City seeks answers on long-delayed Upper Fort Garry interpretive centre promised for donated land

A city councillor is calling for the seizure of downtown property donated for an interpretive centre near Upper Fort Garry that has failed to materialize 15 years later.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 26/02/2024 (921 days ago), so information in it may no longer be current.

A city councillor is calling for the seizure of downtown property donated for an interpretive centre near Upper Fort Garry that has failed to materialize 15 years later.

Meanwhile, the group that promised to transform the surface lot at Assiniboine Avenue and Fort Street in 2009 continues to collect parking proceeds — about $100,000 annually as of 2020 — from the property adjacent to the historic site.

When the city made the donation to The Friends of Upper Fort Garry, the expectation was that the interpretive centre at the site — a provincial park on the banks of the Assiniboine River — would be built within five years.

The building at 100 Main St. was demolished in 2009 to make way for the interpretive centre and heritage park. (Mike Deal / Free Press files)
The building at 100 Main St. was demolished in 2009 to make way for the interpretive centre and heritage park. (Mike Deal / Free Press files)

If the project wasn’t completed, the initial agreement would allow the city to take the land back.

In 2015, a city council committee voted to allow the group to continue running the lot, despite a stated goal to remove downtown surface lots. An extension was granted in 2017, which expired in September 2019.

In early March 2020, the group asked for another extension, noting the lot’s revenue was essential to pay for park operations and fundraising to complete the interpretive centre.

“It is critical for the continued operation and continued activity of the park,” Penny McMillan, then-director of the Friends of Upper Fort Garry, said at the time.

The status of the interpretive centre isn’t clear. McMillan declined comment Monday, stating she’s no longer the group’s spokesperson and the current one was not available to speak with the Free Press.

Questions are being raised about a proposal to turn a surface parking lot alongside Upper Fort Garry provincial park into an interpretive centre. (Mike Deal / Free Press)
Questions are being raised about a proposal to turn a surface parking lot alongside Upper Fort Garry provincial park into an interpretive centre. (Mike Deal / Free Press)

The project has now been delayed for so long, it’s time the city consider taking steps to get the land back, if it still can, Coun. Brian Mayes said Monday.

“Deadlines should matter at some point, so I think it’s time to take the land back and figure out a use for it because that was the plan back in 2009,” said Mayes (St. Vital).

“Enough with the extensions.”

As of 2017, the project was slated to include a $17-million, 40,000-square-foot interpretive centre that would be built by 2021, including a meeting space and underground parking. At the time, the centre was expected to earn enough revenue that it would make the entire park self-sustaining.

Coun. Brian Mayes said he’s left wondering if it’s not time for the city to take back the land because the development hasn’t occurred. (Mike Deal / Free Press files)
Coun. Brian Mayes said he’s left wondering if it’s not time for the city to take back the land because the development hasn’t occurred. (Mike Deal / Free Press files)

The Friends of Upper Fort Garry did not offer an updated price estimate or target completion date for the interpretive centre in 2020.

“Having voted for these (parking lot) extensions, you’d like to know where we are now and where (we are) going,” said Mayes. “I don’t want to come across as critical of the people who volunteered their time… but after 15 years, let’s move on.”

Coun. Sherri Rollins, chairwoman of council’s property and development committee, said the city is seeking an update on the project.

“Extensions aren’t unheard of.… Right now, we’re hoping someone would reach out and tell us what’s what (in terms) of where the status of this people-powered group is at,” said Rollins (Fort Rouge-East Fort Garry).

On Feb. 21, city property and development officials sent a letter to the Friends of Upper Fort Garry, noting the expired status of city clearances required to operate the parking lot, giving the group 30 days to respond, said Rollins.

The councillor said a lot of volunteer groups “ebbed and flowed” during the pandemic, so it’s possible COVID-19 pressures also affected this particular organization. She said the city is seeking answers and not taking steps to reacquire the land at this point.

“(The group created) a really placemaking park in the downtown and had done some really important and beautiful work… (But) I’m concerned with augmenting the green space in the downtown… I generally want a higher and better use than a surface parking lot, especially one attached to green space,” said Rollins.

Previous work on the park to honour its history has included the creation of gardens, an interpretive wall and the preservation of Upper Fort Garry’s original north gate.

After promising to transform the surface lot into an interpretive centre 15 years ago, The Friends of Upper Fort Garry continue to collect parking proceeds with no signs of development. (MIkaela MacKenzie / Free Press)
After promising to transform the surface lot into an interpretive centre 15 years ago, The Friends of Upper Fort Garry continue to collect parking proceeds with no signs of development. (MIkaela MacKenzie / Free Press)

In an email, city spokesman Kalen Qually confirmed the conditional use permit for the parking lot expired in 2019, a status that has not changed since.

“There hasn’t been an extension granted. The city notified the group that they’re required to submit both variance and conditional use applications to allow for continued use of the parking lot,” he said.

Rollins noted the provincial ownership of the park could complicate any attempt by the city to take the parking lot portion of the property back.

Qually confirmed the parking lot is part of the land now owned by the province.

joyanne.pursaga@freepress.mb.ca

X: @joyanne_pursaga

Joyanne Pursaga

Joyanne Pursaga
Reporter

Joyanne is city hall reporter for the Winnipeg Free Press. A reporter since 2004, she began covering politics exclusively in 2012, writing on city hall and the Manitoba Legislature for the Winnipeg Sun before joining the Free Press in early 2020. Read more about Joyanne.

Every piece of reporting Joyanne produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

Report Error Submit a Tip

More Stories

The ‘Buy Canadian’ trade war challenge

Editorial 4 minute read Preview

The ‘Buy Canadian’ trade war challenge

Editorial 4 minute read 2:00 AM CDT

“Buy Canadian,” they tell us, as trade tensions escalate between Canada and the United States. “Elbows up,” the pithy slogan advises again and again, in response to the latest daily affront from increasingly unbalanced U.S. President Donald Trump.

Read
2:00 AM CDT

NDP defends involvement of U.S. company in Hydro project

Chris Kitching 5 minute read Preview

NDP defends involvement of U.S. company in Hydro project

Chris Kitching 5 minute read Wednesday, Sep. 2, 2026

A U.S. company that donated to Donald Trump’s 2025 presidential inauguration could build Manitoba Hydro’s proposed $3-billion natural gas turbines, which has drawn criticism from an environmental group amid the NDP government’s pushback to tariffs.

Read
Wednesday, Sep. 2, 2026

Class delayed a day after mould found in Tyndall Park school

Maggie Macintosh 6 minute read Preview

Class delayed a day after mould found in Tyndall Park school

Maggie Macintosh 6 minute read Yesterday at 7:31 PM CDT

The first day of school has been postponed at École Stanley Knowles School after teachers discovered mould on chairs, rugs and other items when they were setting up their classrooms.

Families were alerted Thursday afternoon that an “HVAC malfunction” required extensive cleanup and, as a result, a one-day delay to the new year.

“I called it a couple weeks ago — it smelled really strong of mould,” said Amanda Bell, a mother who’s gone to the building regularly all summer to drop off and pick up her children from the on-site daycare.

Bell recalled she and her partner got a whiff of “wet mould” in a first-floor hallway near the library in mid-August and flagged it to an employee who told them they’d contact a custodian.

Read
Yesterday at 7:31 PM CDT

Comic creator unleashes talent with book bound for festival

Sheldon Birnie 6 minute read Preview

Comic creator unleashes talent with book bound for festival

Sheldon Birnie 6 minute read 2:00 AM CDT

For Glenn Hares, comic books — specifically, superhero comics — have always been a refuge, a way to both understand and escape the world.

Now, he’s prepared to release his own into the world.

“When I was in high school, I started creating characters, like this guy here,” says Hares, 40, showing a reporter a copy of the self-published Tytanium No. 0.

“Originally, he was just named Jerry Wolfe. Recently, my aunt suggested I make him neurodivergent because I based him on myself. A lot of superheroes have extraordinary, fantastic, out-of-the-ordinary powers, but they’re also just people. They live imperfect lives.”

Read
2:00 AM CDT

Westwood standoff ends with two arrested

Morgan Modjeski and Erik Pindera 3 minute read Preview

Westwood standoff ends with two arrested

Morgan Modjeski and Erik Pindera 3 minute read Updated: Yesterday at 6:29 PM CDT

An hours-long standoff in Westwood came to an end Thursday with Winnipeg police arresting two men and seizing a gun.

Winnipeg Police Service officers were called to Byrd Avenue shortly before 9:30 a.m. after a man was seen walking with what appeared to be a firearm, said police spokesman Const. Claude Chancy.

Officers identified a home connected to the investigation, he said.

Two men were arrested but Chancy could not yet say what they will be charged with. It’s not clear whether either of the men arrested was the male spotted with a gun.

Read
Updated: Yesterday at 6:29 PM CDT

Neighbours relieved after fire strikes Quickie Mart

Morgan Modjeski 4 minute read Preview

Neighbours relieved after fire strikes Quickie Mart

Morgan Modjeski 4 minute read Wednesday, Sep. 2, 2026

As Janina McNaughton watched the Quickie Mart on River Avenue go up in flames on Tuesday, she felt relieved.

“The first thing I see is flames, like a fireball of flames inside,” McNaughton said about watching the blaze from her bedroom across the street.

On Wednesday, the bright green building, at 292 River Ave., was boarded up and charred on the outside.

Crews from the Winnipeg Fire Paramedic Service responded at 8:13 p.m. Tuesday to battle the blaze, said the city in a news release. It was under control within the hour.

Read
Wednesday, Sep. 2, 2026