Infrastructure officials detail Ontario Science Centre structural issues

Advertisement

Advertise with us

TORONTO - The Ontario Science Centre building is facing critical issues not just with its roof, but with heating, sprinkler and electrical systems, officials said Thursday – but they did not say what they plan to do about it, if anything.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 11/07/2024 (785 days ago), so information in it may no longer be current.

TORONTO – The Ontario Science Centre building is facing critical issues not just with its roof, but with heating, sprinkler and electrical systems, officials said Thursday – but they did not say what they plan to do about it, if anything.

The focus right now, following the abrupt closure of the facility in northeast Toronto last month, is on doing more investigative work and moving all exhibits and staff out of the building before the winter, when the possibility of snow on the roof creates an additional risk, Infrastructure Minister Kinga Surma said at a news conference.

“Our priority is to decommission the building safely right now, work on an interim location for science centre programming and then of course, focus our energies on a new science centre,” Surma said.

Ontario infrastructure officials are further justifying their decision to close the Ontario Science Centre by releasing more details today on the issues with the building beyond its roof. A general view of the Ontario Science Centre is shown in Toronto, Friday, May 5, 2023. THE CANADIAN PRESS/Chris Young
Ontario infrastructure officials are further justifying their decision to close the Ontario Science Centre by releasing more details today on the issues with the building beyond its roof. A general view of the Ontario Science Centre is shown in Toronto, Friday, May 5, 2023. THE CANADIAN PRESS/Chris Young

But beyond that, Surma did not indicate if any of the identified issues will be repaired, or if the building will be demolished or abandoned, saying what happens with the building will be the subject of discussions with the City of Toronto, which along with its conservation authority has leased the land to the province to operate the science centre.

The government was already planning to relocate the science centre to the redeveloped waterfront Ontario Place attraction, but that new facility is not slated to open until 2028.

Infrastructure Ontario president and CEO Michael Lindsay said the time has come for questions to be asked about the original 55-year-old science centre building.

“When buildings reach the end of life, 50 or 60 years … things begin to fail and more fundamental lifecycle replacement projects are needed – the bridge, the roof, the central mechanical system, boilers and chillers,” he said.

“So now would be the time for any asset that is this age to think about what the future ultimately would be, and whether those investments are going to be made.”

Workers inside the science centre, in the process of compiling an inventory and taking down audio-visual equipment, have not been told much, said Martin Fischer, the president of Local 549 of the Ontario Public Service Employees Union that represents about 500 science centre workers.

“There is a general feeling of everything is up in the air,” said Fischer, who works in the education department of the science centre.

The workers have not been given any assurances about their jobs over the medium or long-term, Fischer said.

Surma has said that the science centre had to abruptly close last month because of structural issues with the roof, but there has been widespread criticism of the decision to shut it down rather than address those problems while keeping parts of it open.

The government released a peer review Thursday of the original engineering report on which the province and the science centre board based the closure decision. The peer review concluded that the evaluation of risk in the original report was reasonable.

“The recommendations made to mitigate these risks through immediate remediation of critical and high-risk panels and their eventual replacement – to coincide with a roofing assembly replacement – are appropriate to safely extend the useful lifespan of the building structure,” the new report said.

But Surma and infrastructure officials said Thursday that remediation wouldn’t be quick or straightforward, and the condition of all the other aspects of the building must be considered when contemplating extending its lifespan.

“We cannot rehabilitate this asset unless the entire buildings are vacant,” said Jane Domenico, president of asset and modernization at Infrastructure Ontario.

“There’s no spot repair that will be sufficient or safe.”

Roof work could disrupt asbestos, so it would need to be contained, officials said.

For all the other work, the three buildings that make up the science centre have connected systems. The building out front is the centre for all mechanical systems, with the services for the building housing the great hall – such as heating pipes –running through a pedestrian bridge that was closed in 2022 due to safety concerns.

No repairs have been done on the bridge since it was closed two years ago, necessitating a shuttle service to take visitors to the rear entrance, and officials said the mechanical channel inside it is currently not accessible.

The heating pipe in that channel has broken, cutting off heat to the great hall building, and officials said if that is not fixed before the onset of winter it brings fire safety risks due to frozen pipes.

Additionally, Domenico said the windows have lost their structural integrity. The building’s location in a ravine would also make major construction work difficult, she said.

This report by The Canadian Press was first published July 11, 2024.

Report Error Submit a Tip

More Stories

Manitoba selects consulting firm Nueconomy as India trade rep

Gabrielle Piché 3 minute read 6:00 AM CDT

The Manitoba government has hired an India-based consulting firm to act as its new trade representative in the South Asia nation.

It will announce its choice of strategic consulting firm Nueconomy today.

The company — with offices in Delhi, Mumbai and Bangalore — has already begun working with the province. One of its directors attended Fi India, a food ingredients event, last week to promote Manitoba crops such as pulses, according to a company LinkedIn post.

Representatives from Nueconomy weren’t available for comment by print deadline Thursday.

Canada’s first drive-thru-only McDonald’s opens in Winnipeg

Aaron Epp 4 minute read Preview

Canada’s first drive-thru-only McDonald’s opens in Winnipeg

Aaron Epp 4 minute read Wednesday, Sep. 2, 2026

One Grimace and dozens of smiles were on display Wednesday as McDonald’s staff and supporters celebrated the grand opening of the fast-food chain’s first drive-thru-only restaurant in Canada.

Read
Wednesday, Sep. 2, 2026

Frequency of private plasma donations called into question

Marsha McLeod and Rylee Gerrard 9 minute read Preview

Frequency of private plasma donations called into question

Marsha McLeod and Rylee Gerrard 9 minute read 12:47 PM CDT

Two weeks after the death of a second plasma donor in Winnipeg at a privately run collection site, provincial and territorial health officials compiled a list of urgent questions for Health Canada.

A health department official in Nova Scotia, which leads the Provincial Territorial Blood Liaison Committee, wrote in mid-February to the federal regulator that their members had expressed “a great deal of curiosity tempered with concern” and forwarded two dozen questions, according to documents obtained by the Free Press.

Under a section titled “MANITOBA ESTABLISHMENT INCIDENTS,” the provinces wanted to know: “What requirements are in place to ensure Grifols is ensuring collections frequency (does) not exceed the limit under the Health Canada licence?” and “Is Health Canada able to identify whether Grifols Canada has a donor system across establishments? (e.g., can identify when a donor last donated and where, similar to their operations in the United States).”

“Does the situation of two high-severity incidents in one Province or at establishments run by a relatively new entity to Canada, within a short period of time, initiate any additional protocols?”

Read
12:47 PM CDT

Westwood standoff ends with two arrested

Morgan Modjeski and Erik Pindera 3 minute read Preview

Westwood standoff ends with two arrested

Morgan Modjeski and Erik Pindera 3 minute read Updated: Yesterday at 6:29 PM CDT

An hours-long standoff in Westwood came to an end Thursday with Winnipeg police arresting two men and seizing a gun.

Winnipeg Police Service officers were called to Byrd Avenue shortly before 9:30 a.m. after a man was seen walking with what appeared to be a firearm, said police spokesman Const. Claude Chancy.

Officers identified a home connected to the investigation, he said.

Two men were arrested but Chancy could not yet say what they will be charged with. It’s not clear whether either of the men arrested was the male spotted with a gun.

Read
Updated: Yesterday at 6:29 PM CDT

Twenty-six people detained at detox centre since March

Carol Sanders 3 minute read Preview

Twenty-six people detained at detox centre since March

Carol Sanders 3 minute read 2:07 PM CDT

The new facility designed to detain people in a drug psychosis for up to 72 hours “is doing what it’s meant to do” — even though just 26 people were held for that purpose since it opened.

“The PCC (protective care centre) is doing what it’s meant to do — support people, meet them where they’re at, provide a caring environment,” Housing Addictions and Homelessness Minister Bernadette Smith told reporters Friday after updated data were posted online.

The vast majority of those detained at the 20-room facility at 190 Disraeli Fwy. were recovering from alcohol intoxication, the update shows.

There were 4,425 detained from the time the site opened Dec. 2 until June 30, for an average of less than five hours.

Read
2:07 PM CDT

Comic creator unleashes talent with book bound for festival

Sheldon Birnie 6 minute read Preview

Comic creator unleashes talent with book bound for festival

Sheldon Birnie 6 minute read 2:00 AM CDT

For Glenn Hares, comic books — specifically, superhero comics — have always been a refuge, a way to both understand and escape the world.

Now, he’s prepared to release his own into the world.

“When I was in high school, I started creating characters, like this guy here,” says Hares, 40, showing a reporter a copy of the self-published Tytanium No. 0.

“Originally, he was just named Jerry Wolfe. Recently, my aunt suggested I make him neurodivergent because I based him on myself. A lot of superheroes have extraordinary, fantastic, out-of-the-ordinary powers, but they’re also just people. They live imperfect lives.”

Read
2:00 AM CDT