Historic Assiniboine Park footbridge needs modern repairs: city

The Assiniboine Park footbridge has been the gateway to the popular green space for almost a century, the scene of countless walks, chats and selfies, and now the iconic structure is in need of some tender loving care.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 06/11/2024 (653 days ago), so information in it may no longer be current.

The Assiniboine Park footbridge has been the gateway to the popular green space for almost a century, the scene of countless walks, chats and selfies, and now the iconic structure is in need of some tender loving care.

The City of Winnipeg is looking to hire a professional consultant to assess the condition of the bridge, which spans the Assiniboine River to connect the park with St. James, as well as determine how much weight it can carry as the preliminary plan to rehabilitate it is developed.

Susan and Jim Barchyn, who have lived near the Deer Lodge Centre for decades, have walked across the bridge almost every single day during that time.

RUTH BONNEVILLE / FREE PRESS
                                Susan and Jim Barchyn walk over the footbridge several times a week and love the connection it allows them to the river.

RUTH BONNEVILLE / FREE PRESS

Susan and Jim Barchyn walk over the footbridge several times a week and love the connection it allows them to the river.

“We used to have dogs and we would walk them across every day,” said Susan Barchyn on Wednesday.

“We walk year-round. I like to see it when the river ice breaks up. If the water is high when the ice hits the bridge there is a ‘thud’. It shakes the whole bridge.

“I just love it. It would be a huge loss if there was no bridge.”

Jim Barchyn said there’s no question the city has to repair the concrete cantilever structure, which measures 157 metres long and 3.6 metres wide. It was built between late 1931 and early 1932 at a cost of $57,000. It was officially opened on May 21, 1932, by the mayor at the time, Ralph Webb.

ARCHIVES OF MANITOBA, L.B. FOOTE FONDS
                                Every summer between 1912 and the existing bridge’s opening in 1932, the city built and removed a pontoon bridge to provide access to Assiniboine Park from Portage Avenue.

ARCHIVES OF MANITOBA, L.B. FOOTE FONDS

Every summer between 1912 and the existing bridge’s opening in 1932, the city built and removed a pontoon bridge to provide access to Assiniboine Park from Portage Avenue.

“A lot of people enter the park coming over this bridge,” he said. “You take this away and there is really no access across the park from the north side.”

The Winnipeg Architecture Foundation says the bridge was constructed as a Depression relief project to replace a temporary pontoon bridge that was built and removed annually at a cost of $1,400 per year. Wooden piers can still be seen in the river bed when the water level is low.

In 2004, concrete piles were added to the footbridge retaining wall on the north side. Five years later, deck was resurfaced with asphalt. Underwater inspections were conducted in 2006, 2012, and 2022.

The city’s request for qualification, or RFQ, says recent inspections have found “major leaking of deck throughout the soffit” as well as “full height cracks at multiple locations through supporting main girders.”

Inspectors found exposed rebar on the deck soffit and “extensive cracking and disintegration of pier caps.”

“I just love it. It would be a huge loss if there was no bridge.”–Susan Barchyn

“The existing pedestrian bridge is aging and experiencing signs of deterioration and needs to be assessed to determine its existing condition,” the RFQ says. It says a load rating must be calculated to determine how heavy a maintenance vehicle can be to go onto the footbridge.

Lynn Dusesoy, owner of Sargent Sundae on Portage Avenue, which is across from the bridge, said she hopes the city repairs it.

“If not, we will have to find some boats for everyone,” she said laughing.

“If it closed, definitely there would be a little bit of an impact on us. People love the park and they love to walk across to us. I would definitely like to see it fixed.”

“It’s an absolute necessity to have the bridge there.”–St. James Coun. Shawn Dobson

St. James Coun. Shawn Dobson, who is a member of the city’s historical buildings and resources committee, said it recently looked at the possibility of granting the footbridge heritage status.

“It’s an absolute necessity to have the bridge there,” said Dobson.

“It’s the No. 1 access way to get to the zoo for St. James residents. We need to rehabilitate it and maintain this structure and its appearance.

“It has been there forever and it needs to stay there.”

Heritage Winnipeg executive director Cindy Tugwell said the bridge must be repaired because “it’s not just an Assiniboine Park gem, it is an entire city gem.”

RUTH BONNEVILLE / FREE PRESS
                                Recent inspections have found “major leaking of deck throughout the soffit” as well as “full height cracks at multiple locations through supporting main girders.”

RUTH BONNEVILLE / FREE PRESS

Recent inspections have found “major leaking of deck throughout the soffit” as well as “full height cracks at multiple locations through supporting main girders.”

City spokeswoman Julie Horbal Dooley called it “a standard, service-life rehabilitation project.”

“Our goal is to do maintenance on the bridge now to prevent safety issues in the future. We do regular inspections, which told us now is the time to do some major maintenance.

She said inspectors didn’t say repairs require imminent closure.

Assiniboine Park Conservancy spokeswoman Laura Capak said it can’t comment on the city looking at hiring a consultant for the bridge until the documents are reviewed.

She said the bridge is the city’s responsibility.

But Capak said the footbridge is “an important point of access for park visitors.”

kevin.rollason@freepress.mb.ca

Kevin Rollason

Kevin Rollason
Reporter

Kevin Rollason was a general assignment reporter at the Free Press.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

Report Error Submit a Tip

More Stories

Vance weighs in on Jivani trade advocacy and how Carney tried to ‘out-tough’ Trump

Kelly Geraldine Malone, The Canadian Press 5 minute read Preview

Vance weighs in on Jivani trade advocacy and how Carney tried to ‘out-tough’ Trump

Kelly Geraldine Malone, The Canadian Press 5 minute read Updated: 8:49 AM CDT

WASHINGTON - U.S. Vice-President JD Vance weighed in on the latest trade deal with Canada at a fundraising event Wednesday, saying Prime Minister Mark Carney tried to "out-tough" President Donald Trump while crediting his longtime friend Conservative MP Jamil Jivani as a helpful advocate for Canada.

In audio from the fundraiser in Southampton, N.Y., which was provided to The Canadian Press by a source who attended the private function, Vance said Carney is a "very sweet guy" and he gets along with him quite well.

But, Vance said, Carney "comes in and puffs his chest out and says, 'I'm going to, like, out-tough Donald Trump.'"

"It's hilarious because Carney presents this as some victory for Canada when fundamentally, like, they climb down on a lot of issues," Vance told the room.

Read
Updated: 8:49 AM CDT

Winnipeg’s postwar architecture well-documented by online archive

Conrad Sweatman 6 minute read Preview

Winnipeg’s postwar architecture well-documented by online archive

Conrad Sweatman 6 minute read 1:00 PM CDT

We live in a city rich with Chicago School high rises, mid-century modernism and much more. And, for the past three decades, Paul Clerkin has amassed arguably the most comprehensive archive of this architecture.

Read
1:00 PM CDT

City blames bad weather for creating new sinkhole on Sturgeon Creek path

Malak Abas 3 minute read Preview

City blames bad weather for creating new sinkhole on Sturgeon Creek path

Malak Abas 3 minute read Updated: 1:17 PM CDT

After a massive water-filled hole on a Sturgeon Creek active-transportation pathway took more than a year to fix, a new sinkhole has opened nearby.

In June 2023, the Free Press reported on a gaping depression stretching seven metres long, three metres wide and up to a metre deep that opened on a pathway leading to a playground on Amarynth Crescent near the Sturgeon Creek active-transportation route. The city finally made repairs in October 2024.

Now, about 12 metres away from that spot, a new crater has appeared.

The hole, about three metres long and 2.5 metres wide, has been blocked off using metal rods and plastic netting, but resident Philip Kaban said the opening is getting larger.

Read
Updated: 1:17 PM CDT

Elders bless, open city’s first urban all-season sweat lodge

Nicole Buffie 3 minute read Preview

Elders bless, open city’s first urban all-season sweat lodge

Nicole Buffie 3 minute read 4:20 PM CDT

Indigenous Winnipeggers now have access to sweat lodge ceremonies all year long.

On Friday Ka Ni Kanichihk unveiled Winnipeg’s first urban, all-seasons sweat lodge. The organization will hold ceremonies throughout the year, giving people who live in the city equitable access to the sacred ritual.

“We’re now going to be able to offer ceremony for relatives that can’t access a sweat ceremony outside the city because of financial restraint or that kind of thing,” said Wally Chartrand, a cultural advisor for Ka Ni Kanichihk.

The sweat lodge itself is enclosed in a cedar-panelled building equipped with washrooms and benches. Outside the building is a fire pit enclosed with a seating area and plants which are used as traditional Indigenous medicine during the ceremonies.

Read
4:20 PM CDT

Low-income residents of 114-year-old downtown block staggered by proposed rent hikes

Malak Abas 9 minute read Preview

Low-income residents of 114-year-old downtown block staggered by proposed rent hikes

Malak Abas 9 minute read Updated: Yesterday at 11:27 AM CDT

Marcel Blanchette’s life has not travelled down a smooth road.

In 2014, he was violently assaulted in his home, an unprovoked attack that left him with severe injuries, including permanent brain damage. He underwent months of hospitalization and rehabilitation. During that time, he learned his possessions had been sold off when the Office of The Public Guardian and Trustee took over his affairs.

Twelve years later, he finds himself in another fight. This time, it comes in the form of a proposal from the new owners of the Conway Court apartment block that would nearly double his monthly rent. While he’s been able to live in the Kennedy Street unit with the support of disability income assistance for nearly five years, the sudden spike, he said, could leave him homeless.

“To go through that, and now I’m going through this, it’s another obstacle,” Blanchette told the Free Press. “I fought the Public Guardian and Trustee, and I’ll fight this too, with whatever I have.”

Read
Updated: Yesterday at 11:27 AM CDT

Fatal stabbing of Ukrainian newcomer left family shattered

Erik Pindera 6 minute read Preview

Fatal stabbing of Ukrainian newcomer left family shattered

Erik Pindera 6 minute read Yesterday at 5:47 PM CDT

A man who fatally stabbed a Ukrainian newcomer in “a random, unprovoked, and senseless act of violence” on the street has been sentenced to 10 years behind bars.

Ethan Gladu, 22, was found guilty of manslaughter in February in the December 20, 2023 killing of Ivan Rubanik, a 46-year-old father of two who had fled to Canada for a better life with his family several months before.

Gladu, then 19, randomly stabbed Rubanik shortly before 8 a.m., near Talbot Avenue and Watt Street, as the victim was walking to work that morning. He died of blood loss soon after.

“The people of Winnipeg, or any community, should feel confident that they can go about their business, walk to work, support their family, and carry on with their lives without being attacked,” said Court of King’s Bench Justice Kenneth Champagne on Thursday afternoon as he sentenced the killer.

Read
Yesterday at 5:47 PM CDT