Forks bridge, closed for 16 months, could cost $10 million to fix

It could cost more than $10 million to repair the historic rail bridge at The Forks, a favourite with pedestrians and cyclists, which has been closed for 16 months.

Read this article for free:


or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 24/10/2024 (708 days ago), so information in it may no longer be current.

It could cost more than $10 million to repair the historic rail bridge at The Forks, a favourite with pedestrians and cyclists, which has been closed for 16 months.

Preliminary repairs to remediate the counterweight that sits above the bridge is expected to begin next week, said Zach Peters, communications manager of The Forks.

The price tag and timeline were outlined in engineering reports, which took longer than expected to conduct because of mild temperatures last winter.

MIKAELA MACKENZIE / FREE PRESS
                                The historic rail bridge at The Forks, a favourite with pedestrians and cyclists, closed suddenly in June 2023.

MIKAELA MACKENZIE / FREE PRESS

The historic rail bridge at The Forks, a favourite with pedestrians and cyclists, closed suddenly in June 2023.

Peters said upon reviewing the assessment, The Forks leadership is looking at short- and long-term solutions for the bridge, which closed without notice in June 2023.

“The bridge is a vital access point to and through The Forks,” Peters said in an email. “It’s certainly a priority for us to get it reopened.”

Peters declined to discuss the findings in the engineering reports. A timeline for the bridge’s repair and reopening was not provided, with The Forks only saying it is in the process of determining a permanent solution.

Construction work on the 110-year-old bridge could be seen Thursday afternoon.

Active transportation advocate Mark Cohoe said with a $10-million price tag, The Forks should consider asking the city and province to chip in to fast-track the repair work.

“When it’s out of commission, it puts a fairly big hole in our (transportation) network,” said Cohoe, who serves as executive director of Bike Winnipeg.

The former railway structure, which allows pedestrians and cyclists to cross the Assiniboine River from South Point Park to The Forks, has been closed since a routine assessment revealed potential safety issues.

The Forks has not released significant updates to the bridge’s future since December, to the frustration of some who use the crossing.

Jas Patel once travelled the bridge regularly on his commute to work but now has to detour on sidewalks and streets.

He now rides down St. Mary’s Road and through downtown side streets, a commute that is longer and less safe, the cyclist said.

“The city already has few access points for bikes … it’s a pain to deal with,” Patel said while at The Forks Thursday.

The city has not been approached about sharing in the cost of repairs and it isn’t currently being considered in the capital budget, spokesperson Kalen Qually said in an email.

MIKAELA MACKENZIE / FREE PRESS
                                A timeline for the bridge’s repair and reopening has not been provided.

MIKAELA MACKENZIE / FREE PRESS

A timeline for the bridge’s repair and reopening has not been provided.

A provincial spokesperson declined to comment, saying the federal government holds jurisdiction over any funding for the bridge.

Peters did not say whether The Forks would seek external funds to help pay for the bridge repairs.

Patel said it could be worth tearing down the old bridge and building anew, but cyclists are anxious to have the access point reopened in any way.

“We need something back,” he said.

Arlington Bridge remains closed

Meanwhile, another city bridge, more than a century old, remains closed to traffic. The Arlington Bridge, which links downtown to the North End, shuttered in November 2023 after an inspection revealed the structure was beyond the point of repair.

Council is studying options to replace the 112-year-old bridge, including a $171-million bridge option that would involve closing Dufferin Avenue at Arlington Street. A second proposal would see a $180-million version travel over Dufferin, leaving it open for vehicle traffic.

In 2019, a preliminary design estimated a new bridge could cost $319 million.

nicole.buffie@freepress.mb.ca

Nicole Buffie

Nicole Buffie
Multimedia producer

Nicole Buffie is a reporter for the Free Press city desk. Born and bred in Winnipeg, Nicole graduated from Red River College’s Creative Communications program in 2020 and worked as a reporter throughout Manitoba before joining the Free Press newsroom as a multimedia producer in 2023. Read more about Nicole.

Every piece of reporting Nicole produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

Report Error Submit a Tip

More Stories

Letters, Oct. 2

6 minute read 2:00 AM CDT

Are clinical psychologists next?

Re: Province hires 17 psychiatrists to work in Winnipeg, Selkirk (Sept. 25)

Manitoba’s government has shown that it knows how to solve a specialist staffing crisis in health care. Clinical psychologists are still left to wonder when it will be their turn.

The Manitoba Psychological Society (MPS) welcomes the recent announcement of 17 new psychiatrists in the public system. Any investment in mental health deserves to be celebrated, especially in light of the Canadian Alliance on Mental Illness and Mental Health’s report card that was released in August 2026. Manitoba received overall grades of F and D for mental health and substance use health, respectively. Although disappointing, this is not surprising given that Manitoba spends five to six per cent of its health budget on mental health and addictions, about half the recommended rate of 12 per cent.

Port of Churchill signs agreement with Dutch port

Aaron Epp 2 minute read Preview

Port of Churchill signs agreement with Dutch port

Aaron Epp 2 minute read Tuesday, Sep. 29, 2026

Arctic Gateway Group, operator of the Port of Churchill, has signed an agreement with the Port of Rotterdam in the Netherlands to attract business and strengthen supply chains linking Western Canada and Europe.

The agreement enables the two ports to work together to develop new trade in critical minerals and energy products, connect Canadian producers with European buyers, and identify opportunities to improve the supply chain from Western Canadian resource projects through Churchill and into European markets.

The Port of Rotterdam is Europe’s largest port and home to more than 3,000 businesses across its industrial complex, serving as a major gateway for critical raw materials and energy.

Meanwhile, the Port of Churchill has been identified as a transformative national strategy for Canada and is emerging as a northern trade corridor connecting Western Canada’s resources to global markets.

Read
Tuesday, Sep. 29, 2026

Small businesses outline election priorities

Robin Bezte 5 minute read 2:00 AM CDT

Since moving to Winnipeg earlier this year, I have come to know the city through its small businesses. As a new Exchange District resident, grabbing coffee at Little Sister, walking through The Forks Market and stopping at Pho Hoang for lunch have become part of my routine. These are the places that give Winnipeg’s neighbourhoods their character and have helped make a new city feel like home.

That is why an empty storefront never feels like just vacant real estate. It represents someone’s investment and hope. When a small business disappears, the community loses a piece of itself.

On Oct. 28, Manitobans in most municipalities will choose their next mayors, reeves and councillors. While city councils may not set interest rates or negotiate global trade agreements, they do have some control over many of the barriers entrepreneurs encounter day to day, from property tax bills and permit applications to public safety and construction disruptions.

Ahead of the upcoming elections, the Canadian Federation of Independent Business (CFIB) surveyed Manitoba small business owners to get a sense of their municipal priorities and concerns.

Man accused of killing five family members fires second legal team, but murder trial won’t be delayed, judge warns

Dean Pritchard 4 minute read Preview

Man accused of killing five family members fires second legal team, but murder trial won’t be delayed, judge warns

Dean Pritchard 4 minute read Updated: Yesterday at 6:44 PM CDT

A Manitoba man accused of killing five family members is once again looking for new lawyers to represent him at trial.

But Ryan Manoakeesick will stand trial, with or without a lawyer in April 2027, a judge warned him Thursday.

“I want to be clear, Mr. Manoakeesick, that the trial dates that have been set are going to remain,” King’s Bench Justice Candace Grammond told him. “Those trial dates are effectively written in stone.

“You may think that is a long time in the future, but in a trial of this kind you need to make sure you have appropriate representation and you will be ready to attend to the matter on that date.”

Read
Updated: Yesterday at 6:44 PM CDT

As political jockeying begins, don’t forget job No. 1

Editorial 4 minute read Preview

As political jockeying begins, don’t forget job No. 1

Editorial 4 minute read Yesterday at 2:01 AM CDT

The goal, for all parties in a democracy, is to make the best legislation and bring in the strongest policy forward for voters and citizens.

Read
Yesterday at 2:01 AM CDT

Who protects collegiate athletes?

Brian Ramsay 4 minute read 2:00 AM CDT

College athletes need advocacy, before another life is lost.

They need an independent voice because, as the system stands, athletes speaking out for personal safety would end their positions on their teams. They need an advocate when their voices cannot be heard — and, more importantly, when they are being ignored or silenced.

What happened on Aug. 20 — when Arizona State University hockey player Matthew Mayich collapsed during a high-intensity outdoor workout — was not an accident. Mayich is still in hospital in critical condition.

When established processes and safeguards are alleged not to have been followed, the response cannot begin and end with the institution investigating itself and declaring nothing went wrong. Serious incidents demand transparency, accountability and independent scrutiny.