Robot starts 2nd mission to retrieve debris at the ruined Fukushima nuclear plant

Advertisement

Advertise with us

TOKYO (AP) — A remote-controlled robot on Tuesday embarked on its second mission to retrieve tiny bits of melted fuel debris from inside a damaged reactor at the Fukushima nuclear plant that was wrecked by a tsunami 14 years ago.

Read this article for free:

or

Already have an account? Log in here »

To continue reading, please subscribe:

Monthly Digital Subscription

$1 per week for 24 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*Billed as $4.00 plus GST every four weeks. After 24 weeks, price increases to the regular rate of $19.95 plus GST every four weeks. Offer available to new and qualified returning subscribers only. Cancel any time.

Monthly Digital Subscription

$4.99/week*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*Billed as $19.95 plus GST every four weeks. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

No thanks

*Your next subscription payment will increase by $1.00 and you will be charged $16.99 plus GST for four weeks. After four weeks, your payment will increase to $23.99 plus GST every four weeks.

Hey there, time traveller!
This article was published 15/04/2025 (346 days ago), so information in it may no longer be current.

TOKYO (AP) — A remote-controlled robot on Tuesday embarked on its second mission to retrieve tiny bits of melted fuel debris from inside a damaged reactor at the Fukushima nuclear plant that was wrecked by a tsunami 14 years ago.

The mission, which follows the first such debris retrieval in November, is aimed at eventually developing the technology and robots needed for a larger scale cleanup of the plant, destroyed by the earthquake and tsunami in March 2011.

The extendable “Telesco” robot carries cameras and a tong to grip tiny nuggets of radioactive debris. It entered the No. 2 reactor’s primary containment vessel Tuesday, according to Tokyo Electric Power Company.

FILE - This aerial view shows the Fukushima Daiichi nuclear power plant in Fukushima, northern Japan, on Aug. 24, 2023. (Kyodo News via AP, File)
FILE - This aerial view shows the Fukushima Daiichi nuclear power plant in Fukushima, northern Japan, on Aug. 24, 2023. (Kyodo News via AP, File)

This time, the company aims to send the robot further into the containment vessel to get a sample from an area closer to the center where more melted fuel is believed to have fallen.

It is expected to take several days before the front tip of the robot reaches the targeted area, where it will lower a device carrying a tong and camera in a fishing-rod style.

That first sample retrieval in November, despite a number of mishaps, was a crucial step in what will be a daunting, decades-long decommissioning that must deal with at least 880 tons of melted nuclear fuel that has mixed with broken parts of internal structures and other debris inside the three reactors ruined in 2011.

After a series of small missions by robots to gather samples, experts will determine a larger-scale method for removing melted fuel, first at the No. 3 reactor, beginning in the 2030s.

Experts say the huge challenge of decommissioning the plant is just beginning, and that the work could take more than a century.

Report Error Submit a Tip

World

LOAD MORE