Administration plans intensive, year-round construction schedule for Trump’s triumphal arch

Advertisement

Advertise with us

WASHINGTON (AP) — Construction of the 250-foot-high triumphal arch that President Donald Trump wants built near the Lincoln Memorial could occur 20 hours per day, year-round, as officials push to complete the project within three years, according to a preliminary assessment by the National Park Service.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

WASHINGTON (AP) — Construction of the 250-foot-high triumphal arch that President Donald Trump wants built near the Lincoln Memorial could occur 20 hours per day, year-round, as officials push to complete the project within three years, according to a preliminary assessment by the National Park Service.

Tower cranes up to 320 feet tall, forklifts, concrete pump systems and other equipment would be needed to build the arch, which would be more than twice as high as the Lincoln Memorial. Work would occur year-round in two 10-hour shifts per day, the Park Service report said.

The 24-page assessment by NPS staff was released last week as a part of a fast-tracked historic preservation review that began Friday. The park service oversees the land where the administration wants to build the arch.

The Memorial Circle, where President Donald Trump has proposed building an arch to commemorate the United States' 250th anniversary is seen, Tuesday, May 19, 2026, in Washington. (AP Photo/Alex Brandon)
The Memorial Circle, where President Donald Trump has proposed building an arch to commemorate the United States' 250th anniversary is seen, Tuesday, May 19, 2026, in Washington. (AP Photo/Alex Brandon)

The National Capital Planning Commission voted last week to seek more information from the Interior Department, which oversees the park service. The vote essentially kept the project alive as officials study how the arch could potentially impact air travel, as well as other specifics on construction and traffic in the area.

The June 4 vote came after nearly three hours of public comment from about 20 members of the public, some representing historic and architectural organizations, and most of whom expressed concerns about the arch that is one of several projects the Republican president is pursuing to leave his imprint on Washington.

Preliminary surveys and testing of the arch site began last month, and other approvals are underway. The U.S. Commission of Fine Arts — which only oversees designs and has no role in the actual construction or funding of the arch or any other project it considers — has approved the arch’s design.

Concerns over arch’s height

The capital planning commission is seeking more information justifying the proposed height of the towering arch, as well as additional details about lighting, management of storm water and how traffic and parking would be regulated for visitors.

The planned site for the arch, across the Potomac River from the memorial, is on a flight path near Ronald Reagan Washington National Airport. The Federal Aviation Administration said Wednesday it is reviewing whether the project’s planned height poses a risk to airplane travel in the area. An American Airlines jet and an Army Black Hawk helicopter collided a year ago in crowded skies near the airport, killing 67 people.

The FAA review “found no adverse impacts to operations” at Reagan Airport from the proposed arch. but determined that the top of the structure would need to be lit with red obstruction lights — a common safety tool, spokesman Donnell Evans said. The FAA will conduct a full aeronautical study in coordination with the National Park Service, he said.

The park service, in its report, said aviation-required safety lighting would be incorporated into the arch design “using the least intrusive technology available, ensuring compliance with aircraft visibility requirements while limiting unnecessary light emission.”

Will Scharf, who has served as Trump’s White House staff secretary, heads the commission and has said he believes a federal law limiting building heights for new construction in Washington should not apply to the arch. The law restricts most construction in Washington to a maximum height of 130 feet.

The arch faces a legal challenge

Critics have argued that the arch would dominate the skyline and disrupt carefully designed views between the Lincoln Memorial and Arlington National Cemetery. It would be more than twice as tall as the Lincoln Memorial, which is 99 feet (30 meters), and close to half the height of the Washington Monument, which is about 555 feet (169 meters).

Trump has pushed for the 250-foot-tall arch to mark America’s 250th anniversary, and has said the project could be paid for with private donations left over from the project to build a new White House ballroom. The White House East Wing was demolished to make way for a large ballroom.

A cost estimate for the arch is still being calculated, but a mix of taxpayer and private funds is expected to pay for it. A group of veterans and a historian have sued the Trump administration in federal court to block the project over concerns about disruptions to the sightline.

Democratic Sen. Richard Blumenthal of Connecticut criticized the administration about what he called its “persistent lack of transparency” in its efforts to advance Trump’s Washington-area construction projects. Besides the planned ballroom, Trump also is renovating the Lincoln Memorial’s Reflecting Pool and rebuilding a public golf course along the Potomac River. None of projects have gone through usual legal reviews or Congress.

“Your disregard for legal process and public interest has been apparent in projects ranging from the construction of a White House Ballroom and triumphal arch to the resealing of the Lincoln Memorial Reflecting Pool,” Blumenthal wrote in a letter Tuesday to Interior Secretary Doug Burgum and acting park service director Jessica Bowron.

___

Associated Press writers Meg Kinnard and Josh Funk contributed to this story.

Report Error Submit a Tip

More Stories

‘We got attacked’: Carney says retaliatory tariffs on U.S. to take effect next month

Catherine Morrison and David Baxter, The Canadian Press 7 minute read Preview

‘We got attacked’: Carney says retaliatory tariffs on U.S. to take effect next month

Catherine Morrison and David Baxter, The Canadian Press 7 minute read Updated: Yesterday at 3:46 PM CDT

OTTAWA - Prime Minister Mark Carney says retaliatory tariffs will hit the U.S. starting next month after Canada walked away from what he called a "bad deal."

The U.S. introduced new 50 per cent tariffs on billions of dollars in Canadian exports on Saturday after trade talks failed.

"We got attacked," Carney told reporters on Parliament Hill Saturday when asked about the escalating trade war.

Carney suspended talks with the United States late Friday and summoned his negotiators back to Ottawa.

Read
Updated: Yesterday at 3:46 PM CDT

Executive exodus continues at Shared Health with three recent departures

Chris Kitching 5 minute read Preview

Executive exodus continues at Shared Health with three recent departures

Chris Kitching 5 minute read Friday, Aug. 21, 2026

Manitoba’s provincial health authority is looking for its fourth chief financial officer since 2023 and additional replacements after the recent departures of three executives.

Read
Friday, Aug. 21, 2026

Administration plans intensive, year-round construction schedule for Trump’s triumphal arch

Matthew Daly, The Associated Press 5 minute read Preview

Administration plans intensive, year-round construction schedule for Trump’s triumphal arch

Matthew Daly, The Associated Press 5 minute read Wednesday, Jun. 10, 2026

WASHINGTON (AP) — Construction of the 250-foot-high triumphal arch that President Donald Trump wants built near the Lincoln Memorial could occur 20 hours per day, year-round, as officials push to complete the project within three years, according to a preliminary assessment by the National Park Service.

Tower cranes up to 320 feet tall, forklifts, concrete pump systems and other equipment would be needed to build the arch, which would be more than twice as high as the Lincoln Memorial. Work would occur year-round in two 10-hour shifts per day, the Park Service report said.

The 24-page assessment by NPS staff was released last week as a part of a fast-tracked historic preservation review that began Friday. The park service oversees the land where the administration wants to build the arch.

The National Capital Planning Commission voted last week to seek more information from the Interior Department, which oversees the park service. The vote essentially kept the project alive as officials study how the arch could potentially impact air travel, as well as other specifics on construction and traffic in the area.

Read
Wednesday, Jun. 10, 2026

Kinew’s message for PM: don’t back down

Niigaan Sinclair 5 minute read Preview

Kinew’s message for PM: don’t back down

Niigaan Sinclair 5 minute read Friday, Aug. 21, 2026

Let it be known that when Canada’s provinces and alcohol industries needed a defender, Canada’s first First Nations provincial premier was their greatest warrior.

This is, admittedly, a provocative opening line — referencing historical and cultural intersections and relying on a stereotype or two.

It’s impossible, however, not to see how important the nearly Canada-wide provincial-led ban on the sale of U.S. alcohol is to Manitoba Premier Wab Kinew.

It’s due to his stand on national matters like these that he’s become very popular — according to polls, the most popular premier in Canada — and has been empowered to take on the mantle of one of the captains of “Team Canada” on economic, political and domestic issues.

Read
Friday, Aug. 21, 2026

‘Strong sense of unity’

By Melissa Martin 6 minute read Preview

‘Strong sense of unity’

By Melissa Martin 6 minute read Yesterday at 5:14 PM CDT

Manitoba government and business leaders are rallying behind Prime Minister Mark Carney’s plan to fight back, after a sudden collapse of trade talks between the U.S. and Canada sparked a new salvo of U.S. tariffs on some Canadian goods.

On Saturday, after Carney vowed to respond with retaliatory tariffs, Manitoba premier Wab Kinew said his government stood “100 per cent” behind the prime minister’s plan to respond to what Kinew called U.S. president Donald Trump’s “unjustified and immoral” tariffs.

“History will not be kind to Donald Trump, so we should never appease him,” Kinew said. “We should fight back, which is what Canada is doing today.”

Kinew met reporters for a brief news conference at the legislature on Saturday afternoon, about an hour after finishing a call with Carney and the other premiers. There was a “really strong sense of unity” on that call, Kinew said, and emphasized that he backs the federal decision to “walk away from what would have been a bad deal.”

Read
Yesterday at 5:14 PM CDT

The trolls inside the Conservative tent

David McLaughlin 5 minute read Preview

The trolls inside the Conservative tent

David McLaughlin 5 minute read Yesterday at 2:00 AM CDT

The Conservative Party of Canada has a troll problem. And it’s coming from inside the tent.

Once, trolls existed only in imagination. They were figures of mythical proportion, big and small. They lived solitary lives under bridges, in caves, or forests. They were considered dim-witted and mean. Best avoided.

Today, they are real, unavoidable, and ubiquitous on social media. They are anything but solitary. There are tribes of them out there and tribal is how they think and post. As for dim-witted and mean, others can opine but they are uniformly mean and dismissive.

Mean to anyone who disagrees with their views. Dismissive of any view but their own. They distribute questionable, at best, facts and opinions grounded in hostility towards anything or anyone deemed disagreeable or heretical to their world view.

Read
Yesterday at 2:00 AM CDT