Price tag for proposed Transcona pool, rec centre jumps $66M
Advertisement
Read this article for free:
or
Already have an account? Log in here »
To continue reading, please subscribe:
Monthly Digital Subscription
$1 per week for 24 weeks*
- Enjoy unlimited reading on winnipegfreepress.com
- Read the E-Edition, our digital replica newspaper
- Access News Break, our award-winning app
- Play interactive puzzles
*Billed as $4.00 plus GST every four weeks. After 24 weeks, price increases to the regular rate of $19.00 plus GST every four weeks. Offer available to new and qualified returning subscribers only. Cancel any time.
Monthly Digital Subscription
$4.75/week*
- Enjoy unlimited reading on winnipegfreepress.com
- Read the E-Edition, our digital replica newspaper
- Access News Break, our award-winning app
- Play interactive puzzles
*Billed as $19 plus GST every four weeks. Cancel any time.
To continue reading, please subscribe:
Add Free Press access to your Brandon Sun subscription for only an additional
$1 for the first 4 weeks*
*Your next subscription payment will increase by $1.00 and you will be charged $16.99 plus GST for four weeks. After four weeks, your payment will increase to $23.99 plus GST every four weeks.
Read unlimited articles for free today:
or
Already have an account? Log in here »
A major aquatic and recreation facility proposed for Transcona is now expected to cost $155.5 million, with no further updates expected until city council finds a way to pay for it.
The price for the East of the Red RecPlex was previously pegged at $89.2 million, though officials cautioned that number was several years old and estimated before important design work was done.
On Monday, the city revealed the new cost estimate, noting the tab also reflects inflation and a more detailed design, as well as the addition of a daycare with outdoor play space, new green building measures, an outdoor basketball half-court and a larger gym.

SUPPLIED
The City of Winnipeg’s East of the Red RecPlex is now expected to cost $155.5 million.
The city is now aiming to meet a zero-carbon building design standard to reduce the facility’s emissions.
“The updated cost estimate reflects a more advanced stage of design and planning,” a public consultation document states.
The complex is expected to include an indoor lap pool, a leisure pool, a lazy river, a whirlpool, waterslides, multi-purpose rooms, a community kitchen, gymnasiums, fitness areas, a running track, a child-care centre, a café and a connection to the Transcona Library.
“It’s a fairly large project, which is currently not fully funded (beyond initial planning stages). So, no reporting is going to come back until we figure out how we can support it,” said Coun. Vivian Santos, chairwoman of the community services committee.
Santos (Point Douglas) said the city would likely need to seek provincial and federal support to pay for the project, noting its daycare for up to 74 kids would support provincial goals.
The price hike isn’t really a surprise, since many other construction projects have already surged higher in recent years, she said.

SUPPLIED / CITY OF WINNIPEG
This proposed center will be a place where families and individuals can enjoy various activities all in one location.
“We’re seeing a lot of other capital projects coming in much, much higher,” said Santos.
She said the city could also consider scaling back the plans, or completing them in phases, if council opts to move forward.
The cost estimate for the facility includes decommissioning Transcona Kinsmen Centennial Pool, which the project would replace, and a new washroom/change room facility that would serve the Transcona Aquatic Park.
When the plans move forward depends on how the project fits against other priorities of city council’s strategic action plan, said Santos.
The latest price estimate is based on construction in 2028.

SUPPLIED / CITY OF WINNIPEG
This proposed center will be a place where families and individuals can enjoy various activities all in one location.
joyanne.pursaga@freepress.mb.ca
X: @joyanne_pursaga

Joyanne is city hall reporter for the Winnipeg Free Press. A reporter since 2004, she began covering politics exclusively in 2012, writing on city hall and the Manitoba Legislature for the Winnipeg Sun before joining the Free Press in early 2020. Read more about Joyanne.
Every piece of reporting Joyanne produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.
Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.
Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.