Tearing down Portage Place to build it up ‘Deconstruction’ project on time, on budget as developers dream of vibrant downtown

One “bite” at a time, a hulking piece of machinery is dismantling Portage Place’s east block to make way for a new health-care tower that will soon begin to rise.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 27/01/2026 (256 days ago), so information in it may no longer be current.

One “bite” at a time, a hulking piece of machinery is dismantling Portage Place’s east block to make way for a new health-care tower that will soon begin to rise.

It’s the most visible stage so far of a $650-million project to transform the slumping downtown mall into a community hub that will also have a highrise apartment building, grocery store and green space.

“This isn’t really demolition. It’s deconstruction,” said David Van Hooren, senior construction manager at PCL Construction, during a tour of work that was happening on the east side of the Portage Avenue site, between Edmonton and Carlton streets, on Tuesday.

“By the end of 2026, people will see visible signs of what this building will look like.”

True North Real Estate Development — an arm of the company that owns the Winnipeg Jets — acquired the mall in 2024. The 1.2-million-square-foot redevelopment, led by PCL Construction, began last year.

The project is on time and on budget, said Sean Kavanagh, senior director of strategic communications with True North Sports and Entertainment.

Recalling more vibrant days of decades past, he said the redevelopment, along with several other projects, will bring thousands of residents and visitors downtown by the end of 2028.

“I really believe we’re going to get back to that kind of level (of vibrancy) with all the increase in activity,” Kavanagh said.

The deconstruction work on Portage Place’s east side is what most people notice when they walk or drive by. The block is being converted into a 12-storey, 300,000-square-foot medical tower — the project’s opening phase — that will include primary care, mental health services and Pan Am Clinic programs.

MIKE DEAL / FREE PRESS
                                A massive excavator, one of only eight in North America, dismantles Portage Place’s east block Tuesday, to make way for a new health-care tower.

MIKE DEAL / FREE PRESS

A massive excavator, one of only eight in North America, dismantles Portage Place’s east block Tuesday, to make way for a new health-care tower.

The glass atrium at Portage and Edmonton was demolished, and its pedestrian bridges removed. In their place, Rakowski Cartage and Wrecking staff are using an ultra-high demolition excavator, with a claw at the end of its arm, to break apart a concrete shell that once contained stores and a food court.

“This equipment breaks the structure into bite-size pieces,” Van Hooren told reporters against the loud hum of the machine, while chunks of concrete and rebar fell to the ground, in biting -20 C cold.

Crews will preserve as much of the low-rise structure as possible, including floor slabs, columns and a stairwell.

“We’re taking this apart very carefully. What’s left is going to be used in the new health-care facility,” Van Hooren said.

About 75 per cent of the material that is removed will be recycled.

The former atrium will become an outdoor pedestrian corridor — linking Portage and Ellice avenues — and a one-way vehicle drop-off zone for the health-care tower.

“I really believe we’re going to get back to that kind of level (of vibrancy) with all the increase in activity.”

The deconstruction is expected to wrap up in about four to five weeks, giving way to construction of the highrise, which is being called a Healthcare Centre of Excellence. A tower crane will go up in the spring.

Construction of the 15-storey, multi-family housing tower, located on the west side of the property at Portage and Vaughan Street, will begin later this winter, Kavanagh said.

The highrise will have more than 200 units, up to 40 per cent of which will be designated affordable.

True North and the Southern Chiefs’ Organization partnered to create a non-profit called TN-SCO 92 Inc., which will manage the units.

Van Hooren said 62 workers were on site Tuesday. The number will rise to more than 300 per day by summer’s end. Thousands of workers will contribute to the project by the time it is complete, he said.

The nearly 123-year-old clock that was displayed in the atrium is in storage. The city asset will be displayed in public again, although it’s too early to disclose the location, said Cindy Tugwell, executive director of Heritage Winnipeg.

MIKE DEAL / FREE PRESS
                                David Van Hooren, senior construction manager for PCL, walks past support posts that are keeping the ceiling in place while demolition continues on the upper levels.

MIKE DEAL / FREE PRESS

David Van Hooren, senior construction manager for PCL, walks past support posts that are keeping the ceiling in place while demolition continues on the upper levels.

“I can assure Winnipeggers it will be preserved,” she said. “It will again be part of the downtown and Exchange (District).”

Portage Place’s centre block, which includes stores, a Service Canada branch and Prairie Theatre Exchange, remains open to the public.

A new wall was built to separate the centre block from construction on the east side. The eastern portion of the parkade, which is off-limits to the public, contains thousands of shoring posts to support the weight of the work taking place above it.

Kavanagh said True North wanted to keep as much of the mall open as possible during the project.

“It was important for us to try to keep the heart pumping. A lot of people use the mall,” he said.

True North hopes to retain as many tenants as possible, Kavanagh added.

“We’re taking this apart very carefully. What’s left is going to be used in the new health-care facility.”

The centre block is in the consultation and design stages. A grocery store is envisioned as one of the project’s anchors. There will also be space for community centres and social agencies.

To make way for the apartment tower, the non-profit Pitikwé skateboard park moved out of a former Staples store on Portage Place’s main floor.

Kavanagh said the skate park is expected to reopen in March in the former Dayton Building, at 323 Portage Ave. (across from Canada Life Centre). It will be a temporary home, thanks to a partnership between True North, the province and Access Credit Union.

“We want a vibrant, healthy downtown. Recreational opportunities for young people are a critical part of that,” Kavanagh said.

The apartment tower will go up across from the former Bay building, which SCO is converting into a mixed-use space, including more than 370 housing units and a child-care centre. Expected to finish in 2028, the $310-million project is also led by Edmonton-based PCL Construction.

Mayor Scott Gillingham said downtown has a lot of exciting momentum, with the Portage Place redevelopment one of the “key anchor projects” currently underway.

MIKE DEAL / FREE PRESS
                                The demolition work on Portage Place’s east side is to make way for a 12-storey, 300,000-square-foot medical tower that will include primary care, mental health services and Pan Am Clinic programs.

MIKE DEAL / FREE PRESS

The demolition work on Portage Place’s east side is to make way for a 12-storey, 300,000-square-foot medical tower that will include primary care, mental health services and Pan Am Clinic programs.

“That space is a massive footprint that had been underperforming for years, and was really a drag on our downtown,” he said.

— with files from Joyanne Pursaga

chris.kitching@freepress.mb.ca

Chris Kitching

Chris Kitching
Reporter

Chris Kitching is a general assignment reporter at the Free Press. He began his newspaper career in 2001, with stops in Winnipeg, Toronto and London, England, along the way. After returning to Winnipeg, he joined the Free Press in 2021, and now covers a little bit of everything for the newspaper. Read more about Chris.

Every piece of reporting Chris produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

Report Error Submit a Tip

More Stories

Heated hiring debate over iced coffee

Tory McNally 7 minute read Preview

Heated hiring debate over iced coffee

Tory McNally 7 minute read 2:01 AM CDT

Apparently, we have found the latest battleground in the generational war over what constitutes professionalism: iced coffee.

Not wages. Not work-life balance. Not whether employees should answer emails after 5 p.m.

There has been quite a bit of discussion lately about whether it is appropriate for a job candidate to walk into an interview carrying an iced coffee. To some hiring managers, it is a clear sign of poor judgment, a lack of professionalism or an attitude that says, “This isn’t really a big deal.” To others, it is simply a person walking into a meeting with a drink they picked up on the way.

I have to admit, as an HR person, I can see both sides.

Read
2:01 AM CDT

PCs renew calls for CFS inquiry

Carol Sanders 6 minute read Preview

PCs renew calls for CFS inquiry

Carol Sanders 6 minute read Thursday, Oct. 8, 2026

The Progressive Conservatives renewed calls to put Manitoba’s child and welfare system under the microscope Thursday, tabling a motion that urged the province to appoint a commissioner to lead a public inquiry.

Families critic Jodie Byram’s opposition day motion, which was ultimately defeated by the NDP majority, reiterated demands for an inquiry into the systemic failures of Child and Family Services, more than 20 years after the death of Phoenix Sinclair first prompted demands for answers.

“We have seen far too many children die under the care of CFS, and we need to determine where the gaps are in the system in order to make the system a safer place for children,” Byram told reporters before the motion was defeated in the legislature.

Families Minister Nahanni Fontaine said in an interview that her department, CFS agencies and authorities are “doing good work” and won’t call an inquiry.

Read
Thursday, Oct. 8, 2026

Protein crests current appetite wave

Laura Rance-Unger 5 minute read Preview

Protein crests current appetite wave

Laura Rance-Unger 5 minute read 2:01 AM CDT

Holiday feasts often reflect the latest fads and trends influencing how we eat.

This Thanksgiving’s table is likely to feature more Canadian content than it might otherwise as a point of national pride.

In the recent past, the carb-free craze has made cauliflower a substitute for the mashed potatoes on some family spreads. Some have gone meatless, while others have added more. Still others offer gluten-free, dairy-free or fat-free alternatives.

Nowadays, it seems consumers can’t get enough protein. Desmond Sobool, deputy chief economist Farm Credit Canada, told a recent economic update for the agri-food sector there are two converging influences in play.

Read
2:01 AM CDT

Tearing down Portage Place to build it up

Chris Kitching 6 minute read Preview

Tearing down Portage Place to build it up

Chris Kitching 6 minute read Tuesday, Jan. 27, 2026

One “bite” at a time, a hulking piece of machinery is dismantling Portage Place’s east block to make way for a new health-care tower that will soon begin to rise.

It’s the most visible stage so far of a $650-million project to transform the slumping downtown mall into a community hub that will also have a highrise apartment building, grocery store and green space.

“This isn’t really demolition. It’s deconstruction,” said David Van Hooren, senior construction manager at PCL Construction, during a tour of work that was happening on the east side of the Portage Avenue site, between Edmonton and Carlton streets, on Tuesday.

“By the end of 2026, people will see visible signs of what this building will look like.”

Read
Tuesday, Jan. 27, 2026

Nature doesn’t waste its time

Russell Wangersky 7 minute read Preview

Nature doesn’t waste its time

Russell Wangersky 7 minute read 2:01 AM CDT

Sixteen months in and the black burn from a forest fire somehow transitions from the foreground to the background. I’m not sure if it actually softens, if it really changes, or if is just that your eyes, now used to the background, start seeing less of it.

One thing’s for certain: nature doesn’t waste any time taking its opportunities. In the sheltered ground behind where the shed over our Newfoundland root cellar used to be, a forest of sorrel has arisen, its dark-green leaves with their distinctive double horns at their base crowding in tight amongst each other.

It’s no surprise: sorrel is new beginnings, often the first plant I see recultivating abandoned gardens or disturbed ground and I’m happy to have it around always. Its distinctive lemony bite is a fine addition to salads, though we’re not likely to choose it from that particular root cellar patch. Not with the way the asphalt roof shingles burned right around there. I shovelled up the heavy pats of congealed black tar last spring, right after the fire, bringing them up from inside the cellar in big plastic buckets to send to safe disposal. But there’s probably plenty of tar still in the ground and out of sight — hardly an appetizing thought.

From other areas, maybe we will eventually sample sorrel: it depends on how close they were to the house or shed or anything else that burned. And so very much burned. The province has said gardens are safe from contamination by fire-retardant chemicals as nothing has shown up in tests. But we know what way the wind was blowing — what burned, and where, is always part of the equation. It’s a strange calculation to make: I’m just glad our house wasn’t heated with fuel oil, was too old to contain asbestos, and didn’t have indoor plumbing for decades.

Read
2:01 AM CDT

Other cities build rapid transit, while we wait

Ken Klassen 4 minute read Preview

Other cities build rapid transit, while we wait

Ken Klassen 4 minute read Yesterday at 2:00 AM CDT

Winnipeg’s civic election campaign has produced no shortage of promises to improve transit safety and fix problems with the new network. Those issues are real and urgent. But they should not distract from a larger failure — while other Canadian urban regions secure billions in federal support to transform their transit systems, Winnipeg is falling further behind.

Read
Yesterday at 2:00 AM CDT