Trump halts work on New England offshore wind project that’s nearly complete

Advertisement

Advertise with us

The Trump administration halted construction on a nearly complete offshore wind project near Rhode Island as the White House continues to attack the battered U.S. offshore wind industry that scientists say is crucial to the urgent fight against climate change.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 23/08/2025 (402 days ago), so information in it may no longer be current.

The Trump administration halted construction on a nearly complete offshore wind project near Rhode Island as the White House continues to attack the battered U.S. offshore wind industry that scientists say is crucial to the urgent fight against climate change.

Danish wind farm developer Orsted says the Revolution Wind project is about 80% complete, with 45 out of its 65 turbines already installed.

Despite that progress — and the fact that the project had cleared years of federal and state reviews — the Bureau of Ocean Energy Management issued the order Friday, saying the federal government needs to review the project and “address concerns related to the protection of national security interests of the United States.”

FILE - Wind turbines of South Fork Wind are seen off the coast of Block Island, R.I., Oct. 9, 2024. (AP Photo/Seth Wenig, File)
FILE - Wind turbines of South Fork Wind are seen off the coast of Block Island, R.I., Oct. 9, 2024. (AP Photo/Seth Wenig, File)

It did not specify what the national security concerns are.

President Donald Trump has made sweeping strides to prioritize fossil fuels and hinder renewable energy projects. Trump recently called wind and solar power “THE SCAM OF THE CENTURY!” in a social media post and vowed not to approve wind or “farmer destroying Solar” projects. “The days of stupidity are over in the USA!!!” he wrote on his Truth Social site this week.

Scientists across the globe agree that nations need to rapidly embrace renewable energy to stave off the worst effects of climate change, including extreme heat and drought; larger, more intense wildfires and supercharged hurricanes, typhoons and rainstorms that lead to catastrophic flooding.

Rhode Island Gov. Dan McKee criticized the stop-work order and said he and Connecticut Gov. Ned Lamont “will pursue every avenue to reverse the decision to halt work on Revolution Wind” in a post on X. Both governors are Democrats.

Construction on Revolution Wind began in 2023, and the project was expected to be fully operational next year. Orsted says it is evaluating the financial impact of stopping construction and is considering legal proceedings.

Revolution Wind is located more than 15 miles (24 kilometers) south of the Rhode Island coast, 32 miles (51 kilometers) southeast of the Connecticut coast and 12 miles (19 kilometers) southwest of Martha’s Vineyard. Rhode Island is already home to one offshore wind farm, the five-turbine Block Island Wind Farm.

Revolution Wind was expected to be Rhode Island and Connecticut’s first commercial-scale offshore wind farm, capable of powering more than 350,000 homes. The densely populated states have minimal space available for land-based energy projects, which is why the offshore wind project is considered crucial for the states to meet their climate goals.

“This arbitrary decision defies all logic and reason — Revolution Wind’s project was already well underway and employed hundreds of skilled tradesmen and women. This is a major setback for a critical project in Connecticut, and I will fight it,” Connecticut Sen. Richard Blumenthal, a Democrat, said in a statement.

Wind power is the largest source of renewable energy in the U.S. and provides about 10% of the electricity generated in the nation.

“Today, the U.S. has only one fully operational large-scale offshore wind project producing power. That is not enough to meet America’s rising energy needs. We need more energy of all types, including oil and gas, wind, and new and emerging technologies,” said Erik Milito, president of the National Ocean Industries Association, a group that supports offshore oil, gas and wind.

Green Oceans, a nonprofit that opposes the offshore wind industry, applauded the BOEM’s decision. “We are grateful that the Trump Administration and the federal government are taking meaningful action to preserve the fragile ocean environment off the coasts of Rhode Island and Massachusetts,” the nonprofit said in a statement.

This is the second major offshore wind project the White House has halted. Work was stopped on Empire Wind, a New York offshore wind project, but construction was allowed to resume after New York Sen. Chuck Schumer and Gov. Kathy Hochul, both Democrats, intervened.

“This administration has it exactly backwards. It’s trying to prop up clunky, polluting coal plants while doing all it can to halt the fastest growing energy sources of the future – solar and wind power,” said Kit Kennedy, managing director for the power division at Natural Resources Defense Council, in a statement. “Unfortunately, every American is paying the price for these misguided decisions.”

___

Reporter Jennifer McDermott contributed from Providence, Rhode Island, and Matthew Daly contributed from Washington.

___

The Associated Press’ climate and environmental coverage receives financial support from multiple private foundations. AP is solely responsible for all content. Find AP’s standards for working with philanthropies, a list of supporters and funded coverage areas at AP.org.

Report Error Submit a Tip

More Stories

Manitoba PCs choose interim leader as Khan blasts Tory MLAs

Carol Sanders 2 minute read Preview

Manitoba PCs choose interim leader as Khan blasts Tory MLAs

Carol Sanders 2 minute read 10:55 AM CDT

Manitoba’s Progressive Conservatives have chosen Konrad Narth as their interim party leader after the sudden resignation of Obby Khan.

Narth (LaVerendrye) was chosen to take the helm of the official opposition after Khan announced late Monday afternoon he was quitting caucus and will sit in the legislature as an independent MLA.

Khan resigned as leader despite winning a confidence vote Friday, saying there remained caucus members plotting to oust him.

The former Winnipeg Blue Bombers offensive lineman said there were 13 votes for him to remain and six against, with one person absent.

Read
10:55 AM CDT

Retiree sues neighbour over alleged dog attack

Scott Billeck 2 minute read 2:00 AM CDT

A Winnipeg man is suing his neighbour over an alleged dog attack he says occurred while he was helping him with a lawnmower.

Arthur Cabel, a retiree who lives on Selkirk Avenue, is seeking unspecified damages from neighbour Saisamone Saegone, according to a statement of claim filed in the Manitoba Court of King’s Bench last week.

Cabel claims he went to Saegone’s home in the afternoon on Sept. 23, 2024, to help him with his lawnmower.

According to the lawsuit, Saegone’s large dog, initially in a fenced backyard, escaped, approaching Cabel and “mauling, attacking and biting him.”

Puzzles Palace

1 minute read Monday, Jul. 27, 2026

To solve our puzzles, please subscribe with this special offer: |

Today’s horoscope

Georgia Nicols 4 minute read Preview

Today’s horoscope

Georgia Nicols 4 minute read 2:00 AM CDT

MOON ALERT: Avoid shopping (except food and gas) and important decisions after 6 p.m. The moon is in Taurus.

ARIES (March 21-April 19)

You might find you identify with your possessions more than usual. In fact, this could be why you might be tempted to be a bit extravagant or go overboard buying something. This same sense of largesse might creep into your financial negotiations. Be aware of this.

TAURUS (April 20-May 20)

Read
2:00 AM CDT

What’s open, what’s closed, what’s up in Winnipeg on National Day for Truth and Reconciliation Sept. 30, 2026

Free Press staff 4 minute read Preview

What’s open, what’s closed, what’s up in Winnipeg on National Day for Truth and Reconciliation Sept. 30, 2026

Free Press staff 4 minute read Sunday, Sep. 27, 2026

The National Day of Truth and Reconciliation, or Orange Shirt Day, as it's known in Manitoba, happens Sept. 30 with many commemorative community events scheduled.

Read
Sunday, Sep. 27, 2026

Letters, Sept. 29

7 minute read Preview

Letters, Sept. 29

7 minute read Updated: 8:18 AM CDT

I would like to commend Scott Forbes for his cogent, sensible, and well-documented article on Manitoba Hydro’s misguided, and some might say, incompetent approach to Manitoba’s hydro needs, and plans to fulfill them (Time for 21st century leadership at MB Hydro, Think Tank, Sept. 24).

Read
Updated: 8:18 AM CDT