?

Mike McIntyre 7 minute read Preview

Jets’ brass warming up to El Nino?

Mike McIntyre 7 minute read Friday, Sep. 25, 2026

Decisions, decisions.

The Winnipeg Jets held their final dress rehearsal Friday night before the curtain rises next week on the new NHL season.

Unlike their first three exhibitions, this one in Denver featured competitive lineups that looked an awful lot like what we’ll see when the games start counting, with plenty of star power and veteran presence on both sides.

So what are we to make of the Jets’ 5-2 loss to the mighty Colorado Avalanche, who captured the Presidents’ Trophy last year and are once again a legitimate Stanley Cup contender?

Read
Friday, Sep. 25, 2026