Bureaucrats urge Manwin Hotel should remain vacant Owner appeals city’s vacate order of 34 tenants

The city’s public service is urging the property and development committee to deny an appeal made by the Manwin Hotel’s owner to allow tenants back into the building.

Read this article for free:

or

Already have an account? Log in here »

To continue reading, please subscribe:

Subscribe and receive a limited-edition Free Press branded hat or tote.

Digital Subscription

One year of digital access for only $205*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles

*First annual payment billed as $205.00 + GST for one year. This annual subscription will automatically renew at $233.00 + GST every 52 weeks (10% off the regular annual price of $259.35). Offer available to new and qualified returning subscribers only. Cancel any time.

To continue reading, please subscribe:

Add Free Press access to your Brandon Sun subscription for only an additional

$1 for the first 4 weeks*

  • Enjoy unlimited reading on winnipegfreepress.com
  • Read the E-Edition, our digital replica newspaper
  • Access News Break, our award-winning app
  • Play interactive puzzles
Start now

*Your next Brandon Sun subscription payment will increase by $1.00 and you will be charged $17.95 plus GST for four weeks. After four weeks, your payment will increase to $24.95 plus GST every four weeks.

Hey there, time traveller!
This article was published 04/02/2025 (544 days ago), so information in it may no longer be current.

The city’s public service is urging the property and development committee to deny an appeal made by the Manwin Hotel’s owner to allow tenants back into the building.

In early January, the committee issued a vacate order to 34 residents of the notorious Main Street hotel amid multiple outstanding permit requirements and compliance orders.

The hotel’s owner, Akim Kambamba, appealed the order and a hearing is scheduled before the committee on Feb. 10.

SUPPLIED  
The City of Winnipeg vacate premises order points to hanging wiring and missing drywall at the Manwin Hotel.
SUPPLIED

The City of Winnipeg vacate premises order points to hanging wiring and missing drywall at the Manwin Hotel.

The building’s issues date back to 2017 when the city discovered the hotel’s 24 units had been subdivided into 34 units without proper permits, electrical work or inspections, a report says.

Several of the building’s original units were split up using partition walls and new doorways were built to separate the units, the report states.

In 2021, the department again issued compliance orders that were supposed to be completed by April 29, 2022, but went unfulfilled.

The department said in the report it has “shown extreme patience in waiting for the owner to bring the property into compliance.”

“There has been seven-plus years where the owner will do just enough work to demonstrate some forward progress in the permitting process. Meanwhile, there remains significant deficiencies and a lack of actual progress to bring the property into bylaw and code compliance,” the report says.

The hotel’s owner also owes the city more than $200,000 in penalties and fines for the shoddy work.

In January, Kambamba told the Free Press the vacancy order was issued due to a fire escape that was not up to code.

MIKAELA MACKENZIE / FREE PRESS FILES 
The City of Winnipeg issued a vacate order at the beginning of January, and the Manwin Hotel's owner has scheduled an appeal.
MIKAELA MACKENZIE / FREE PRESS FILES

The City of Winnipeg issued a vacate order at the beginning of January, and the Manwin Hotel's owner has scheduled an appeal.

City spokesman Kalen Qually would not comment on the property ahead of next week’s hearing.

Following a fire in a bathroom of the hotel in December, the city’s planning, property and development department ordered tenants vacate the premises no later than Jan. 17.

Kambamba couldn’t be reached for comment Tuesday.

The 143-year-old hotel has been the subject of violence, drug use and multiple homicides over the years and agencies and advocates have called for its closure. It was shut down by the province in February 2021 due to the building having no heat or water.

Kambamba blames nearby Main Street Project’s homeless shelter for the state of the building.

In a letter attached to the appeal report, the hotel owner said those who are turned away from the shelter come to the Manwin to sleep or stay warm and often do damage to suites and bathrooms.

MIKAELA MACKENZIE / FREE PRESS FILES 
The owner of the Manwin Hotel owes the city more than $200,000 in penalties and fines for the shoddy work.
MIKAELA MACKENZIE / FREE PRESS FILES

The owner of the Manwin Hotel owes the city more than $200,000 in penalties and fines for the shoddy work.

Akim pointed to a freedom of information request that showed Winnipeg Police Service dispatches to 637 Main St. (Main Street Project shelter) went to 1,583 in 2023 from 35 in 2020.

The property was vacant for the majority of 2020 until Main Street Project opened the doors to its 120-bed shelter on Dec. 18.

The same data show WPS dispatches to the Manwin at 655 Main St. stayed consistent throughout the years — 469 in 2023 and 401 in 2020.

Kambamba wrote he doesn’t bring in enough money to make the constant repairs to the building.

“Many of these people are homeless looking for shelter after being turned away from the Main Street project and other shelters when these facilities are full to capacity, especially in the winter. They are outside always causing damage to our property and the other buildings usually by breaking our windows and doors. We are constantly fixing all the damages,” Kambamba wrote.

The owner requested the vacate order be lifted to generate revenue that could be put back in the hotel in order to complete the outstanding orders.

MIKAELA MACKENZIE / FREE PRESS FILES 
The hotel's owner argued unhoused people have been causing damage to the building.
MIKAELA MACKENZIE / FREE PRESS FILES

The hotel's owner argued unhoused people have been causing damage to the building.

The latest inspection report says areas of concern include overall life, safety and livability conditions, mechanical (heating/cooling/plumbing), electrical, structural, fire separation requirements and egress paths.

In his letter, Kambamba claims all needed repairs are being actively addressed and will be completed on schedule for inspection.

nicole.buffie@freepress.mb.ca

Lawsuit to be pushed forward without a full trial

Main Street Project’s lawsuit against the neighbouring Manwin Hotel’s owners over claims of water damage will be decided without a full trial.

Main Street Project filed its lawsuit in the Court of King’s Bench in November 2023, alleging the slope of the hotel roof allowed rain water and melting ice to fall onto its office and emergency shelter, and had caused damage to its property as a result.

The shelter alleged the owner of the Manwin, at 655 Main St., had not taken any action, such as installing gutters, to mitigate the problem so its basement was damaged by repeated episodes of flooding.

The initial statement of claim, filed by Taylor McCaffrey LLP, sought an injunction to restrain the owner of the Manwin from diverting water from its roof onto Main Street Project’s roof, $50,000 in aggravated damages and other damages to be proven at trial, as well as court costs.

In pre-trial memos, Court of King’s Bench Justice Gerald Chartier said the claims at issue can be decided on through summary judgment, which would consist of a half-day court appearance, slated for May, rather than through a full trial.

“In particular, the issues raised in the statement of claim are narrow: whether at 655 Main St. causes rain water and snow melt to be diverted or discharged directly on to the adjoining property at 637 Main St., and if so, are there any damages that result, and if so, what is the appropriate quantum,” said Chartier in an August memo following a pre-trial conference earlier in the summer.

“While this will entail considering expert evidence, it is not a complex issue and there are no obvious credibility issues that arise.”

Chartier also said hearing a counterclaim filed by the hotel’s owner against Main Street Project should proceed to trial later, as its related to a “completely different issue.”

The owner alleged the shelter’s services and harm-reduction work hurts the hotel’s bottom line in the counterclaim, filed early last year.

— Erik Pindera

Nicole Buffie

Nicole Buffie
Multimedia producer

Nicole Buffie is a reporter for the Free Press city desk. Born and bred in Winnipeg, Nicole graduated from Red River College’s Creative Communications program in 2020 and worked as a reporter throughout Manitoba before joining the Free Press newsroom as a multimedia producer in 2023. Read more about Nicole.

Every piece of reporting Nicole produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press‘s tradition, since 1872, of producing reliable independent journalism. Read more about Free Press’s history and mandate, and learn how our newsroom operates.

Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber.

Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.

Report Error Submit a Tip

More Stories

Hydro scrambling to restore power to remaining 4,500 customers after storm; some outages will continue into Saturday

Chris Kitching 5 minute read Preview

Hydro scrambling to restore power to remaining 4,500 customers after storm; some outages will continue into Saturday

Chris Kitching 5 minute read Friday, Jul. 31, 2026

Power outages could stretch into a third day for some Manitobans — mainly in and around Winnipeg — while crews continued to repair widespread damage caused by powerful thunderstorms.

About 4,500 Manitoba Hydro customers were still without electricity at 2:30 p.m. Friday, after more than 30,000 lost power while powerful winds brought down trees and power lines Wednesday night and early Thursday.

The Crown corporation said it is aiming to have all outages with greater numbers of customers restored by Friday night, but some customers may remain without power into Saturday.

“The challenge is just the sheer scale of this thing — hundreds of different outages spread across a large part of the city,” Hydro spokesman Peter Chura said. “Just getting to all of them in a timely fashion is very difficult.”

Read
Friday, Jul. 31, 2026

Kreviazuk, in her own voice

Eva Wasney 7 minute read Preview

Kreviazuk, in her own voice

Eva Wasney 7 minute read Friday, Jul. 31, 2026

Chantal Kreviazuk is in the midst of a very busy year.

In May, the Winnipeg-born singer-songwriter released her 11th studio album, In My Own Voice — a project that reclaims and reimagines a selection of hit songs she’s written for some of the world’s biggest artists.

The 12-track album features Kreviazuk performing ethereal covers of Pitbull’s Feel This Moment, Drake’s Over My Dead Body and Gwen Stefani’s Rich Girl, among others.

But she didn’t stop there.

Read
Friday, Jul. 31, 2026

Domestic-duty distribution must suit you both

Maureen Scurfield 5 minute read Yesterday at 2:00 AM CDT

DEAR MISS LONELYHEARTS: I fear I’m going to end up with prolonged indigestion! My husband — a pretty boring cook — has decided it’s his turn to be the house parent again, and that I should go back to my profession, as he has come to hate his job.

I couldn’t be happier! He knows I love my work and I know he’s bored stiff by his accounting career. (He sometimes even has nightmares about numbers!)

The trouble is he’s a lousy housekeeper and cook. He’s patient and fun with our three kids, but I know that once he gets them off to school this fall, he’ll be on the couch watching TV until they get home.

I’m not looking forward to this. The place is always a wreck when he’s on home duty. Also, as soon as the kids come through the door, he makes them adult-sized sandwiches and store-bought snacks. So when I get home from work, they’re not hungry for a healthy dinner and my man certainly won’t be busy cooking up something nice for the two of us.

Puzzles Palace

1 minute read Monday, Jul. 27, 2026

To solve our puzzles, please subscribe with this special offer: |

Manitoba Hydro expects storm-related power outages to be repaired Saturday

Zoe Pierce 6 minute read Preview

Manitoba Hydro expects storm-related power outages to be repaired Saturday

Zoe Pierce 6 minute read Yesterday at 5:46 PM CDT

As Manitoba Hydro crews work to restore the last pockets of power following this week’s severe storms, some Winnipeg residents say the prolonged outages left them effectively stranded, unable to safely leave their apartments or charge essential mobility devices.

More than 30,000 Manitoba Hydro customers lost power after powerful storms swept across southern Manitoba Wednesday and Thursday, bringing down trees and power lines. Environment and Climate Change Canada recorded wind gusts of 133 km/h in Brandon, 113 km/h in Souris and 91 km/h in Winnipeg, along with more than 2,900 lightning strikes within 50 kilometres of the city.

In an update posted to social media Saturday morning, Manitoba Hydro said about 500 customers remained without power. The utility said it hoped to restore all remaining storm-related outages later in the day.

“Right now, we’re prioritizing customers that have been out the longest,” the post reads. “The final restoration work will still take time, in part because we’re dealing with small, localized outages and need to travel across a widespread area.”

Read
Yesterday at 5:46 PM CDT

Crop storage headaches loom on horizon

Laura Rance-Unger 5 minute read Preview

Crop storage headaches loom on horizon

Laura Rance-Unger 5 minute read Yesterday at 2:01 AM CDT

A sense of calm descends over Prairie fields this time of year — at least on the surface.

Activities become more limited in the weeks leading up to harvest. There’s not much farmers can do now to support this year’s crop, other than monitor and protect it from diseases such as sclerotinia in canola and leaf stripe and fusarium head blight in wheat and barley.

July is when you might see farmers wading into a thick stand of canola, conducting a so-called “wet pants test” to get a low-tech read on how much disease-inducing moisture is lurking in the canopy.

Disease pressure is high in a humid, hot summer like this one and it’s kept aerial applicators busy applying fungicides. Sclerotinia spores live on plant residues in the soil and blossom into a mould that destroys the canola stem, starving the maturing pods.

Read
Yesterday at 2:01 AM CDT