WEATHER ALERT

Livable efficiency

Manitoba Hydro Place isn’t just kind to the utility’s energy bill, it’s also comfortable for the people who work there

Advertisement

Advertise with us

This Earth Month, a lot of us are thinking about the buildings where we live and work and how they can be made more sustainable and energy efficient.

Read this article for free:

or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 25/04/2022 (1539 days ago), so information in it may no longer be current.

This Earth Month, a lot of us are thinking about the buildings where we live and work and how they can be made more sustainable and energy efficient.

As our province’s electrical power and natural gas provider, Manitoba Hydro thinks about these things a lot, so when it came time to construct its new downtown headquarters on Portage Ave., the provincial Crown corporation looked to innovative green building approaches, as well as a new way of thinking about the collaborative connections between architectural vision and engineering function.

Designed by Toronto-based Kuwabara Payne McKenna Blumberg Architects (KPMB), Manitoba Hydro Place is a 690,000 square-foot, 22-storey office tower that opened in 2009. The original mandate for this award-winning structure was driven not just by the need to make its construction and operation more environmentally friendly, but also by the desire to create a space for its employees that was functional, comfortable, healthy and, yes, beautiful.

The Manitoba Hydro building on Portage Avenue is not just environmentally friendly, it is a functional, comfortable, healthy and beautiful space. (Mikaela MacKenzie / Winnipeg Free Press files)
The Manitoba Hydro building on Portage Avenue is not just environmentally friendly, it is a functional, comfortable, healthy and beautiful space. (Mikaela MacKenzie / Winnipeg Free Press files)

“It was the first large scale office tower in Canada to achieve Platinum LEED certification,” says engineer Mark Pauls. (LEED — Leadership in Energy and Environmental Design — is a green-building rating program used worldwide.) This achievement is even more remarkable when you consider the challenge of building an energy-efficient structure in our extreme climate. “We get the worst of everything,” Pauls remarks cheerfully. “We get the coldest winters and hot summers.”

Along with that whopping 70-degree temperature range, we also get lots of sunlight hours and strong southerly winds that can help with heating, cooling and ventilation. With Hydro Place, the trick was to work with our climate instead of against it.

Energy efficiency isn’t everything, though. Pauls, who has a master’s degree in Climate Engineering, was the Commissioning Engineer during the design and building process and is now the Building Energy Management Engineer at Manitoba Hydro. “Energy is one very significant part of the LEED rating system,” he explains. “You get a lot of points for an energy-efficient building, but that’s not enough for Platinum certification. To get that you have to look at a holistic view of sustainability.

“A big piece of the LEED sustainability rating system is user comfort,” he states. “That was critical for the project as well. You get big points for having great thermal control — it’s not too hot, it’s not too cold. You get big points for air quality — and that’s been super-critical in the last couple of years.

“We build buildings for human occupancy,” Pauls points out. “The most energy-efficient building would be a sealed windowless box.” But who would want to work there?

Architect Bruce Kuwabara, from Kuwabara Payne McKenna Blumberg Architects, unveils the plans for the Manitoba Hydro building in 2005. (Joe Bryksa / Winnipeg Free Press files)
Architect Bruce Kuwabara, from Kuwabara Payne McKenna Blumberg Architects, unveils the plans for the Manitoba Hydro building in 2005. (Joe Bryksa / Winnipeg Free Press files)

During the design process, KPMB partnered with local firm Smith Carter Architects & Engineers (now part of Architecture49), as well as a multidisciplinary battalion of engineers and specialists. The KPMB architects worked with the team right from the get-go to integrate the overall design with the functionality needed to meet Hydro’s ambitious green building program.

“The collaborative process was really important to achieving the end goal with Manitoba Hydro Place,” Pauls believes.

Office buildings of some kind have been around since Roman times. The modern office tower has roots in the form-follows-function architectural developments of the late 19th-century, which later transformed into the 20th-century corporate skyscraper. For decades, office design focused on efficiency and productivity, trending towards cramped rabbit warrens of cubicles or big open floors with grids of desks where employees worked away, hoping to one day to rise through the company hierarchy and maybe get a nice office with a door and a view.

Recently, more attention has been given to the ways design can improve employee satisfaction, by sparking creativity, encouraging connection and collaboration, decreasing stress and enhancing physical and emotional well-being.

At Manitoba Hydro Place, for example, the double glass facade lets light pour in. Managed by a sensitive biodynamic system, this structural envelope decreases heating costs in winter and cooling costs in summer. But natural sunlight is also a big energy booster for employees, especially compared to flickering overhead fluorescent lights.

The windows on the east side of the modern office building open in the spring. (Ken Gigliotti / Winnipeg Free Press files)
The windows on the east side of the modern office building open in the spring. (Ken Gigliotti / Winnipeg Free Press files)

The building’s six-story “waterfall” also epitomizes what Pauls calls the “harmonization of architectural and engineering intent.” This curtain of water humidifies the air in the winter and dehumidifies it in the summer. It’s also soothing and beautiful to listen to and look at.

In contrast to so many tightly sealed office buildings, Hydro Place’s design brings in a continuous supply of fresh air, something that’s become even more important with the pandemic. “At Manitoba Hydro Place, we have no recirculation of air,” Pauls says. “It’s one path of air flow — it comes in, it gets inhaled, exhaled and then shot out the north end of the building.”

Even a simple thing such as windows that actually open can have a big effect on a building’s users. “One of the most powerful engineering psychological principles when it comes to buildings is the ‘forgiveness factor,’” explains Pauls. Most office buildings don’t give occupants any influence over their environment.

“They don’t have a thermostat to adjust, a fan to turn on, a heater to turn on or off. You just say, ‘Nope, we’re going to take care of it. We’re going to give settings that are right for you.’

“And, of course, people are all different. They have different preferences. If you have standard set of comfort conditions, you’ll have 20 to 30 per cent of people who will be uncomfortable. The forgiveness factor gives occupants the means to adjust. In Hydro Place, they can adjust the airflow for their vent, they can open and close windows, open and close blinds.

The 22-story building features Platinum LEED certification, geothermal heating and cooling, 
a passive ventilation system, a winter garden, solar chimney, and water garden. (Ken Gigliotti / Winnipeg Free Press files)
The 22-story building features Platinum LEED certification, geothermal heating and cooling, a passive ventilation system, a winter garden, solar chimney, and water garden. (Ken Gigliotti / Winnipeg Free Press files)

“People will feel more comfortable if they have more autonomy.”

The other really crucial thing, for Pauls, is the ability to connect to the natural environment, through the building’s indoor “wintergardens” and its rooftop terraces. An Indigenous employee group has started to grow the “Three Sisters” – corn, beans and squash — along with sweetgrass, sage and other ceremonial plants on one of the rooftop gardens. “It adds an interesting programmatic element to the building,” Pauls suggests. These natural elements do reduce energy costs, “but it’s not just about energy sustainability. It’s also more about human, cultural sustainability.”

Pauls has also been interested in watching the ways Hydro Place interacts with its urban environment. “The other thing that jumps out, that I personally find very rewarding, is just how the building’s downtown location has supported a change in many employees’ mindset for commuting,” he says. Back when the Hydro headquarters was on Taylor Ave., “we used to have about 95 per cent of staff drive themselves to work. Now 50 or 60 per cent are taking the bus to work. Last summer we would have 200 or 300 cyclists.” (Hydro Place has showers and lockers to support active-transport commuting.)

“From a sustainability perspective, if you’re looking at carbon emissions, the building is one thing,” Pauls goes on. “But that pales in comparison with the functional energy use of the building over 60 years. What often gets ignored is the circle around the building. The biggest impact we have in North America is the energy and the carbon emissions used to get to the building.

“If you have 2,000 employees and you plunk your building in the suburbs somewhere, and every day those employees are travelling an average of 10 kilometres in a single-person vehicle, that will very quickly overwhelm anything you do with the building itself.”

Construction of Manitoba Hydro Place began in 2008. (Ken Gigliotti / Winnipeg Free Press files)
Construction of Manitoba Hydro Place began in 2008. (Ken Gigliotti / Winnipeg Free Press files)

Thinking about how everything works together is one of the ways Hydro Place has achieved its goals for sustainability, actually exceeding its initial target of a 60 per cent reduction in energy consumption compared to the standard Canadian Model National Energy Code for Buildings. “One of the themes about the Hydro Place project is that it’s a system. It’s not a collection of disconnected parts,” says Pauls.

Remembering that everything is connected, that we’re all connected, is a great way to mark Earth Month.

alison.gillmor@freepress.mb.ca

The waterfall, a six-foot curtain of water  in the building’s lobby, humidifies the air in the winter and dehumidifies it in the summer. (Trevor Hagan / Winnipeg Free Press files)
The waterfall, a six-foot curtain of water in the building’s lobby, humidifies the air in the winter and dehumidifies it in the summer. (Trevor Hagan / Winnipeg Free Press files)
Hydro Place has exceeded its target of a 60 per cent reduction in energy consumption. (Boris Minkevich / Winnipeg Free Press files)
Hydro Place has exceeded its target of a 60 per cent reduction in energy consumption. (Boris Minkevich / Winnipeg Free Press files)
Alison Gillmor

Alison Gillmor
Writer

Studying at the University of Winnipeg and later Toronto’s York University, Alison Gillmor planned to become an art historian. She ended up catching the journalism bug when she started as visual arts reviewer at the Winnipeg Free Press in 1992.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

Report Error Submit a Tip

More Stories

‘Very quiet around here’: Duck Mountain biz owners plead for assistance after flooding washes out park

Morgan Modjeski 5 minute read Preview

‘Very quiet around here’: Duck Mountain biz owners plead for assistance after flooding washes out park

Morgan Modjeski 5 minute read Updated: Yesterday at 6:38 PM CDT

Business owners at Duck Mountain Provincial Park who have lost thousands in revenue say they’re feeling left out of flood-recovery assistance in the Parkland region.

Dawn Dowsett, owner of Blue Lake Resort, said life has been chaotic since the park closed on June 30 due to road washouts.

While there is limited access to the park, with some seasonal campers and cabin owners returning, it’s listed as closed on the Government of Manitoba’s website, with no nightly camping available until July 23.

She says the resort, which includes a restaurant and store, is missing out on part of the summer, a peak time for the business.

Read
Updated: Yesterday at 6:38 PM CDT

Rage politics meets its serious counterpart

David McLaughlin 5 minute read Preview

Rage politics meets its serious counterpart

David McLaughlin 5 minute read Yesterday at 2:02 AM CDT

Serious times call for serious politics. That means serious leaders offering serious solutions.

If all this sounds like a campaign slogan for the establishment, you’re probably right. But its rising resonance may well prove the unravelling of the conservative populist rage that has been driving politics in Canada, the United States and Europe.

Already we are seeing signs that the “burn it all down” rhetoric of more than a decade of MAGA Trump in the United States, Brexit and Faragism in the United Kingdom, and the angry and anti- establishment brand of Poilievre conservatism in Canada, has crested. Today, voters are yearning for stability and real solutions, the exact opposite of what divisive populist politics promise.

Events, current and past, rightly fuelled the anger. The 2008 financial crisis marked the beginning of our current “end times.” It was followed in short order by the first triumph of Donald Trump’s Make America Great Again movement in 2016, Brexit in Britain in 2016, the COVID-19 pandemic in 2020, Russia’s invasion of Ukraine in 2022, the Oct. 7, 2023, Hamas atrocities in Israel and that country’s two-year invasion and war in Gaza, and the triumphant return of Trump and MAGA in 2024. Now comes the ongoing war with Iran launched by the U.S. and Israel.

Read
Yesterday at 2:02 AM CDT

Returner Vaval, QB Brown lead Bombers past Argos in season’s most complete effort

Taylor Allen 7 minute read Preview

Returner Vaval, QB Brown lead Bombers past Argos in season’s most complete effort

Taylor Allen 7 minute read Updated: Yesterday at 8:21 AM CDT

It was the loudest Princess Auto Stadium has been all season.

Moments after fumbling a fourth quarter punt that put the Toronto Argonauts in scoring range, Winnipeg Blue Bombers returner Trey Vaval bounced back in a big way.

Argos kicker Lirim Hajrullahu misfired on a 40-yard field goal with nine minutes remaining and Vaval made the visitors pay by racing 129 yards to the opposite end zone to boost the home side’s lead to 29-14.

Vaval, who had four return touchdowns in his sensational rookie campaign last year, entered the contest ranked first in the CFL in punt-return yards and second on kickoffs — the only thing he was missing was his first score.

Read
Updated: Yesterday at 8:21 AM CDT

Banned drunk driver in crash charged with getting behind wheel again

Erik Pindera 3 minute read Preview

Banned drunk driver in crash charged with getting behind wheel again

Erik Pindera 3 minute read Yesterday at 2:02 AM CDT

A Winnipeg man who served time for drunkenly slamming a minivan into an off-duty police officer riding a motorcycle in 2023 is accused of getting behind the wheel, despite court orders.

Braedon Lee Gordon, 25, is charged with one count of driving while prohibited for an incident on March 2. His next court date is later this month.

Dan Léveillé, a veteran Winnipeg Police Service constable who was left with life-altering injuries in the June 14, 2023, collision, said he was not surprised to learn of the new charge.

“This is just another one of those stories, where a habitual, repeat offender is charged for the same offence. After having served time, his behaviour continues,” said Léveillé.

Read
Yesterday at 2:02 AM CDT

Letters,

7 minute read 2:00 AM CDT

Multiple approaches required downtown

Re: Frustration, not fear, swells in Exchange after drug crackdown (July 9)

The recent coverage of Winnipeg’s drug crisis makes it sound as though compassion and public safety are somehow opposites. They are not.

One business owner said she was “absolutely enraged” by the police response and insisted, “This is not an unsafe situation” because she was not personally seeing violence.

Ottawa mum on joining legal case against Trump’s sanctioning of Canadian ICC judge

Dylan Robertson, The Canadian Press 4 minute read Preview

Ottawa mum on joining legal case against Trump’s sanctioning of Canadian ICC judge

Dylan Robertson, The Canadian Press 4 minute read Updated: Yesterday at 9:54 AM CDT

OTTAWA - Ottawa won't say whether it will intervene in support of a Winnipeg-born global judge who is asking a U.S. court to reverse sanctions ordered by U.S. President Donald Trump, which have left her unable to use a credit card or most major online vendors.

Washington sanctioned International Criminal Court judge Kimberly Prost nearly a year ago, over her work on a case involving American troops in Afghanistan. Unlike France, Canada has never criticized that decision.

"We haven't said anything about that," said Sabine Nolke, a former senior Canadian diplomat whose career focused on international law.

"We do have fairly solid human rights credentials, but we can certainly stand (to be) speaking out more about them."

Read
Updated: Yesterday at 9:54 AM CDT