Army to spend $2B to build nuclear microreactors at 5 bases as US seeks to ramp up nuclear power

Advertisement

Advertise with us

WASHINGTON (AP) — The U.S. Army announced Wednesday that it plans to add nuclear microreactors at five military bases from New York to Texas as a reliable source of energy independent of the commercial electric grid.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

WASHINGTON (AP) — The U.S. Army announced Wednesday that it plans to add nuclear microreactors at five military bases from New York to Texas as a reliable source of energy independent of the commercial electric grid.

The announcement comes as the Trump administration pushes hard to develop the next generation of nuclear power, including billions in loans for large nuclear reactors to meet skyrocketing power demand from data centers and a pilot program to boost advanced reactor designs and projects for military and civilian use. No nuclear microreactors are supplying power to the commercial electric grid in the United States today.

Five companies selected by the Army will be awarded up to $2.2 billion in total over five years to own, construct and operate the microreactors, if they hit set milestones along the way for their performance. The Army expects that more than 20 nuclear microreactors will be built and operated.

FILE - A sign at Fort Bragg, N.C., is seen, Jan. 4, 2020. (AP Photo/Chris Seward, File)
FILE - A sign at Fort Bragg, N.C., is seen, Jan. 4, 2020. (AP Photo/Chris Seward, File)

Army and industry officials say microreactors offer a resilient power source for critical infrastructure at military installations in case the grid fails. Reactors can run for years without refueling.

Army Secretary Dan Driscoll said the awards will accelerate the military’s ability “to deliver safe, reliable baseload power directly to our installations. We are building the energy resilience necessary to project combat power globally, without relying on potentially vulnerable external grids,” he said.

The grants are part of the Army’s “Janus Program” launched last year to deliver next-generation nuclear energy. Officials hope to push nuclear development forward so that advanced reactor designs move beyond experiments and prototypes to provide power for years to come. This will be the “spear tip,” said Jeff Waksman, principal deputy assistant secretary of the Army for installations, energy and environment.

“That is the transition that we are trying to effect here,” he said on a call with reporters Wednesday. “These are not meant to be Army-specific designs.”

Critics of building more nuclear reactors say they’re too expensive and riskier than other energy sources. Waksman said these reactors will shut down safely in case of a failure, they’re small and the Army wouldn’t add them to installations without being certain they are safe. He said the Army is working on a deal with the Energy Department to remove radioactive waste, and there won’t be any long-term storage on these installations.

Army leads the military’s adoption of nuclear energy

President Donald Trump signed executive orders in May 2025 to speed up the development of nuclear power. The Army was tasked with ensuring that an advanced reactor would start operating at a domestic military installation no later than Sept. 30, 2028. The Janus program is named for the ancient Roman god of transitions.

Officials know that delivering nuclear power to a military base will be a challenge, so they picked five companies in case one or more fail, Waksman said. The selected companies are: Antares Nuclear at Fort Bragg in North Carolina; BWXT at Fort Campbell in Kentucky; General Atomics Electromagnetic Systems at Fort Hood in Texas; Radiant Industries at Fort Benning in Georgia; and Westinghouse Government Services at Fort Drum in New York.

Senate Minority Leader Chuck Schumer asked the Army to select Fort Drum. The critical missions Fort Drum supports require secure, reliable and resilient power generation, the New York Democrat said.

The reactors will be licensed by the Army, rather than the U.S. Nuclear Regulatory Commission, which licenses commercial nuclear reactors. The Army is working to align its regulatory processes as much as possible, Waksman said, so that companies won’t need major changes to their designs to be later licensed by the NRC. Along with federal funding, the Army expects billions of dollars in private capital investment.

The military installations will remain connected to the grid. The reactors would not completely power them. Each reactor will provide between 1 megawatt to 20 megawatts of power, depending on the company’s design. Major bases use as much power as a small city. Antares and Radiant are planning to deliver their reactors in three-packs, Waksman said.

The Army now uses diesel as a primary backup for critical infrastructure. But in a conflict, Waksman said, the Army may not be able to move fossil fuels easily wherever it needs them.

“That makes nuclear energy just a natural game changer,” he said. “It makes sense for the Army to take the lead here.”

A reactor at Fort Belvoir in Virginia, completed in 1957, was the first nuclear power reactor to provide electricity to a commercial power grid in the United States for an extended period, according to the U.S. Army Corps of Engineers.

Companies say this will accelerate US nuclear development

California-based Antares reached a crucial milestone under the U.S. pilot program that could allow it to produce electricity within a few years. The company said the Army’s announcement extends its momentum. Westinghouse Government Services said it’s proud to support the Army’s efforts to strengthen energy security and innovate.

Tori Shivanandan, president and chief operating officer of California-based Radiant, said the Army’s $750 million award “shows confidence in Radiant’s product and ability to manufacture, deploy and safely operate nuclear microreactors for the American military.” The Janus program “will build a stronger and more resilient America,” she said.

General Atomics Electromagnetic Systems said its reactor is designed to operate in remote, off-grid and extreme environments for 40 years. It said it will draw on more than 70 years of nuclear expertise to provide safe, dependable and independent power for the military.

Rex Geveden, BWXT’s president and chief executive officer, said, “As we commence work on the Janus program, we are delivering the nation’s most credible and reliable path to deployable nuclear power.”

___

McDermott reported from Providence, R.I.

___

The Associated Press’ climate and environmental coverage receives financial support from multiple private foundations. AP is solely responsible for all content. Find AP’s standards for working with philanthropies, a list of supporters and funded coverage areas at AP.org.

Report Error Submit a Tip

More Stories

Bombers give would-be boo birds their marching orders

Taylor Allen 3 minute read Preview

Bombers give would-be boo birds their marching orders

Taylor Allen 3 minute read Yesterday at 7:08 PM CDT

The Winnipeg Blue Bombers are being criticized by some fans online for booking the University of North Dakota’s marching band for Friday’s game against Montreal.

Read
Yesterday at 7:08 PM CDT

‘I’m proud of our country right now’: Kinew on Canada’s counter-tariffs

Gabrielle Piche 2 minute read Preview

‘I’m proud of our country right now’: Kinew on Canada’s counter-tariffs

Gabrielle Piche 2 minute read Yesterday at 3:45 PM CDT

Canada is showing the rest of the world you “don’t have to take a knee” to the United States, Premier Wab Kinew said Tuesday.

Read
Yesterday at 3:45 PM CDT

Security guard, 22, stabbed by shoplifter at Dollarama store

Malak Abas 4 minute read Preview

Security guard, 22, stabbed by shoplifter at Dollarama store

Malak Abas 4 minute read 2:44 PM CDT

A security guard was stabbed as he tried to stop a shoplifter at a Dollarama store in Winnipeg Tuesday, the latest in a string of violent incidents at the discount chain.

Winnipeg police were called to the outlet in the Courts of St. James, at 2727 Portage Ave., around 4 p.m.

Police said the guard, who is employed by Impact Security, had confronted a man suspected of shoplifting and directed him to leave the store. The suspect pulled out a sharp-edged weapon and stabbed the guard in the upper body before fleeing with stolen merchandise.

The guard, 22, was seriously injured and was taken to hospital in unstable condition. He was later upgraded to stable condition.

Read
2:44 PM CDT

Tough to stomach date’s lack of compassion

Maureen Scurfield 5 minute read Yesterday at 2:00 AM CDT

DEAR MISS LONELYHEARTS: I had dinner with my new guy at a fancy restaurant — his treat — and ate something that didn’t agree with me. I ended up in the restaurant bathroom, throwing the expensive dinner up. My date was actually vulgar about it — not sympathetic or taking things with a sense of humour at all.

He was so disgusted he called a taxi to take me home so I wouldn’t end up throwing up in his precious car. I cancelled the taxi and called my family, and my father and brother came right away. They wanted to wring his neck!

I’d never have reacted so cruelly if my date had gotten sick at a restaurant.

This guy has since called to see if I’m “back to normal.” He casually asked if I wanted to give it another try. I just didn’t have the desire to talk with him anymore, so I hung up. Is this my problem? Am I “over-reacting” as he has told other people I know?

Smart Suite lets families of children with disabilities learn how adaptive design, tech can improve their lives

Sheldon Birnie 4 minute read Preview

Smart Suite lets families of children with disabilities learn how adaptive design, tech can improve their lives

Sheldon Birnie 4 minute read 3:35 PM CDT

The first thing Zoe Versteeg did after rolling into the living room was to change the hue-lighting colour to match the shade of her lavender glasses. The smile that spread across her face was nearly as bright as the lights in the room.

“It’s just joy, immediate joy when she sees something happening. She’s like, ‘I control that, I got to do that,’” Elsien Versteeg, Zoe’s mother, said. “Her being able to make those decisions on her own, she can just do it herself now.”

Zoe, who is 13 and non-verbal, uses eye-gaze technology to communicate and control both her wheelchair and an array of smart devices. Versteeg and Zoe were at the official opening of the Rehabilitation Centre for Children’s new Smart Suite on Aug. 26, where the team behind the project was demonstrating the breadth of adaptive design and technologies available locally for families of children with disabilities to provide them with greater independence.

The Versteegs use many of the devices in their own home near New Bothwell.

Read
3:35 PM CDT

Army to spend $2B to build nuclear microreactors at 5 bases as US seeks to ramp up nuclear power

Jennifer Mcdermott And Matthew Daly, The Associated Press 6 minute read Preview

Army to spend $2B to build nuclear microreactors at 5 bases as US seeks to ramp up nuclear power

Jennifer Mcdermott And Matthew Daly, The Associated Press 6 minute read Updated: 4:21 PM CDT

WASHINGTON (AP) — The U.S. Army announced Wednesday that it plans to add nuclear microreactors at five military bases from New York to Texas as a reliable source of energy independent of the commercial electric grid.

The announcement comes as the Trump administration pushes hard to develop the next generation of nuclear power, including billions in loans for large nuclear reactors to meet skyrocketing power demand from data centers and a pilot program to boost advanced reactor designs and projects for military and civilian use. No nuclear microreactors are supplying power to the commercial electric grid in the United States today.

Five companies selected by the Army will be awarded up to $2.2 billion in total over five years to own, construct and operate the microreactors, if they hit set milestones along the way for their performance. The Army expects that more than 20 nuclear microreactors will be built and operated.

Army and industry officials say microreactors offer a resilient power source for critical infrastructure at military installations in case the grid fails. Reactors can run for years without refueling.

Read
Updated: 4:21 PM CDT