Trump administration moves to revoke permit for Massachusetts offshore wind project

Advertisement

Advertise with us

WASHINGTON (AP) — The Trump administration has moved to block a Massachusetts offshore wind farm, its latest effort to hobble an industry and technology that President Donald Trump has attacked as “ugly” and unreliable compared to fossil fuels such as coal and natural gas.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 19/09/2025 (376 days ago), so information in it may no longer be current.

WASHINGTON (AP) — The Trump administration has moved to block a Massachusetts offshore wind farm, its latest effort to hobble an industry and technology that President Donald Trump has attacked as “ugly” and unreliable compared to fossil fuels such as coal and natural gas.

The Bureau of Ocean Energy Management, or BOEM, filed a motion in federal court Thursday seeking to take back its approval of the SouthCoast Wind project’s “construction and operations plan.” The plan is the last major federal permit the project needs before it can start putting turbines in the water.

SouthCoast Wind, to be built in federal waters about 23 miles south of Nantucket, is expected to construct as many as 141 turbines to power about 840,000 homes in Massachusetts and Rhode Island.

The Interior Department action is the latest by the Trump administration in what critics call an “all-out assault” on the wind energy industry.

Trump’s administration has stopped construction on major offshore wind farms, revoked wind energy permits and paused permitting, canceled plans to use large areas of federal waters for new offshore wind development and stopped $679 million in federal funding for a dozen offshore wind projects.

The moves are a complete reversal from the Biden administration, which approved construction of 11 large offshore wind projects to generate enough clean energy to power more than 6 million homes. The projects now face uncertain futures under Trump.

Last week, the Interior Department asked a federal judge in Baltimore to cancel a previous approval by BOEM to build an offshore wind project in Maryland. The ocean agency has concluded that its prior weighing of the project’s impacts was “deficient” and intends to reconsider that analysis to make a new decision, the department said.

Developer U.S. Wind has not yet begun construction, but plans for the Maryland Offshore Wind Project call for up to 114 turbines to power more than 718,000 homes.

BOEM had approved SouthCoast’s operations plan on Jan. 17, 2025, three days before Trump’s second term began.

“Based on its review to date, BOEM has determined that the COP approval may not have fully complied with the law” and “may have failed to account for all the impacts that the SouthCoast Wind Project may cause,” Interior said in its legal filing. The agency asked a federal judge to allow reconsideration of the project.

In a statement, developer Ocean Winds said the company “intends to vigorously defend our permits in federal court.”

“Stable permitting for American infrastructure projects should be of top concern for anyone who wants to see continued investment in the United States,” the statement said.

Jason Walsh, executive director of the BlueGreen Alliance, a coalition of labor unions and environmental groups, said Trump “is threatening good jobs while he pursues his senseless vendetta against offshore wind.”

Pulling energy project permits and canceling lease sales isn’t new. Biden revoked the permit to build the long-disputed Keystone XL oil pipeline on his first day in office, halting construction. He canceled scheduled oil and gas lease sales.

But Trump’s efforts to dismantle the offshore wind industry are much more extensive than the way Biden targeted fossil fuels, said Kristoffer Svendsen, assistant dean for energy law at the George Washington University Law School. He thinks offshore wind developers will now see the U.S. as too risky.

“They have plenty of options. They can invest in Europe and Asia. There are good markets to invest in offshore wind. It’s just the U.S. is not a good market to invest in,” he said.

The Trump administration has stopped construction on two major offshore wind farms, so far. One of them, the Empire Wind project for New York, was allowed to resume construction. The Revolution Wind project for Rhode Island and Connecticut is paused, and both the developer and the two states sued in federal courts.

The Danish energy company Orsted is building Revolution Wind. The Danish government owns a majority stake in the company.

Besides SouthCoast, the Trump administration has said it is reconsidering approvals for another wind farm off the Massachusetts coast, New England Wind. It previously revoked a permit for the Atlantic Shores project in New Jersey.

___

The Associated Press’ climate and environmental coverage receives financial support from multiple private foundations. AP is solely responsible for all content. Find AP’s standards for working with philanthropies, a list of supporters and funded coverage areas at ap.org.

Report Error Submit a Tip

More Stories

In a smart-device world, some families keep phone jacked into the wall

Sheldon Birnie 8 minute read Preview

In a smart-device world, some families keep phone jacked into the wall

Sheldon Birnie 8 minute read Yesterday at 4:20 PM CDT

When the phone rings in Kristin Shiach and Jordan Sobkowicz’s Riverview home, their three daughters race to see who can be the first to answer.

“It depends who is closest,” says 13-year-old Emily. “If I’m sitting in my room, I can get to it quickest.”

“That’s because it’s always in your room,” Anna, 10, replies. “You never put it back!”

“Usually, when the phone rings,” explains Sobkowicz, “someone yells really loudly —”

Read
Yesterday at 4:20 PM CDT

Expert urges food, drink makers to look to foreign markets

Gabrielle Piché 4 minute read Preview

Expert urges food, drink makers to look to foreign markets

Gabrielle Piché 4 minute read Yesterday at 5:04 PM CDT

Canada’s slowing population growth could restrict business expansion, a top economist for Farm Credit Canada warned Manitoba manufacturers.

Craig Johnston, the federal Crown corporation’s chief economist, addressed Prairie businesses at Farm Credit Canada’s Food and Beverage Summit Tuesday.

“There could be some modest growth in Canadian consumption of food and beverage,” Johnston said, relaying population numbers inside a Victoria Inn Hotel conference room.

Still, per-person spending on food is “stagnant, if not somewhat rising,” Johnson later told reporters.

Read
Yesterday at 5:04 PM CDT

Jets defenceman spent whole summer working on getting to the next level

Ken Wiebe 8 minute read Preview

Jets defenceman spent whole summer working on getting to the next level

Ken Wiebe 8 minute read Monday, Sep. 28, 2026

Tyrel Bauer makes no apologies for the pugilistic piece of his path.

The Winnipeg Jets defenceman is ready to drop the gloves and throw down when the situation calls for it and he takes great pride in protecting his teammates.

It’s a big part of the reason Bauer will be among the 23 players submitted by the Jets on the opening-day roster on Monday.

“I’ve fought and clawed, both metaphorically and literally and now I just want to show that I can play as well,” Bauer said during a chat with the Free Press during training camp. “(Toughness) is always something that I have, it’s always something in my back pocket and something that I take a lot of pride in doing, for my teammates, for the city and the people who invest in this hockey club. That will never change.

Read
Monday, Sep. 28, 2026

What’s open, what’s closed, what’s up in Winnipeg on National Day for Truth and Reconciliation Sept. 30, 2026

Free Press staff 4 minute read Preview

What’s open, what’s closed, what’s up in Winnipeg on National Day for Truth and Reconciliation Sept. 30, 2026

Free Press staff 4 minute read Sunday, Sep. 27, 2026

The National Day of Truth and Reconciliation, or Orange Shirt Day, as it's known in Manitoba, happens Sept. 30 with many commemorative community events scheduled.

Read
Sunday, Sep. 27, 2026

Jets pick up netminder as relatively new 23-man roster announced

Mike McIntyre 7 minute read Preview

Jets pick up netminder as relatively new 23-man roster announced

Mike McIntyre 7 minute read Monday, Sep. 28, 2026

Let’s get the caveats out of the way: Nothing is set in stone, nor written in permanent ink, and what you see right now could change in the blink of an eye.

With that being said, allow us to introduce you to the 2026-27 Winnipeg Jets — where change is very much in the air.

The 23-man roster submitted to the NHL offices by Monday’s 4 p.m. deadline includes seven players who were not on the team at this time last year. In fact, there could be as many as 10 new faces in the opening-night lineup on Friday against Boston when you factor in three regulars didn’t start the 2025-26 campaign due to injury.

That’s a lot of turnover, which isn’t surprising for a team that finished 26th overall in the standings and was — to most fans and pundits — too old and too slow.

Read
Monday, Sep. 28, 2026

Orange Shirt Day project fits students to a tee

Maggie Macintosh 5 minute read Preview

Orange Shirt Day project fits students to a tee

Maggie Macintosh 5 minute read Monday, Sep. 28, 2026

On the eve of Orange Shirt Day, hundreds of black T-shirts will be handed out to teenagers at Elmwood High School — and there wasn’t a mixup in the clothing procurement process.

The student-run business behind the initiative wanted to make a statement about “truth and reconciliation” being a year-round activity, said Daniel Concepcion, a Grade 12 student.

Daniel said given that black is a staple in the wardrobe of teenagers, he hopes these shirts won’t sit on hangers for 364 days of the year.

“Every child matters, every part of the day, every day,” the 17-year-old said.

Read
Monday, Sep. 28, 2026